The Singareni Collieries Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 27,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577776Tender No
RG-III/CVL/ET-83/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Conveyance charges of CEMENT including loading, unloading and stacking charges for 5 KM lead.
14.83
276
4095.77
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Conveyance charges of Steel including loading, unloading and stacking charges for 2 KM lead.
10
284
2844.2
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.
350
170
59780
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Painting with two coats of Synthetic enamel paints of grade - II paints of Approved Make and Shade to Old Iron work - complete for finished item of work.
400
103
41200
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Colour washing to OLD WALLS with Surya Cem / Equivalent Cem adding required colour two coats complete for finished Item of work.
650
28
18200
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;White washing to Old walls with Surya Cem / Equivalent Cem, two coats complete for finished item of work.
600
26
15720
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Plastering to brick / stone masonry with cement mortar 1:6, 20 mm thick in two coats including raking out of joints for walls only ( But Excluding Cost of Cement )
50
318
15929.5
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Dismantling / Removing old Cement mortar plaster through Manual means
50
9
475
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
100
153
15338
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
10
6724
67243.1
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
245
393
96309.5
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
42.72
3487
148976.17
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)
5
4631
23159.35
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
16.2
3444
55795.55
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Demolishing Plain Cement Concrete through Manual means and disposal of unserviceable materials within 100 metres lead - more than 15 cm thickness.
4.58
3260
14944.3
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
6
243
1459.2
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth
100
119
11950
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Labour charges for fixing galvanised steel barbed wire (For Each strand) Rate includes cost of required binding wire.
1760
4
7392
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Supply of Galvanized steel barbed wire Conforming to IS 278 -1978 Type A -4 Point barbs round both line wires 75mm apart with 12 SWG line wire with a minimum mass of 9.38 Kg per 100M.
250
107
26975
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Labour charges for fixing Companys chain link fence duly cutting to the required sizes, fixed with MS Flats on existing pre cast RCC / MS Angle posts with Companys material.
320
11
3648
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Supply of Hot dipped Galvanized Iron chain link mesh 8 gauge (4.0mm) as per IS 2721-1979(50mm x 50mm)
320
619
198144
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Supply of Structural steel flats for the month of January - 2025 (Inclusive of 13.615% CP and OH)
0.2
68169
13633.8
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Erection of compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete
6000
8
48000
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Fabrication of steel works like compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete including cost of welding rods, power charges etc., complete.
6000
18
109200
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Add extra for A.C Sheet / GI Sheet roofing, side Sheeting - above 5m and up to 10m height
1150
16
19090
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
1150
796
916435
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Dismantling G.I sheets, AC Sheets in Sides and Roof including ridging etc.,
1150
71
82685
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
14
9089
127248.8
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
4
14770
59080
... More
Repair to material stocking shed at CHP OCP I, RG III Area.;Dismantling Steel Work in all Types of Sections including stacking of dismantled material with all lifts and lead - For Including dismembering
10
2529
25297
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%