The Singareni Collieries Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Drainage Work
Opening Date26 Feb 2025
Closing Date13 Mar 2025
Tender Amount₹ 62,04,911 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of RCC drain;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.

19

317

6036.68

... More
Construction of RCC drain;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

12

393

4717.2

... More
Construction of RCC drain;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded crushed granite metal of approved hard quality including machine mixing, vibrating with necessary shuttering and centering charges, etc., Complete for finished Item of work as directed for Substructure of CD works i.e, abutments / peirs / wing walls / returns etc., up to a height of 5M as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 and 2200 MORTH (Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)

3

4023

12071.97

... More
Construction of RCC drain;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

19

13984

265703.6

... More
Construction of RCC drain;Reinforced cement concrete grade M 25 Design Mix with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal of approved hard quality including machine mixing, vibrating with necessary shuttering and centering charges, etc., Complete for finished Item of work as directed for Super structure of CD works i.e., Deck slab complete as per drawings and technical specification Clauses 800, 1205.5 MORD / sections 1500, 1600 and 1700 MORTH (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) Cement @ 380Kg/Cum is to be used. (CA : 0.90 Cum, FA:0.45Cum)

10

5420

54203.9

... More
Construction of RCC drain;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal of approved hard quality for precast RCC slabs, purlins, verandah posts, fencing posts etc. including machine mixing of Concrete, necessary shuttering, finishing etc including hoisting/fixing, cost and conveyance of all materials to work site, all labour charges, all operational incidental charges (excluding cost of steel and its fabrication charges and cost of cement) etc., complete for finished item of work, as directed. (CA : 0.90 Cum, FA:0.45Cum)

4

6947

27790.36

... More
Construction of RCC drain;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Side Walls up to above 200mm but upto 300mm thick.

17

11758

199892.63

... More
Construction of RCC drain;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Side Walls above 100mm but upto 200mm thick.

236

15239

3596543.24

... More
Construction of RCC drain;Reinforced Cement Concrete M-25 design mix Concrete corresponding to IS 456 using Concrete Mixer with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/ shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum). Cement @ 380Kg/Cum of concrete is to be used. - For Column Footings / Raft.

170

7171

1219085.3

... More
Construction of RCC drain;Cement Concrete 1:4:8 with 40 mm Crushed granite metal of approved hard quality in foundations of CD works including machine mixing, vibrating with necessary shuttering etc., Complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 MORD and 1500, 1700 and 2100 MORTH (But Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)

160

3565

570414.4

... More
Construction of RCC drain;Clearing light jungle / Shrub jungle

1800

3

6840

... More
Construction of RCC drain;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

100

243

24320

... More
Construction of RCC drain;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

1300

119

155350



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.