The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Civil And Construction
Building Construction
Opening Date19 Jan 2022
Closing Date15 Feb 2022
Tender Amount₹ 9,36,841 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of stage cum rest hall at new SRP CHP;Conveyance charges of Steel including loading & unloading charges - Beyond 5KM and up to 30 KM (Rate/KM)

1.5

-

11.85

... More
Construction of stage cum rest hall at new SRP CHP;Conveyance charges of Steel including loading & unloading charges - Up to 5 KM.

1.5

-

348.03

... More
Construction of stage cum rest hall at new SRP CHP;Conveyance charges of Cement including loading & unloading charges - Beyond 5KM and up to 30 KM (Rate/KM)

22.45

-

177.34

... More
Construction of stage cum rest hall at new SRP CHP;Conveyance charges of Cement including loading & unloading charges - Up to 5 KM.

22.45

-

4540.33

... More
Construction of stage cum rest hall at new SRP CHP;Supply, Fabrication and Erection of Mild steel tubes for structural steel components like roof trusses, purlins, louvers, sag rods, rafters etc., including cost and conveyance of all materials to site, labour charges, all operational charges and including all materials like MS tubes and Pipes, welding rods, bolts, rivets and all contingencies, power charges, tackle, derric, crane etc., leads and lifts at site etc., complete as per drawings and insructions of the Engineer in charge.

3000

-

256800

... More
Construction of stage cum rest hall at new SRP CHP;Erection of compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete

250

-

1125

... More
Construction of stage cum rest hall at new SRP CHP;Fabrication of steel works like compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete including cost of welding rods, power charges etc., complete.

0.25

-

4260.58

... More
Construction of stage cum rest hall at new SRP CHP;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete

1.12

-

19087.38

... More
Construction of stage cum rest hall at new SRP CHP;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and insructions of the Engineer in charge.

1.12

-

22904.78

... More
Construction of stage cum rest hall at new SRP CHP;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.

50

-

1480

... More
Construction of stage cum rest hall at new SRP CHP;Painting with Synthetic enamel paints of grade II paints to new Iron work, two coats including a base coat of Red oxide primer paint grade-1 making three coats in all, complete for finished item of work.

150

-

20550

... More
Construction of stage cum rest hall at new SRP CHP;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )

190

-

41452.3

... More
Construction of stage cum rest hall at new SRP CHP;Roofing/side sheeting with Pre-Painted Galvalume sheets of thickness 0.50mm PPGL AZ150, 550 MPA YS fixed with Suitable bolts, nuts, & washers, including fixing of wind ties as per the requirement etc., & including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)

185

-

102249.5

... More
Construction of stage cum rest hall at new SRP CHP;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

50

-

5456.5

... More
Construction of stage cum rest hall at new SRP CHP;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.

6

-

26963.7

... More
Construction of stage cum rest hall at new SRP CHP;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

1.5

-

16055.7

... More
Construction of stage cum rest hall at new SRP CHP;Reinforced Cement Concrete 1:1.5:3 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) for Columns.

11

-

84626.74

... More
Construction of stage cum rest hall at new SRP CHP;Reinforced Cement Concrete 1:1.5:3 with 20mm down size (65% of 20-10mm & 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) for Column footings. (CA : 0.90 Cum, FA:0.45Cum)

12

-

67218.48

... More
Construction of stage cum rest hall at new SRP CHP;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, necessary Centering, shuttering charges etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)

20

-

62082.8

... More
Construction of stage cum rest hall at new SRP CHP;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

27

-

78060.78

... More
Construction of stage cum rest hall at new SRP CHP;Conveyance charges of Earth - Lead Upto 2 KM. Note:- 1). Loading charges to be applied for manual loading only. 2). Unloading/ stacking charges need not be paid for this material.

26

-

1146.6

... More
Construction of stage cum rest hall at new SRP CHP;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) (Excluding cost of sand)

151

-

3729.7

... More
Construction of stage cum rest hall at new SRP CHP;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308). - Ordinary soils-Mechanical Means-Up to 3 m depth

125

-

12187.5

... More
Construction of stage cum rest hall at new SRP CHP;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308). - Ordinary Soil-Manual Means-Up to 3 m depth

50

-

8685



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.