The Singareni Collieries Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Solid Waste Management
Environmental Service
Opening Date14 Feb 2025
Closing Date1 Mar 2025
Tender Amount₹ 1,54,05,497 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Plastering to brick masonry with cement mortar 1:4, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

410

150

61725.5

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)

330

3984

1314832.2

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15N / sq mm) grade cement concrete using 40 mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) clean, graded crushed granite metal of approved quality including machine mixing, vibrating with necessary shuttering and centering charges, etc., Complete for finished Item of work as directed for Filter bed side walls & Retaining walls (Excluding Cost of Cement) (Coarse Aggregate : 0.90 Cum, Fine Aggregate:0.45Cum, cement content: 260 Kg/Cum)

1140

4334

4941147.6

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supply of Cast Iron pipes and fittings conforming to I.S. including transportation to site of work,

1050

97

102795

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type-A pipes (PVC / SWR pipe - 4Kg/sq.cm) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 110mm dia 3M Single socket pipe

11

958

10545.7

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

30

7101

213054.9

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

12

13984

167812.8

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) - by Manual Means

73

1512

110419.8

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Providing RCM Screen wall (parada wall)/ RCM drop walls 50mm thick in CM1:3 including steel reinforcement with 6mm dia @ 150mm c/c both ways and Rabbit wire mesh of 24 gauge 2 layers including necessary centering charges including cost and conveyance of all materials, all labour charges including tying Rabbit wire mesh to the steel reinforcement applying mortar lumps, finishing plastering 12mm in 2 coats of CM 1:4 and CM 1:2 on both faces, sponge finishing, all operational and incidental charges, curing etc., but excluding cost of steel and its fabrication charges and Cost of Cement) complete for finished Item of work as directed.

20

2322

46457.8

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Erection of compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete

500

8

4000

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Fabrication of steel works like compound wall gates, MS fencing posts on ground or on top of compound wall, cattle trap , MS holding down bolts, templates, in position etc., complete including cost of welding rods, power charges etc., complete.

500

18

9100

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour charges for fixing Companys chain link fence duly cutting to the required sizes, fixed with MS Flats on existing pre cast RCC / MS Angle posts with Companys material.

160

11

1824

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supply of Hot dipped Galvanized Iron chain link mesh 8 gauge (4.0mm) as per IS 2721-1979(50mm x 50mm)

160

619

99072

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Flooring 50 mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. (But Excluding Cost of Cement )

310

337

104584.7

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary rock (not requiring blasting)-Manual Means - For all Depths

200

347

69480

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour charges for laying and jointing of 200mm dia M.S pipes and fittings with flanged ends, with contractors Bolts and Nuts , gasket, etc. complete as directed

30

133

4014

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls

1140

393

448134

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.

50

170

8540

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality inclusive of shuttering/centering charges for bed blocks, encasing joists/ rails, holdfasts of doors and windows, etc. Complete (But Excluding Cost of Cement) - with concrete mixer (CA : 0.90 Cum, FA:0.45Cum)

3.2

5128

16412.61

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour charges for fixing galvanised steel barbed wire (For Each strand) Rate includes cost of required binding wire.

750

4

3150

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supply of Galvanized steel barbed wire Conforming to IS 278 -1978 Type A -4 Point barbs round both line wires 75mm apart with 12 SWG line wire with a minimum mass of 9.38 Kg per 100M.

75

107

8092.5

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )

330

150

49681.5

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Providing impervious coat 12 mm thick for Brick/CC/RCC walls etc., with CM1:3, mixed with Approved Make of water proofing compound at the rate of 1Kg per bag of cement and rendering smooth, rounding off junctions of walls as directed including cost and conveyance of all materials and water etc., and operational , incidental, Labour charges etc., ( But Excluding Cost of Cement ) complete for finished item of work.

845

154

130256.75

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supply of Hard broken stone of granite, free from dust obtained by quarrying, wedging, breaking, burning, splitting, and blasting - Stone chips 2.36mm and below size crushed metal

75

1830

137265

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls

465

167

77841

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supply, Fabrication and fixing of door frame made of Angle iron of size 40x40x 6mm with one coat of Red oxide grade-I primer with the following MS fittings (Excluding Cost of Bed Blocks)(The Steel Sections etc., required will have to be procured by the contractor only and Steel will not be issued by the department) 1). 6nos. M.S. Z type hold fasts made out of 15x3mm flat of 100mm long fixed in CC 1:2:4 bed blocks (150 x 100x 100mm) 2) 10mm dia tie rod at the bottom with necessary nuts at the ends of Each side 3). 1no.stopper hinge per leaf 75mm medium duty 4). 4 No.s 300mm long T-Hinges

10

466

4663

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )

250

164

41112.5

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Plinth Beams / Brace beams.

13

10184

132397.72

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Columns.

7

10789

75528.18

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - for Column footings / Raft

7

7483

52383.38

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating with mechanical vibrators, etc., Complete for finished Item of work as directed - Dwarf Walls for Railings, Kerb walls, dividers etc., (Excluding Cost of Cement and side shuttering) (CA : 0.90 Cum, FA:0.45Cum)

3

4313

12940.92

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Conveyance charges of Earth for 1 KM lead.

200

40

8080

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Welding charges for M.S / G.I pipe joint i.e., pipe to pipe or flange to pipe with all companys pipes / fittings but with contractors welding plant and electrodes etc., complete as directed - For 150mm dia

30

239

7173

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and fixing of CI D/F Sluice valves conforming to IS 14846 /2000 with amendments No. 1and2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for (closed end Test) against Hydrostatic test requirement. The operation can be done with hand wheel / cap. The rates are including transportation and including cost of bolts, nuts, rubber insertion etc., complete. ISI Marked. - PN-1.6 For 200 mm Dia

3

30361

91085.4

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and fixing of CI D/F Sluice valves conforming to IS 14846 /2000 with amendments No. 1and2 heavy duty with CI grade FG 260 as per IS: 210. Two coats of primer suitable for EPOXY PAINTS finish shall be applied to all metal surface and finally two coats of Epoxy Paint. The Valves shall be tested for (closed end Test) against Hydrostatic test requirement. The operation can be done with hand wheel / cap. The rates are including transportation and including cost of bolts, nuts, rubber insertion etc., complete. ISI Marked. - PN-1.6 For 150 mm Dia

4

17830

71322.4

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of sand in filter beds with all leads and lifts ( Note: 1/8 th will be deducted for voids)

195

1547

301782

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of 12mm size Crushed granite variety metal in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)

17

2368

40261.1

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of 20mm size Crushed granite variety metal in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)

17

2494

42409.9

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of 40mm size granite variety metal in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)

33

1976

65221.2

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of 75 to 100mm size metal of granite variety in filter beds with all leads and lifts ( Note: 1/13 th shall be deducted for voids)

33

1669

55096.8

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Supplying and laying of rough stone boulders other than granite variety (225mm size) in filter beds with all leads and lifts (Note: 2/5th (40%) shall be deducted for voids)

50

1431

71595

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

1000

5

5700

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

1000

34

34100

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Whiting to New ceiling with Surya cem / Equivalent Cem, two coats complete for finished item of work.

240

43

10392

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Painting with two coats of Red oxide iron primer paint of grade-1 of Approved Make to Old Iron work - complete for finished item of work.

-

96

-

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Providing plinth protection work with 50mm thick CC 1:3:6 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded Crushed granite metal together with a bed of 75mm thick CC 1:5:10 using 40mm Crushed granite metal well rammed, consolidated including finishing the top smooth duly maintaining the required slopes to drain off water as per site conditions including cost and conveyance of all materials to site of work, all labour, operational, and incidental charges and necessary side support for concrete while laying etc., complete for finished item of work (to a total thickness of 125mm). ( But Excluding Cost of Cement ) using Machine mixing

170

633

107620.2

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Flooring 100mm thick with CC 1:2:4 using 20mm Down size (65% of 20-10mm and 35% of 10 - 4.75mm) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth and including shuttering charges complete. ( But Excluding Cost of Cement )

90

652

58745.7

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Flooring 30mm thick with CC 1:2:4 using 10mm size crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )

75

253

19029

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1:2:4 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded crushed granite metal of approved hard quality for precast RCC slabs, purlins, verandah posts, fencing posts etc. including machine mixing of Concrete, necessary shuttering, finishing etc including hoisting/fixing, cost and conveyance of all materials to work site, all labour charges, all operational incidental charges (excluding cost of steel and its fabrication charges and cost of cement) etc., complete for finished item of work, as directed. (CA : 0.90 Cum, FA:0.45Cum)

5

7259

36299.2

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.

48

7483

359200.32

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For roof Slab - up to 150mm thick.

27

8726

235624.68

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For roof Beams.

10

10062

100623.4

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.

1

15153

15153.04

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.

1

10767

10767.74

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

330

3941

1300609.2

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Clearing light jungle / Shrub jungle

250

3

950

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means

300

34

10350

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary soils-Mechanical Means -Up to 3 m depth

1800

119

215100

... More
Construction of Effluent Treatment Plant (ETP) and filter bed of 1,00,000 gallons capacity at NAINI;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

80

243

19456



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.