The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Building Construction
Opening Date13 Dec 2024
Closing Soon27 Dec 2024
Tender Amount₹ 10,44,309
Costs
EMD
₹ 11,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
562465Tender No
RG2/CVL/ET-129/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Conveyance charges of CEMENT including loading, unloading and stacking charges for 5 KM lead.
24.5
276
6766.9
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.
1.6
317
508.35
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)
3
4649
13947.06
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls
530
167
88722
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.
50
170
8540
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Supply, Fabrication and Erection of Mild steel tubes for structural steel components like roof trusses, purlins, louvers, sag rods, rafters etc., including cost and conveyance of all materials to site, labour charges, all operational charges and including all materials like MS tubes and Pipes, welding rods, bolts, rivets and all contingencies, power charges, tackle, derric, crane etc., leads and lifts at site etc., complete as per drawings and insructions of the Engineer in charge.
800
97
78160
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
0.6
10225
6135.24
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
0.6
18178
10907.04
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Providing coping with fly ash brick masonry with bricks of 50 Kg/Sq.Cm. compressive strength over 225 mm thick brick walls with 340x340mm square pillars up to 3m c/c with brick in CM1:6 over the entire length including pillar portion and plastering the sides and bottom with cement mortar 1:6,12mm thick , and top with 12mm thick at ends and 20mm thick at center etc., ( But Excluding Cost of Cement ) complete:
4
8107
32431.52
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
360
151
54705.6
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
2
6709
13419.36
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.
42
5991
251653.5
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
230
393
90413
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
65
3504
227787.3
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
10
3461
34613.2
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
20
243
4864
... More
Repairs or reconstruction of small portion of compound wall at PO office, OCP III;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth
75
119
8962.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%