The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 9,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
553377Tender No
RG2/CVL/ET-107/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Formation of rest shed with old steel materials at Stores;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
20
34
690
... More
Formation of rest shed with old steel materials at Stores;Supplying and fixing NP soap dish heavy type with NP Screws
1
565
565.6
... More
Formation of rest shed with old steel materials at Stores;Supply and Fixing 15mm N.P bib tap Indian make heavy duty
1
580
580.6
... More
Formation of rest shed with old steel materials at Stores;Supplying and fixing TV shape mirror with plastic frame size 609.6x457.2mm
1
610
610.9
... More
Formation of rest shed with old steel materials at Stores;Supplying and Fixing Pedestal for Wash Hand Basin
1
1711
1711.3
... More
Formation of rest shed with old steel materials at Stores;Supplying and Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS: 2556 - Part-4:1972 with waste fittings like 32mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400grams Seiko/Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550x400mm - Single C.P. Pillar Cock
1
2533
2533.8
... More
Formation of rest shed with old steel materials at Stores;Extra depth of 450mm x 450mm Inspection Chamber beyond 450mm depth (Excluding cost of cement) Extra for every 0.100m (100mm) depth
3
455
1365.42
... More
Formation of rest shed with old steel materials at Stores;Construction of 450mm x 450mm and 450mm depth Inspection Chamber with CC 1:4:8 base of 150mm thick 40 mm Crushed Granite metal and 225 mm thick Brick masonary walls in CM 1:6 with fly ash bricks of size 225 x 100 x 60mm with 50kg/Sq. Cm Compressive strength and plastering with CM 1:4; 12mm thick including rendering the surfaces smooth both inside and outside and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600 X 600mm size with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earthwork excavation to the required depth etc; complete for finished item of work (but excluding cost of cement steel and its fabrication charges.)
3
3033
9100.77
... More
Formation of rest shed with old steel materials at Stores;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 22.20mm OD Pipe - SDR 11
25
230
5755
... More
Formation of rest shed with old steel materials at Stores;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 15.90mm OD Pipe - SDR 11
25
191
4790
... More
Formation of rest shed with old steel materials at Stores;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Plain Bend 87.5 degrees.- 110mm dia
4
104
418
... More
Formation of rest shed with old steel materials at Stores;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type - B Pipes (PVC/SWR pipe - 6 Kg/sq.cm) for soil and sullage water of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings. - For 110mm dia 3M Single socket pipe
4
1383
5534.4
... More
Formation of rest shed with old steel materials at Stores;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.
200
5
1140
... More
Formation of rest shed with old steel materials at Stores;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)
200
34
6820
... More
Formation of rest shed with old steel materials at Stores;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
1
9089
9089.2
... More
Formation of rest shed with old steel materials at Stores;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
1
14770
14770
... More
Formation of rest shed with old steel materials at Stores;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
1
10225
10225.4
... More
Formation of rest shed with old steel materials at Stores;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
1
18178
18178.4
... More
Formation of rest shed with old steel materials at Stores;Plastic emulsion Painting to New Internal walls with paint of Approved Make with 2 coats over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work - For Internal Walls
100
142
14280
... More
Formation of rest shed with old steel materials at Stores;Providing Superior quality wall care putty 2 coats for internal / external walls complete for finished Item of work.
108
119
12916.8
... More
Formation of rest shed with old steel materials at Stores;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter â?? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
12
8088
97059.6
... More
Formation of rest shed with old steel materials at Stores;Supply and fixing Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 as per Approved Make including the following Aluminium anodised fittings : conforming to relevant IS standards : Single Shutter a) 3 nos. 150 mm long butt hinges. ; b) 1 nos. 200 mm to 250 mm long tower bolt with 10mm dia shoot. c)2no.of 300mm long aldrop with 16mm dia rod. d) 2 no. 100 mm to 150 mm long grip handle. e) 1 no. foot door stopper with brass clip.
2
3837
7675.8
... More
Formation of rest shed with old steel materials at Stores;Supply and fixing Door frame of 100 x75mm with Medium teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)
5
1050
5254.5
... More
Formation of rest shed with old steel materials at Stores;Flooring with Nano polished /stain free vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622-2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement ) Note :- The same rate is applicable for Skirting / Risers
54
1003
54179.82
... More
Formation of rest shed with old steel materials at Stores;Providing and fixing Thermocole False ceiling 600mmx 600mm using 19mm thick Thermocole sheet, anodised Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross tee of size 24mm x 24.5mm x 2.4mm at every 600mm c/c and anodised aluminium wall angle of size 24mm x 24mm x 2.4mm fixed to periphery of the wall and the above grid is suspended at every 1200mm c/c in both directions using 2.0mm thick GI Wire including cost and conveyance of all materials to site etc., for finished item of work as directed. Holding down clips to be used for fixing Thermocole sheets.
54
639
34549.2
... More
Formation of rest shed with old steel materials at Stores;Binding wall 225x225mm size with brick in cement mortar 1:6 with fly ash bricks of compressive strength 50Kg/cm2 with 20mm thick plastering with cement mortar 1:6, with cornice 100x 100mm ( But Excluding Cost of Cement )
13
595
7735.13
... More
Formation of rest shed with old steel materials at Stores;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
65
796
51798.5
... More
Formation of rest shed with old steel materials at Stores;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
230
151
34904.8
... More
Formation of rest shed with old steel materials at Stores;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
28
6481
181474.44
... More
Formation of rest shed with old steel materials at Stores;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
0.5
13984
6992.2
... More
Formation of rest shed with old steel materials at Stores;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.
3
14652
43957.38
... More
Formation of rest shed with old steel materials at Stores;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.
1
10267
10267.16
... More
Formation of rest shed with old steel materials at Stores;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
63
393
24765.3
... More
Formation of rest shed with old steel materials at Stores;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
17
3483
59223.92
... More
Formation of rest shed with old steel materials at Stores;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
16
3440
55050.56
... More
Formation of rest shed with old steel materials at Stores;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
20
243
4864
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements