The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Civil Works Others
Excavation
Opening Date23 Oct 2024
Closing Soon7 Nov 2024
Tender Amount₹ 43,66,906
Costs
EMD
₹ 48,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
553127Tender No
CW/RD/e-77/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
2.25
13984
31464.9
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Supply of Galvanized steel barbed wire Conforming to IS 278 -1978 Type A -4 Point barbs round both line wires 75mm apart with 12 SWG line wire with a minimum mass of 9.38 Kg per 100M.
9300
107
1003470
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Barbed Wire fencing 1.40M high with Galvanised steel barbed wire, Conforming to IS 278 -1978 Type A -4 Point barbs round both line wires 75mm apart with 12 SWG line wire with a minimum mass of 9.38 Kg per 100M, 8 horizontal strands at 150mm apart and 2diagonals in between RCC posts in Each bay tied with G.I binding wire on precast RCC 1:2:4 posts of size 100 x100mm and 180cm high at 3m c/c and corner posts and support posts of 100 x100mm at every 10th fencing posts, fixed in CC 1:5:10 base of 450x450x450mm including earthwork excavation for foundation of posts etc., complete as directed. Gap between Ground level and bottom strand should not be more than 150mm. (Excluding Cost Of Cement and G.I Barbed wire and steel reinforcement and its Fabrication charges and Hooks) Note:- The coarse aggregate for casting precast RCC 1:2:4 fencing posts should be 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal and concrete is to be machine mixed and CC 1:5:10 concrete should be with 40mm crushed granite metal.
9000
224
2017080
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Painting to Wood work/ Plastered Surfaces with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of wood primer of Approved Make making 3 coats - To new work -all complete for finished item of work.
800
181
145440
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
800
150
120760
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
50
34
1725
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15N / sq mm) grade cement concrete using 40 mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) clean, graded crushed granite metal of approved quality including machine mixing, vibrating with necessary shuttering and centering charges, etc., Complete for finished Item of work as directed for Filter bed side walls & Retaining walls (Excluding Cost of Cement) (Coarse Aggregate : 0.90 Cum, Fine Aggregate:0.45Cum, cement content: 260 Kg/Cum)
208
3872
805509.12
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer
25
3479
86988.5
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth
134
119
16013
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
17
243
4134.4
Construction of boundary pillars and 1.40 m height barbed wire fencing to the diverted forest land;Clearing light jungle / Shrub jungle
25000
3
95000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%