The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
512462Bid Award Id
ViewTender No
RG2/CVL/ET-01/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Flooring 30mm thick with CC 1:2:4 using 10mm size crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )
18
239
4307.76
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
12
3504
42053.04
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
120
151
18235.2
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.
12
5991
71901
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
8
3461
27690.56
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
40
243
9728
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Supplying and laying of sand in filter beds with all leads and lifts ( Note: 1/8 th will be deducted for voids)
22
1642
36126.2
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Supplying and laying of 20mm size Crushed granite variety metal in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)
30
1914
57426
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Supplying and laying of 40mm size granite variety metal in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)
40
1395
55836
Construction of rain water harvesting pits(percolation tanks) and drains at different location of su;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth
100
119
11950
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements