For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Pipe Line Project
Opening Date15 Apr 2024
Closing Date3 May 2024
Tender Amount₹ 12,30,077 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Conveyance charges of CEMENT including loading, unloading and stacking charges for 4 KM lead.

9.15

266

2433.9

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) - by Manual Means

10

1472

14721

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing and vibrating with mechanical vibrator finishing to the required camber for CC Pavements including necessary side shuttering etc., Complete for finished Item of work as directed (Excluding Cost of Cement).(CA : 0.90 Cum, FA:0.45Cum) Note:- In case of provision of steel reinforcement, fabrication charges for the same are to be paid separately.

10

3497

34973.9

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Cement Concrete 1:4:8 with 40mm down size (Crushed Granite metal of approved hard quality including machine mixing and vibrating with mechanical vibrator finishing to the required camber for CC Pavement sub grade including necessary side shuttering etc., Complete for finished Item of work as directed ( Excluding Cost of Cement).(CA : 0.90 Cum, FA:0.45Cum)

15

3251

48772.35

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.

0.5

14770

7385

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

2000

34

69000

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Supplying and fixing of CI D/F non return valves Heavy Duty Round Body conforming to IS 5312 / Part 1/ 1984. with amendments No. 1and2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for(closed end Test) against Hydrostatic test requirement. The rates are including transportation, etc., complete. The operation can be done with hand wheel/cap. ISI Marked - PN-1.6 For 200 mm Dia

1

28921

28921.7

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Supplying and fixing of CI D/F Sluice valves conforming to IS 14846 /2000 with amendments No. 1and2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for (closed end Test) against Hydrostatic test requirement. The operation can be done with hand wheel / cap. The rates are including transportation and including cost of bolts, nuts, rubber insertion etc., complete. ISI Marked. - PN-1.6 For 200 mm Dia

2

30361

60723.6

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Supplying and fixing of CI D / F Kinetic Air valves Heavy Duty suitable for working pressure upto 16 Kg / Sq.Cm without isolating Valve Conforming to IS 14845 including transportation, and including cost of jointing materials such as bolts, nuts and rubber insertions etc., complete(PN 1.6) For 100mm Dia

3

11020

33060

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) of graded crushed granite metal of approved hard quality for Pedestals / Beds including machine mixing, vibrating with mechanical vibrators, centering/shuttering charges, etc, Complete. (But Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)

10

5707

57071.9

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Welding charges for M.S / G.I pipe joint i.e., pipe to pipe or flange to pipe with all companys pipes / fittings but with contractors welding plant and electrodes etc., complete as directed - For 200mm dia

70

337

23618

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Labour charges for laying and jointing of 200mm dia M.S pipes and fittings with flanged ends, with contractors Bolts and Nuts , gasket, etc. complete as directed

2000

133

267600

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

20

243

4864

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete

2000

68

136200

... More
Labour charges for laying and jointing of 200 mm dia MS Raw water pipe line from cone Raw water sump;Clearing light jungle / Shrub jungle

1000

3

3800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.