The Singareni Collieries Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Housekeeping Services
Opening Date6 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 21,42,481 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance;Filling the pits with soil mixture-for 30 cm cube pits( 0.027 cmt / pit)

500

37

189

... More
Maintenance;Industrial Allowance

843.51

-

843.51

... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: the soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdery form. ( for 30 cm cube pits -- 0.027 cmt per pit)

500

843

4217.55

... More
Maintenance;Industrial Allowance

280

-

280

... More
Maintenance;Digging of 30Cm3 pits.

500

280

1400

... More
Maintenance;Industrial Allowance

252

-

252

... More
Maintenance;Planting the seedlings in pits with ball of earth intact by scraping topsoil around the pit, planting bag plants and packing (a) in 45 cm cube pit

500

252

1260

... More
Maintenance;Industrial Allowance

126

-

126

... More
Maintenance;Filling the pits with soil mixture (a) for 45 cm cube pits (0.091 cmt / pit)

500

126

630

... More
Maintenance;Industrial Allowance

2842.94

-

2842.94

... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: the soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdery form (a) for 45 cm cube pits (0.091 cmt / pit)

500

2842

14214.7

... More
Maintenance;Industrial Allowance

1060

-

1060

... More
Maintenance;Digging of 45 Cm3 pits.

500

1060

5300

... More
Maintenance;Industrial Allowance

121.8

-

121.8

... More
Maintenance;Planting the hedges by arranging the plants with the ball of earth intact in the trench in staggered manner @12 plants/Rmt and refilling the trench with soil mixture.

200

304

609

... More
Maintenance;Industrial Allowance

423.36

-

423.36

... More
Maintenance;Preparation of soil mixture in 3:1 ratio using the dug up soil including cost and conveyance of FYM.

200

1058

2116.8

... More
Maintenance;Industrial Allowance

393.12

-

393.12

... More
Maintenance;Digging of 30Cm wide and 30Cm deep running trench (0.09 Cmt earth work/Rmt.)

200

982

1965.6

... More
Maintenance;Industrial Allowance

11.04

-

11.04

... More
Maintenance;Alignment of hedges

200

27

55.18

... More
Maintenance;Industrial Allowance

997.5

-

997.5

... More
Maintenance;Dibbling cost of any lawn grass at 10cm X 10 cm espacement including preparation of grass slips ramming.

1250

399

4987.5

... More
Maintenance;Industrial Allowance

519.75

-

519.75

... More
Maintenance;Cost of spreading of soil and soil mixture including watering and rolling/ ramming @15cmt per 100 sq.m

1250

207

2598.75

... More
Maintenance;Industrial Allowance

2109.61

-

2109.61

... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: Supply of 10cmt. red soil with specifications of item no. 1.5 and supply of 5cmt of soil mixture comprising of red soil and sand in 3:2 ratio and addition of 10 Kg DAP + 50 Kg Neem cake + 2Kg Folidol. ----In total 15cmt + additives for 100 sq.mt area

250

4219

10548.03

... More
Maintenance;Industrial Allowance

133

-

133

... More
Maintenance;Collection of weeds and unwanted inert material after ploughing and keeping the collected material outside the site to facilitate transportation. (Only for ploughed areas with heavy weed infestation)

1250

53

665

... More
Maintenance;Industrial Allowance

563.85

-

563.85

... More
Maintenance;Digging and pulverizing soil to a depth of 30Cm where existence of noxious weed like Cynodon / Cyprus etc., is severe and removal of all weed growth and inert material (where ploughing is not done)

1250

225

2819.25

... More
Maintenance;Industrial Allowance

281.93

-

281.93

... More
Maintenance;Digging and pulverizing soil to a depth of 15Cm and removal of all weed growth and inert material (where ploughing is not possible)

1250

112

1409.63

... More
Maintenance;Hiring of Tractor mounted water tanker with minimum of 3K ltr. Capacity including driver and one contracted worker for watering the plants

2

93900

187800

... More
Maintenance;Supply of red-earth for laying on roads (For top dressing on the lawn area)

75

1200

90000

... More
Maintenance;Supply (Cost and transportation) of well de-composed Farm Yard Manure (FYM)

1

3500

3500

... More
Maintenance;Cost of planting material (d) Group ornamental plants

500

60

30000

... More
Maintenance;Cost of planting material (c) Individual ornamental plants

500

70

35000

... More
Maintenance;Cost of planting material (b) Hedge

200

160

32000

... More
Maintenance;Cost of planting material (a) Lawn (Korean carpet)

250

180

45000

... More
Maintenance;Industrial Allowance

36.12

-

36.12

... More
Maintenance;Planting the bag / pot plants in pots without disturbing root system.

100

180

180.6

... More
Maintenance;Industrial Allowance

63

-

63

... More
Maintenance;Removal of plants and soil from existing pots and cleaning the pots for repotting

100

315

315

... More
Maintenance;Industrial Allowance

7.98

-

7.98

... More
Maintenance;Filling of pots with soil mixture and transplanting in to pots(0.03 cmt soil mixture)

100

39

39.9

... More
Maintenance;Industrial Allowance

42

-

42

... More
Maintenance;Placing pebbles, sand etc., while filling pots including cost and transportation of material.

100

210

210

... More
Maintenance;Cost of soil mixture: The soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdering form. (0.03 cmt soil mixture)

100

937

937.23

... More
Maintenance;Cost of cement/ plastic/ earthen/ porcelain flower pots.

100

200

20000

... More
Maintenance;Cost of Tools and implements like Hose pipes, spades, sickles, sprayers, crowbar, secateurs etc.

5680

4

26866.4

... More
Maintenance;Cost of fertilizers, insecticides/Fungicides (Area of Park or Garden shall be considered including all the components of greenery)

5680

2

14938.4

... More
Maintenance;CMPF Amount

142846.87

-

142846.87

... More
Maintenance;Bonus Amount

93546.73

-

93546.73

... More
Maintenance;Contractor Profit

121655.67

-

121655.67

... More
Maintenance;EPS Amount

78610.7

-

78610.7

... More
Maintenance;Maintenance of lawn, hedge, ground cover, individual ornamental plants, etc., including protection, watering daily except on rainy days, application of fertilizers and pesticides whenever necessary, carrying out of weeding, moving, etc., operations whenever necessary and sweeping of fallen leaves on lawn.(Based on minimum wages as circulated by the G.M(Per)). (7 Persons x 305 working days i.e Total =2135 )

2135

526

1123010

... More
Maintenance;Transport of the waste material collected from the park/gardens, up to 5 KM, including loading and unloading.

75

369

27693.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.