The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Water Storage And Supply
Opening Date16 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 7,23,904
Costs
EMD
₹ 7,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
562870Tender No
RG-III/CVL/ET-57/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
maintenance of water supply OCM1;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
200
34
6900
... More
maintenance of water supply OCM1;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete
200
68
13620
... More
maintenance of water supply OCM1;Supplying and fixing of CPVC unions - For 15 mm (1/2 inch) union
10
77
771
... More
maintenance of water supply OCM1;Supplying and fixing of CPVC unions - For 20mm (3/4 inch) union
10
96
965
... More
maintenance of water supply OCM1;Supplying and fixing of CPVC unions - For 25mm (1 inch) union
20
120
2406
... More
maintenance of water supply OCM1;Supplying and fixing of CPVC unions - For 50mm (2 inch) union
10
452
4521
... More
maintenance of water supply OCM1;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 54.00mm OD Pipe - SDR 11
25
665
16625
... More
maintenance of water supply OCM1;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 28.60mm OD Pipe - SDR 11
10
273
2734
... More
maintenance of water supply OCM1;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 22.20mm OD Pipe - SDR 11
20
230
4604
... More
maintenance of water supply OCM1;Supply and Fixing of CPVC Pipes along with Fittings to meet the requirement of ASTM-D 2846 etc., complete - For 15.90mm OD Pipe - SDR 11
20
191
3832
... More
maintenance of water supply OCM1;Supplying and Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer Approved Make and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks
2000
9
19000
... More
maintenance of water supply OCM1;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20mm NB Size
20
1008
20170
... More
maintenance of water supply OCM1;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 15mm NB Size
10
752
7528
... More
maintenance of water supply OCM1;Supplying and fixing of 15 mm brass body Premium variety Chromium plated finish long neck pillar cock with aerator of not less than 500grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years
10
1296
12961
... More
maintenance of water supply OCM1;Labour charges for Laying and Jointing G.I. pipes and specials or fittings including cost of jointing materials like lead, hemp yarn etc., but excluding the cost of pipes.(excavation of trench and refilling trenches after laying and jointing pipes will be paid separately)- For 100 mm dia G.I. pipes
100
91
9160
... More
maintenance of water supply OCM1;Clearing light jungle / Shrub jungle
1000
3
3800
... More
maintenance of water supply OCM1;Supply and fixing 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality
50
33
1650
... More
maintenance of water supply OCM1;Supplying and Fixing 15mm PVC connection with brass union nut C.P coated
50
137
6855
... More
maintenance of water supply OCM1;Supplying and fixing G.I union 50mm Ist Quality
20
173
3476
... More
maintenance of water supply OCM1;Supplying and fixing G.I union 25mm Ist Quality
20
94
1886
... More
maintenance of water supply OCM1;Supplying and fixing G.I union 20mm Ist Quality
20
62
1250
... More
maintenance of water supply OCM1;Supplying and fixing G.I union 15mm Ist Quality
20
53
1068
... More
maintenance of water supply OCM1;Supply and fixing of 15 mm brass body CP finish bib Cock of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931
50
297
14895
... More
maintenance of water supply OCM1;Supply and Fixing 15mm N.P bib tap Indian make 300 grams
50
373
18655
... More
maintenance of water supply OCM1;Supply of PVC Bib cock
100
136
13630
... More
maintenance of water supply OCM1;Supplying and fixing Gunmetal Gate valve as per IS-778 Class- I, Indian make heavy type - 50mm NB Size
8
4319
34556
... More
maintenance of water supply OCM1;Supplying and fixing Gunmetal Gate valve as per IS - 778 Class - I, Indian make heavy type - 25mm NB Size
5
1441
7206.5
... More
maintenance of water supply OCM1;Labour charges for Laying and Jointing G.I. pipes and specials / fittings including cost of jointing materials like lead, hemp yarn etc., but excluding the cost of pipes.(excavation of trench and refilling trenches after laying and jointing pipes will be paid separately )- For 50 mm dia G.I. pipes
20
34
682
... More
maintenance of water supply OCM1;Supply of M.S Threaded flanges including necessary packing materials, bolts, washers and nuts and transportation complete. (Fixing charges are included in pipe line Item.) - For 100mm dia ; 12mm thick
10
670
6707
... More
maintenance of water supply OCM1;Supply of M.S Threaded flanges including necessary packing materials, bolts, washers and nuts and transportation complete. (Fixing charges are included in pipe line Item.) - For 50mm dia ; 12mm thick
10
328
3285
... More
maintenance of water supply OCM1;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
5
393
1965.5
... More
maintenance of water supply OCM1;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
2
3487
6974.54
... More
maintenance of water supply OCM1;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
2
3444
6888.34
... More
maintenance of water supply OCM1;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)
2
4631
9263.74
... More
maintenance of water supply OCM1;Removing old G.I. pipes and specials / fittings and cleaning, scraping the pipes, hoisting and keeping within 50m lead but excluding earth work excavation of trenches and refilling For 100 mm dia nominal bore
100
45
4540
... More
maintenance of water supply OCM1;Supplying and fixing of CI D/F Sluice valves conforming to IS 14846 /2000 with amendments No. 1and2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for (closed end Test) against Hydrostatic test requirement. The operation can be done with hand wheel / cap. The rates are including transportation and including cost of bolts, nuts, rubber insertion etc., complete. ISI Marked. - PN-1.6 For 250 mm Dia
1
43783
43783.5
... More
maintenance of water supply OCM1;Supplying and fixing of CI D / F Kinetic Air valves Heavy Duty suitable for working pressure upto 16 Kg / Sq.Cm without isolating Valve Conforming to IS 14845 including transportation and including cost of jointing materials such as bolts, nuts and rubber insertions etc., complete (PN 1.6) For 80mm Dia
2
9195
18391.8
... More
maintenance of water supply OCM1;Supplying and fixing of CI D/F non return valves Heavy Duty Round Body conforming to IS 5312 / Part 1/ 1984. with amendments No. 1 and 2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for (closed end Test) against Hydrostatic test requirement. The rates are including transportation, etc., complete. The operation can be done with hand wheel/cap. ISI Marked - PN-1.6 For 250 mm Dia
1
41979
41979.8
... More
maintenance of water supply OCM1;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
150
243
36480
... More
maintenance of water supply OCM1;Supply of HDPE flange joints including 2Nos. of pipe ends long neck and 2Nos. of MS flanges with all contractors materials such as bolts, nuts, washers, rubber packing etc. and including conveyance charges etc. complete. (labour charges for fixing is included in laying of pipe line item).- For 250mm dia HDPE flange joints
15
5102
76537.5
... More
maintenance of water supply OCM1;Labour charges for Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 â?? part-II/1975 including fixing charges for Specials and fittings, etc., - For 225 mm OD pipe
50
150
7505
... More
maintenance of water supply OCM1;Labour charges for Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 â?? part-II/1975 including fixing charges for Specials and fittings, etc., - For 250 mm OD pipe
50
158
7900
... More
maintenance of water supply OCM1;Supply of HDPE flange joints including 2Nos. of pipe ends long neck and 2Nos. of MS flanges with all contractors materials such as bolts, nuts, washers, rubber packing etc. and including conveyance charges etc. complete. (labour charges for fixing is included in laying of pipe line item).- For 225mm dia HDPE flange joints
15
4241
63628.5
... More
maintenance of water supply OCM1;Labour charges for Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 â?? part-II/1975 including fixing charges for Specials and fittings, etc., - For 200 mm OD pipe
50
135
6770
... More
maintenance of water supply OCM1;Supplying, Laying and jointing of HDPE pipes (PE-100 Grade) 10 KG/CM2 conforming to IS 4984-1995 by butt fusion welding as per IS:7634 â?? part-II/1975 including transportation of material to anywhere in the State. Cost of Flange joints and other specials will be paid separately - For OD 225mm
20
2097
41950
... More
maintenance of water supply OCM1;Removing old HDPE pipes and specials / fittings and cleaning, scraping the pipes, hoisting and keeping with in 50m lead but excluding earth work excavation of trenches and refilling (By Butt Fusion welding) - For 225 mm OD pipe
50
75
3755
... More
maintenance of water supply OCM1;Supplying, Laying and jointing of HDPE pipes (PE-100 Grade) 10 KG/CM2 conforming to IS 4984-1995 by butt fusion welding as per IS:7634 â?? part-II/1975 including transportation of material to anywhere in the State. Cost of Flange joints and other specials will be paid separately - For OD 250mm
35
2557
89516
... More
maintenance of water supply OCM1;Removing old HDPE pipes and specials / fittings and cleaning, scraping the pipes, hoisting and keeping with in 50m lead but excluding earth work excavation of trenches and refilling (By Butt Fusion welding) - For 250 mm OD pipe
50
79
3950
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%