The Singareni Collieries Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Housekeeping Services
Opening Date6 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 21,42,481
Costs
EMD
₹ 42,850Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574414Tender No
MMR/FTY/H/25/11Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Maintenance;Filling the pits with soil mixture-for 30 cm cube pits( 0.027 cmt / pit)
500
37
189
... More
Maintenance;Industrial Allowance
843.51
-
843.51
... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: the soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdery form. ( for 30 cm cube pits -- 0.027 cmt per pit)
500
843
4217.55
... More
Maintenance;Industrial Allowance
280
-
280
... More
Maintenance;Digging of 30Cm3 pits.
500
280
1400
... More
Maintenance;Industrial Allowance
252
-
252
... More
Maintenance;Planting the seedlings in pits with ball of earth intact by scraping topsoil around the pit, planting bag plants and packing (a) in 45 cm cube pit
500
252
1260
... More
Maintenance;Industrial Allowance
126
-
126
... More
Maintenance;Filling the pits with soil mixture (a) for 45 cm cube pits (0.091 cmt / pit)
500
126
630
... More
Maintenance;Industrial Allowance
2842.94
-
2842.94
... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: the soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdery form (a) for 45 cm cube pits (0.091 cmt / pit)
500
2842
14214.7
... More
Maintenance;Industrial Allowance
1060
-
1060
... More
Maintenance;Digging of 45 Cm3 pits.
500
1060
5300
... More
Maintenance;Industrial Allowance
121.8
-
121.8
... More
Maintenance;Planting the hedges by arranging the plants with the ball of earth intact in the trench in staggered manner @12 plants/Rmt and refilling the trench with soil mixture.
200
304
609
... More
Maintenance;Industrial Allowance
423.36
-
423.36
... More
Maintenance;Preparation of soil mixture in 3:1 ratio using the dug up soil including cost and conveyance of FYM.
200
1058
2116.8
... More
Maintenance;Industrial Allowance
393.12
-
393.12
... More
Maintenance;Digging of 30Cm wide and 30Cm deep running trench (0.09 Cmt earth work/Rmt.)
200
982
1965.6
... More
Maintenance;Industrial Allowance
11.04
-
11.04
... More
Maintenance;Alignment of hedges
200
27
55.18
... More
Maintenance;Industrial Allowance
997.5
-
997.5
... More
Maintenance;Dibbling cost of any lawn grass at 10cm X 10 cm espacement including preparation of grass slips ramming.
1250
399
4987.5
... More
Maintenance;Industrial Allowance
519.75
-
519.75
... More
Maintenance;Cost of spreading of soil and soil mixture including watering and rolling/ ramming @15cmt per 100 sq.m
1250
207
2598.75
... More
Maintenance;Industrial Allowance
2109.61
-
2109.61
... More
Maintenance;Preparation of soil mixture including cost and conveyance of materials: Supply of 10cmt. red soil with specifications of item no. 1.5 and supply of 5cmt of soil mixture comprising of red soil and sand in 3:2 ratio and addition of 10 Kg DAP + 50 Kg Neem cake + 2Kg Folidol. ----In total 15cmt + additives for 100 sq.mt area
250
4219
10548.03
... More
Maintenance;Industrial Allowance
133
-
133
... More
Maintenance;Collection of weeds and unwanted inert material after ploughing and keeping the collected material outside the site to facilitate transportation. (Only for ploughed areas with heavy weed infestation)
1250
53
665
... More
Maintenance;Industrial Allowance
563.85
-
563.85
... More
Maintenance;Digging and pulverizing soil to a depth of 30Cm where existence of noxious weed like Cynodon / Cyprus etc., is severe and removal of all weed growth and inert material (where ploughing is not done)
1250
225
2819.25
... More
Maintenance;Industrial Allowance
281.93
-
281.93
... More
Maintenance;Digging and pulverizing soil to a depth of 15Cm and removal of all weed growth and inert material (where ploughing is not possible)
1250
112
1409.63
... More
Maintenance;Hiring of Tractor mounted water tanker with minimum of 3K ltr. Capacity including driver and one contracted worker for watering the plants
2
93900
187800
... More
Maintenance;Supply of red-earth for laying on roads (For top dressing on the lawn area)
75
1200
90000
... More
Maintenance;Supply (Cost and transportation) of well de-composed Farm Yard Manure (FYM)
1
3500
3500
... More
Maintenance;Cost of planting material (d) Group ornamental plants
500
60
30000
... More
Maintenance;Cost of planting material (c) Individual ornamental plants
500
70
35000
... More
Maintenance;Cost of planting material (b) Hedge
200
160
32000
... More
Maintenance;Cost of planting material (a) Lawn (Korean carpet)
250
180
45000
... More
Maintenance;Industrial Allowance
36.12
-
36.12
... More
Maintenance;Planting the bag / pot plants in pots without disturbing root system.
100
180
180.6
... More
Maintenance;Industrial Allowance
63
-
63
... More
Maintenance;Removal of plants and soil from existing pots and cleaning the pots for repotting
100
315
315
... More
Maintenance;Industrial Allowance
7.98
-
7.98
... More
Maintenance;Filling of pots with soil mixture and transplanting in to pots(0.03 cmt soil mixture)
100
39
39.9
... More
Maintenance;Industrial Allowance
42
-
42
... More
Maintenance;Placing pebbles, sand etc., while filling pots including cost and transportation of material.
100
210
210
... More
Maintenance;Cost of soil mixture: The soil mixture should be in 3:1:1 ratio of red soil, sand and well decomposed FYM in powdering form. (0.03 cmt soil mixture)
100
937
937.23
... More
Maintenance;Cost of cement/ plastic/ earthen/ porcelain flower pots.
100
200
20000
... More
Maintenance;Cost of Tools and implements like Hose pipes, spades, sickles, sprayers, crowbar, secateurs etc.
5680
4
26866.4
... More
Maintenance;Cost of fertilizers, insecticides/Fungicides (Area of Park or Garden shall be considered including all the components of greenery)
5680
2
14938.4
... More
Maintenance;CMPF Amount
142846.87
-
142846.87
... More
Maintenance;Bonus Amount
93546.73
-
93546.73
... More
Maintenance;Contractor Profit
121655.67
-
121655.67
... More
Maintenance;EPS Amount
78610.7
-
78610.7
... More
Maintenance;Maintenance of lawn, hedge, ground cover, individual ornamental plants, etc., including protection, watering daily except on rainy days, application of fertilizers and pesticides whenever necessary, carrying out of weeding, moving, etc., operations whenever necessary and sweeping of fallen leaves on lawn.(Based on minimum wages as circulated by the G.M(Per)). (7 Persons x 305 working days i.e Total =2135 )
2135
526
1123010
... More
Maintenance;Transport of the waste material collected from the park/gardens, up to 5 KM, including loading and unloading.
75
369
27693.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements