The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Civil Works Others
Construction Works
Opening Date24 Feb 2022
Closing Date11 Mar 2022
Tender Amount₹ 5,73,141 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
299180Bid Award Id
ViewTender No
MMR/CVL/E-MM/T-117-2021-22Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Conveyance charges of Steel including loading & unloading charges - Up to 5 KM.
8
-
1856.16
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work
120
-
14700
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Conveyance charges of Earth - Lead Upto 2 KM. Note:- 1). Loading charges to be applied for manual loading only. 2). Unloading/ stacking charges need not be paid for this material.
100
-
4410
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Excavation for Road work in soil with Hydraulic Excavator 0.9cum bucket capacity including cutting and loading in tippers / pushing the earth to side of embankment (by trench cutting) including trimming bottom and side slopes, in accordance with requirements of lines and grades and cross sections as per technical specification 301 of MORT & H
100
-
5680
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Painting with Synthetic enamel paints of grade II paints to new Iron work, two coats including a base coat of Red oxide primer paint grade-1 making three coats in all, complete for finished item of work.
200
-
27400
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )
15
-
3453.45
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
120
-
13927.2
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.
11
-
53167.07
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) (Excluding cost of sand)
100
-
2470
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Roofing/side sheeting with Pre-Painted Galvalume sheets of thickness 0.50mm PPGL AZ150, 550 MPA YS fixed with Suitable bolts, nuts, & washers, including fixing of wind ties as per the requirement etc., & including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
175
-
96722.5
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
2
-
29540
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and insructions of the Engineer in charge.
2
-
34084.6
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
4.5
-
76690.35
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and insructions of the Engineer in charge.
4.5
-
92028.15
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Supply and fixing minimum of 25mm to 30mm thick polished Black Kadapa single slab of required size as directed by the Engineer-in-charge with exposed faces square cut and well polished, on existing Walls, with grey Cement Slurry of honey like consistency spread at the rate of 3.30Kg./Sqm. including cost and conveyance all materials and water to work site and all operational, incidental, labour charges, dressing and fixing of stones in position rubbing curing etc., complete for Kitchen Platform / Shelves as directed (But Excluding Cost of Cement)
4.5
-
1332
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Supply and fixing 12mm thick window shutters with plain Cement bonded particle board (bison panel or equivalent) conforming to IS 14276 with alround U section of size 12x18mm x 12mm made from 0.60mm thick galvanised colour coated cold rolled steel profiles with necessary srews fixed at every 1foot (304.8mm) intervals, fixing to the existing angle iron frame along with the following MS Powder coated fittings of approved make and applying 1coat of primer, one coat of luppam and 2 coats of Synthetic enamel paints as per approved design including cost and conveyance of all materials to site, all labour charges etc.,complete for finished Item of work as directed. a) 150mm tower bolts with 10mm dia shoot - 2No.s per leaf b) 125mm long grip handles - 1No. per leaf c) 250mm long window casements- 1No. per leaf d) 200mm to 225mm long T- hinges 2nos per leaf
2.16
-
2792.23
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Supply and fixing of Cement Bonded Particle Board(IS 14862) door shutters using with 16MM Cement Bonded Particle Board with all round style U size of 20mmx18mm x20mm made from 0.8mm thick galvanized pre-painted cold rolled steel profiles with Cement Bonded Particle Board separating two shutter with 30mmx18mmx30mm Stepped lipping including cost and conveyance of all materials at site and applying one coat of primer, 2 coats of luppam and 2 coats of synthetic enamel paint as per approved design for finished item of work - Cement Bonded Particle Board (IS 14862) DOUBLE DOOR SHUTTER with necessary screws fixed at every 1(304.8mm) intervals and including the following MS powder coated fittings complete finished item of work as per Approved Make a). 250 mm long aldrops 2nos., b). 250mm long tower bolt with 10mm dia shoot- 2nos c). 2nos 125 mm long grip handle d) 2 Nos. Door Stopper
2
-
4146.4
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Supply and fixing Door frame of 100 x75mm with Non teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)
5
-
2778.5
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.
40
-
180
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)
40
-
1180
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Erection of compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete
410
-
1845
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Fabrication of steel works like compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete including cost of welding rods, power charges etc., complete.
0.41
-
6987.34
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Supply of Structural steel Flats for the month of October - 2021(Including 13.615% CPOH) NOTE: The rate is for material at site.
0.5
-
30676.05
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
1.5
-
16055.7
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) for Plinth Beams / Brace beams. (CA : 0.90 Cum, FA:0.45Cum)
7
-
56883.33
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) for Pedestals. (CA : 0.90 Cum, FA:0.45Cum) (Effective length of which does not exceed 3 times the least lateral dimension).
6
-
38237.34
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) - for Column Footings. (CA : 0.90 Cum, FA:0.45Cum)
6
-
35417.94
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
9
-
28733.31
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308). - Ordinary Soil-Manual Means-Up to 3 m depth
25
-
4342.5
... More
Construction of tub repair /black smith shed at kasipet1A incline at MM area;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308). - Ordinary soils-Mechanical Means-Up to 3 m depth
100
-
9750
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements