The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Building Construction
Opening Date27 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 94,90,127 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of shuttle court;Add extra for A.C Sheet / GI Sheet roofing, side Sheeting - above 5m and up to 10m height

500

16

8300

... More
Construction of shuttle court;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type - B Pipes (PVC/SWR pipe - 6 Kg/sq.cm) for soil and sullage water of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings. - For 75mm dia 3M Single socket pipe

10

895

8951

... More
Construction of shuttle court;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type - B Pipes (PVC/SWR pipe - 6 Kg/sq.cm) for soil and sullage water of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings. - For 110mm dia 3M Single socket pipe

15

1383

20754

... More
Construction of shuttle court;Supply of Tinted - Bronze/ Green Glass 5mm thick

8

657

5256

... More
Construction of shuttle court;Labour charges for making and fixing Aluminium Windows/ Ventilators as per approved drawing with aluminium anodized sections including cost of screws, bolts and nuts, beeding, weather strip, etc., excluding cost of aluminium sections and fixtures. The rate includes labour charges for fixing of glass/ particle boards.

10

877

8775

... More
Construction of shuttle court;Supply and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer Hardwyn make (IS: 3564) with double speed adjustment with necessary accessories and screws etc. complete (Type-3: for width of doors 851mm to 1000 mm)

10

1483

14838

... More
Construction of shuttle court;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

10

523

5233.4

... More
Construction of shuttle court;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

60

33

1993.2

... More
Construction of shuttle court;Cement Concrete 1:2:4 40mm thick for window sills/ Damp Proof Course using 10mm size Crushed Granite metal of approved hard quality including finishing the surface smooth and level using Concrete mixer (But Excluding Cost of Cement)

10

160

1609.4

... More
Construction of shuttle court;Providing Anti- termite treatment (Pre-constructional chemical treatment measures) along the internal and external vertical faces of the columns, Plinth Beams / Brace beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6313 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 litres/ sqm of the vertical surface and @ 5.0 litres/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns and 300 mm deep around Plinth Beams / Brace beams, basements and floor filling area including excavation channel along the wall and rodding etc and cost and conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge

240

368

88464

... More
Construction of shuttle court;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

300

393

117930

... More
Construction of shuttle court;Supply, Fabrication and Erection of Mild steel tubes for structural steel components like roof trusses, purlins, louvers, sag rods, rafters etc., including cost and conveyance of all materials to site, labour charges, all operational charges and including all materials like MS tubes and Pipes, welding rods, bolts, rivets and all contingencies, power charges, tackle, derric, crane etc., leads and lifts at site etc., complete as per drawings and insructions of the Engineer in charge.

15000

97

1465500

... More
Construction of shuttle court;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Side Walls above 100mm but upto 200mm thick.

18

15045

270819

... More
Construction of shuttle court;Plastering 20mm thick Two Coats with Base Coat of 16mm thick in cement mortar 1:6; and top coat of 4 mm thick in CM 1:4 with Sponge finishing etc., ( But Excluding Cost of Cement ) Complete for walls only

550

312

171946.5

... More
Construction of shuttle court;Varnishing/French Polishing to wood work - 2 coats - complete for finished item of work

35

184

6454

... More
Construction of shuttle court;Conveyance charges of CEMENT including loading, unloading and stacking charges for 3 KM lead.

140

255

35826

... More
Construction of shuttle court;Conveyance charges of Steel including loading, unloading and stacking charges for 3 KM lead.

38

297

11301.96

... More
Construction of shuttle court;Brushing of existing concrete surface with wire brush and providing cement concrete 1:2:4 screed of an average thickness of 20mm using 6mm size crushed granite metal of approved hard quality, and providing 2 layers of 24 guage rabbit wire mesh in the CC screed as nominal reinforcement and plastering with CM 1:4, 12mm thick including admixing of approved impervious water proofing compound as per manufacturers specification or @ 2% by weight of cement and finishing smooth and including providing slopes to drain off water etc., complete as directed (But Excluding Cost of Cement )

65

291

18944.25

... More
Construction of shuttle court;Extra Lifts for Plastering material and for Scaffolding / centering material - In 1st floor

300

16

4920

... More
Construction of shuttle court;Extra lift charges for Brick Masonry items including lift for centering / shuttering charges (Floor height up to 3.66M) - In 1st floor

15

418

6283.5

... More
Construction of shuttle court;Extra lift charges for Steel Reinforcement (Floor height up to 3.66M) - In 1st floor

2

1355

2711.2

... More
Construction of shuttle court;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Beams - In 1st floor

5

475

2379

... More
Construction of shuttle court;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Columns - In 1st floor

5

689

3449.5

... More
Construction of shuttle court;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

1200

796

956280

... More
Construction of shuttle court;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal of approved hard quality for precast RCC slabs, purlins, verandah posts, fencing posts etc. including machine mixing of Concrete, necessary shuttering, finishing etc including hoisting/fixing, cost and conveyance of all materials to work site, all labour charges, all operational incidental charges (excluding cost of steel and its fabrication charges and cost of cement) etc., complete for finished item of work, as directed. (CA : 0.90 Cum, FA:0.45Cum)

15

6753

101302.5

... More
Construction of shuttle court;Rate for conveyance of RCC socket and spigot pipes on all weather roading including loading Unloading and stacking (per metre of effective length) (for NP2 pipes). (Rate for every additional 1 Km. lead or part there of beyond 5KM initial lead is only payable) - For 150 mm Dia pipes

4000

-

1360

... More
Construction of shuttle court;Supplying, laying, jointing RCC NP2 hume pipes (socket and spigot) confirming to IS 458/2003, with necessary rubber rings (as per IS 5382/1985) cost and conveyance of all materials to site, labour charges, all operational charges etc complete as directed for finished item of Work For 150mm dia Pipes. NOTE:- Transportation of pipes includes up to 5 KM from Factory. For any extra lead, necessary extra lead charges may be added.

150

454

68235

... More
Construction of shuttle court;Extra depth of Circular Man Hole of Size 900mm dia( Excluding Rock cutting) beyond 450mm depth (Excluding cost of cement) Extra for every 0.100m(100mm) depth

60

682

40960.2

... More
Construction of shuttle court;Construction of 900mm dia and 450mm depth circular manhole with CC 1:4:8 base of 150mm thick with 40 mm Crushed Granite metal, 225mm thick Brick masonry walls in C.M 1:6 with Flyash bricks of size 225X100x60mm and having compressive strength of 50 kg/sqcm, plastering with CM 1:4,12mm thick including rendering the surfaces smooth both inside and outside and benching with 100mm thick CC 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600mm dia using 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earth work excavation to the required depth etc. complete for finished item of work (but excluding cost of cement, steel and its fabrication charges.)

12

4559

54708.6

... More
Construction of shuttle court;Extra depth of 450mm x 450mm Inspection Chamber beyond 450mm depth (Excluding cost of cement) Extra for every 0.100m (100mm) depth

12

463

5558.16

... More
Construction of shuttle court;Construction of 450mm x 450mm and 450mm depth Inspection Chamber with CC 1:4:8 base of 150mm thick 40 mm Crushed Granite metal and 225 mm thick Brick masonary walls in CM 1:6 with fly ash bricks of size 225 x 100 x 60mm with 50kg/Sq. Cm Compressive strength and plastering with CM 1:4; 12mm thick including rendering the surfaces smooth both inside and outside and channelling to required slope including supply and fixing precast RCC 1:2:4 cover of 50mm thick and 600 X 600mm size with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal, including earthwork excavation to the required depth etc; complete for finished item of work (but excluding cost of cement steel and its fabrication charges.)

6

3072

18436.08

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Plain Bend 87.5 degrees.- 110mm dia

14

104

1463

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Single Tee (With Door) - 110mm dia

14

161

2258.2

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Door Bend 87.5 degrees.- 110mm dia

12

134

1609.2

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC / SWR Traps ( as per ISI- standards ) - For 4 Inches(101.6mm)multi floor trap with jali

15

179

2692.5

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Vent Cowl - 110mm dia

6

23

143.4

... More
Construction of shuttle court;Supply of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand UPVC/ SWR Pipe (as per ISI- standards) fittings like bends, tees, Ys, etc., For Single Tee- 110mm dia

8

135

1081.6

... More
Construction of shuttle court;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type-A pipes (PVC / SWR pipe - 4Kg/sq.cm) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 75mm dia 3M Single socket pipe

5

675

3379

... More
Construction of shuttle court;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type-A pipes (PVC / SWR pipe - 4Kg/sq.cm) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 110mm dia 3M Single socket pipe

6

958

5752.2

... More
Construction of shuttle court;Supplying and Fixing 15mm PVC connection with brass union nut C.P coated

16

137

2193.6

... More
Construction of shuttle court;Supply and fixing 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality

6

33

198

... More
Construction of shuttle court;Supply and Fixing 15 mm NP stop cock Indian make heavy duty Seiko/ Senior/ Nice or equivalent

16

648

10371.2

... More
Construction of shuttle court;S and F of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931

6

908

5452.2

... More
Construction of shuttle court;Supplying and fixing of of 15 mm central hole Chromium plated finish brass body single lever basin mixer 450 mm long breaded pipe for hot & cold water mixing conforming to IS 8931 Jaquar make Queen series / Jupiter Aqua Lines-JAL or equivalent series with 10 years warranty

4

3721

14887.2

... More
Construction of shuttle court;Supply and fixing of PVC low level Cistern with internal components and short bend, 10 Ltrs capacity Dual flush

6

2217

13305.6

... More
Construction of shuttle court;Supplying and fixing 580 x 440mm Orissa pan white glazed W.C first quality ISI marked conforming to IS 2556 - part 3- 2004 with P or S trap

2

2399

4799.6

... More
Construction of shuttle court;Supply and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996

4

1369

5477.2

... More
Construction of shuttle court;Supplying and fixing wash down European water closet of first quality conforming to IS 2556-Part-2-2004 of white glazed with P trap. Plastic seat and lid is to be paid extra.

4

2118

8475.6

... More
Construction of shuttle court;Supplying and fixing of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty

4

3736

14946.4

... More
Construction of shuttle court;Supplying and fixing NP soap dish heavy type with NP Screws

6

565

3393.6

... More
Construction of shuttle court;Supplying and fixing 19.04mm dia and 609.6mm long aluminium anodized towel rod with brackets and aluminium screws

10

192

1923

... More
Construction of shuttle court;Supplying and fixing TV shape mirror with plastic frame size 609.6x457.2mm

4

610

2443.6

... More
Construction of shuttle court;Supplying and fixing white glazed flat back half stall urinals first quality conforming to IS 2556-1995 with standard C.P spreader of over all size 95x95x57mm conforming to Is-2556 part-6 sec 6/1974 fixing with screws complete Indian make of size 410x265x305mm

3

3697

11093.1

... More
Construction of shuttle court;Supplying and Fixing Indian make Flat Back Coloured Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with 32mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400grams Seiko/Senior/ Nice/Esso or equivalent complete with standard CI brackets including wooden block: 550x400mm - Single C.P. Pillar cock

4

3101

12405.6

... More
Construction of shuttle court;Supplying and fixing G.I union 15mm Ist Quality

19

53

1014.6

... More
Construction of shuttle court;Supplying and fixing G.I union 20mm Ist Quality

8

62

500

... More
Construction of shuttle court;Supplying and fixing G.I union 25mm Ist Quality

5

94

471.5

... More
Construction of shuttle court;Supplying and fixing G.I union 50mm Ist Quality

4

173

695.2

... More
Construction of shuttle court;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 15mm NB Size

6

752

4516.8

... More
Construction of shuttle court;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20mm NB Size

6

1008

6051

... More
Construction of shuttle court;Supplying and fixing Gunmetal Gate valve as per IS - 778 Class - I, Indian make heavy type - 25mm NB Size

4

1441

5765.2

... More
Construction of shuttle court;Supplying and fixing Gunmetal Gate valve as per IS-778 Class- I, Indian make heavy type - 50mm NB Size

2

4319

8639

... More
Construction of shuttle court;Supplying and fixing 15 mm Nominal Bore G.I pipe Medium Grade properties and weight as per IS 1239 ISI mark with G.I fittings including the cost of pipe and its fittings like sockets, elbows, bends, tees, etc., and labour charges complete

74

237

17545.4

... More
Construction of shuttle court;Supplying and fixing 20mm Nominal Bore G.I pipe Medium Grade properties and weight as per IS 1239 ISI mark with G.I fittings including the cost of pipe and its fittings like sockets, elbows, bends, tees, etc., and labour charges complete

75

264

19830

... More
Construction of shuttle court;Supplying and fixing 25 mm Nominal Bore G.I pipe Medium Grade properties and weight as per IS 1239 ISI mark with G.I fittings including the cost of pipe and its fittings like sockets, elbows, bends, tees, etc., and labour charges complete

50

347

17355

... More
Construction of shuttle court;Supplying and fixing 50 mm Nominal Bore G.I pipe Medium Grade properties and weight as per IS 1239 ISI mark with G.I fittings including the cost of pipe and its fittings like sockets, elbows, bends, tees, etc., and labour charges complete

75

581

43627.5

... More
Construction of shuttle court;Supplying and Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer Approved Make and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks

4000

9

38000

... More
Construction of shuttle court;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

1000

170

170800

... More
Construction of shuttle court;Painting to Wood work/ Plastered Surfaces with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of wood primer of Approved Make making 3 coats - To new work -all complete for finished item of work.

25

181

4545

... More
Construction of shuttle court;Acrylic exterior emulsion Painting to New walls with Grade-I i.e., Apex or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work For External Walls

550

183

101145

... More
Construction of shuttle court;Plastic emulsion Painting to New Internal walls with paint of Approved Make with 2 coats over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work - For Internal Walls

390

142

55692

... More
Construction of shuttle court;Providing Superior quality wall care putty 2 coats for internal / external walls complete for finished Item of work.

390

119

46644

... More
Construction of shuttle court;Whiting to New ceiling with Surya cem / Equivalent Cem, two coats complete for finished item of work.

90

43

3897

... More
Construction of shuttle court;Supplying Aluminium anodised Sections of approved make for Doors, partitions, windows, Ventilators (including anodisation cost) Confirming to IS 11857-1986

50

348

17440

... More
Construction of shuttle court;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

18

10225

184057.2

... More
Construction of shuttle court;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

18

18178

327211.2

... More
Construction of shuttle court;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

1000

5

5700

... More
Construction of shuttle court;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

1000

34

34100

... More
Construction of shuttle court;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter â?? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

36

8088

291178.8

... More
Construction of shuttle court;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, and 15mm x 15mm for top and bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC â??Câ?? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail and bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles and rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the â??Câ?? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturerâ??s specification and drawing for finished item of work including the Following Aluminium anodised fittings complete.: Single Shutter as per Approved Make a) 1no.of 200mm long aldrop with 16mm dia shoot. b) 2 nos. 200 to 250mm mm long tower bolt with 10mm dia shoot. c) 2 no. 100 mm to 150 mm long grip handle. d) 3 nos.150 mm long butt hinges.

11

3295

36246.1

... More
Construction of shuttle court;Providing and fixing PVC Door Frame of the size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2Nos. of 150mm long brackets of 15x15mm M.S square tube. The two vertical door profiles are to be reinforced with 19x19mm MS Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long MS screws through the frame by using PVC fasteners. A minimum of 4Nos. of screws to be provided for Each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-charge for finished item of work as per Approved Make

40

357

14316

... More
Construction of shuttle court;Supply and fixing Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 as per Approved Make including the following Aluminium anodised fittings : conforming to relevant IS standards : Single Shutter a) 3 nos. 150 mm long butt hinges. ; b) 1 nos. 200 mm to 250 mm long tower bolt with 10mm dia shoot. c)2no.of 300mm long aldrop with 16mm dia rod. d) 2 no. 100 mm to 150 mm long grip handle. e) 1 no. foot door stopper with brass clip.

22

3837

84433.8

... More
Construction of shuttle court;Supply and fixing Door frame of 125 x62mm with Medium teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S. flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)

70

1080

75649

... More
Construction of shuttle court;Providing plinth protection work with 50mm thick CC 1:3:6 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded Crushed granite metal together with a bed of 75mm thick CC 1:5:10 using 40mm Crushed granite metal well rammed, consolidated including finishing the top smooth duly maintaining the required slopes to drain off water as per site conditions including cost and conveyance of all materials to site of work, all labour, operational, and incidental charges and necessary side support for concrete while laying etc., complete for finished item of work (to a total thickness of 125mm). ( But Excluding Cost of Cement ) using Machine mixing

225

569

128196

... More
Construction of shuttle court;Providing Dadooing to walls with ceramic wall tiles of size 300x450mm / 320mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

170

817

139015.8

... More
Construction of shuttle court;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

45

860

38733.3

... More
Construction of shuttle court;Flooring with Double charged / multi charged stain free vitrified tiles with double layer pigment of size 800 x 800 mm and thickness between 9-11 mm 1st quality conforming to IS:15622-2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement ) Note :- The same rate is applicable for Skirting / Risers

340

1223

415969.6

... More
Construction of shuttle court;20 mm thick plain cement mortar bands in cement mortar 1:4 up to 300 mm in width for elevations and drip moulds etc.,- Raised Band (But Excluding Cost of Cement )

6

593

3560.76

... More
Construction of shuttle court;Plastering to brick masonry with cement mortar 1:4, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

20

148

2960.6

... More
Construction of shuttle court;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )

90

161

14573.7

... More
Construction of shuttle court;Plastering 15 mm thick Two Coats with Base Coat of 11mm thick in cement mortar 1:6; and top coat of 4mm thick in CM 1:4 with sponge finishing etc., ( But Excluding Cost of Cement ) Complete for walls only

580

305

177132

... More
Construction of shuttle court;Reinforced Flyash Brick masonry with bricks of size 225x100 x60 mm with 50kg /cm2 Compressive strength in C.M.1:4 and using two mild steel bars of 6mm dia in every third layer of brick masonry, with free joints in to the main block work for superstructure including scaffolding, and fabrication charges of steel etc., (But Excluding Cost of Cement and cost of steel ) complete. For 100mm walls

30

868

26058.6

... More
Construction of shuttle court;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

104

6002

624302.64

... More
Construction of shuttle court;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

20

13984

279688

... More
Construction of shuttle court;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

90

3478

313020

... More
Construction of shuttle court;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)

1.25

4622

5778.25

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For roof Slab - up to 150mm thick.

8

8220

65764

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For roof Beams.

3

9556

28668

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Sunshades.

3

14646

43940.1

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Lintels.

1

10261

10261.4

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Plinth Beams / Brace beams.

18

9678

174205.8

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Columns.

26

10283

267368.4

... More
Construction of shuttle court;Reinforced Cement Concrete M-20 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 350Kg/Cum of concrete is to be used. - For Column Footings / Raft.

95

6977

662815

... More
Construction of shuttle court;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

112

3434

384708.8

... More
Construction of shuttle court;Conveyance charges of Earth for 4 KM lead.

220

91

20152

... More
Construction of shuttle court;Conveyance charges of Earth for 2 KM lead.

350

56

19810

... More
Construction of shuttle court;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

440

34

15180

... More
Construction of shuttle court;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

670

119

80065

... More
Construction of shuttle court;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

150

243

36480

... More
Construction of shuttle court;Clearing light jungle / Shrub jungle

900

3

3420



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.