The Singareni Collieries Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Building Construction
Opening Date28 Jan 2025
Closing Date11 Feb 2025
Tender Amount₹ 9,52,246
Costs
EMD
₹ 10,650Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572500Tender No
BPA/CVL/N.1/EP-153(13)/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Add extra for A.C Sheet / GI Sheet roofing, side Sheeting - above 5m and up to 10m height
144
16
2390.4
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Extra Lifts for Plastering material and for Scaffolding / centering material - In 1st floor
400
16
6560
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Sunshades - In 1st floor
1
792
792.1
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Lintels - In 1st floor
1
589
589
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Extra lift charges for Brick Masonry items including lift for centering / shuttering charges (Floor height up to 3.66M) - In 1st floor
35
418
14661.5
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.
80
170
13664
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )
115
312
35980.05
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
0.25
13984
3496.1
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Supply of Structural Steel plates for the month of October - 2024 (Inclusive of 13.615% CP and OH)
0.21
69305
14554.09
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Supply of Structural Steel Angles/Channels/Beams/ Square Bars for the month of September - 2024(Inclusive of 13.615% CP and OH)
0.3
68169
20450.7
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Conveyance charges of CEMENT including loading, unloading and stacking charges for 5 KM lead.
7.34
276
2028.41
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.
2.2
317
698.98
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Binding wall 225x225mm size with brick in cement mortar 1:6 with fly ash bricks of compressive strength 50Kg/cm2 with 20mm thick plastering with cement mortar 1:6, with cornice 100x 100mm ( But Excluding Cost of Cement )
58
652
37844.42
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Providing and fixing of RCC 1:2:4 precast shelves 37mm thick with 6mm dia MS reinforcement at 125mm C/C both ways with 10mm size crushed granite metal of approved hard quality (without brackets) including necessary centering charges and plastering with CM 1:3, 12mm thick etc.,(but excluding cost of steel and Cost of Cement)complete as directed.(Cost of Fabrication of Reinforcement included)
14.04
396
5567.98
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Flyash Brick masonry with bricks of size 225x100 x60 mm with 50kg /cm2 Compressive strength in C.M.1:4 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete. For 100mm walls
18.9
899
16995.64
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls
250
167
41850
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.
300
130
39120
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.
1
11194
11194.69
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.
1
15579
15579.99
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
319
796
254211.1
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.
510
5
2907
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)
510
34
17391
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
0.5
10225
5112.7
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
0.5
18178
9089.2
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
1.5
9089
13633.8
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
1.5
14770
22155
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
400
157
62832.31
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
35
7297
255417.4
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Demolition of Reinforced Cement Concrete through Manual means including stacking of serviceable materials and disposal of unserviceable materials within 100mts lead.
2
2886
5772
... More
Repairs to record room in the first floor of GM office complex and replacement of damaged AC sheets;Demolition of Brick / Stone masonry in Cement Mortar through Manual means including stacking of serviceable materials and disposal of unserviceable materials within 100mts lead.
5
541
2709.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements