The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Building Construction
Civil Construction
Opening Date14 Sep 2022
Closing Date7 Oct 2022
Tender Amount₹ 30,13,819
Costs
EMD
₹ 31,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Record Rooms Over The Gm Office Main Building
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
351749Bid Award Id
ViewTender No
CW/SRP/E-05(3)/T-05/R-I-93/2022-23, Dt: 13.09.2022Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Record rooms over GM office main Building;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
5.4
-
79758
... More
Construction of Record rooms over GM office main Building;Conveyance charges of Steel including loading, unloading and stacking charges for 3 KM lead.
9.8
-
2914.72
... More
Construction of Record rooms over GM office main Building;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )
28
-
936.04
... More
Construction of Record rooms over GM office main Building;Conveyance charges of CEMENT including loading, unloading and stacking charges for 1 KM lead.
11.2
-
2610.72
... More
Construction of Record rooms over GM office main Building;Supplying and Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer Approved Make and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks
2000
-
19000
... More
Construction of Record rooms over GM office main Building;Supply and laying of 3 runs of 2.5 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral &Earth) in existing metallic / Non - Metallic conduit pipe for run of circuit / Power mains including copper lugs complete
300
-
47280
... More
Construction of Record rooms over GM office main Building;Supply and fixing of 6 Way TPN Double Door distribution board with integral bus bar and din rail concealed in wall with flexibility to accept any combination of MCBs with 1 no 40A, 4 pole, 100mA RCCB, as incomer and 9 nos. of 6 Amps SP MCBs and 2 nos of 16A SP MCB and 1 no 20 A SP MCBs in sheet metal enclosure including all connections chiselling masonry work etc., (quarter in side as main DB)
2
-
26040.6
... More
Construction of Record rooms over GM office main Building;Supply and laying of 3 runs of 4 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral & Earth) in existing metallic / Non -Metallic conduit pipe for run of circuit/power mains including copper lugs complete
150
-
30795
... More
Construction of Record rooms over GM office main Building;Providing independent earthing for Important equipment with 40mm dia B class 2.5m long G.I pipe and 40mm dia B class 2.5 m long G.I pipe and 19mm dia B class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C./Brick masnory Chamber of 450mm X 450mm X 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg salt and 40Kg charcoal or or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40mm X 6mm X 200mm length with all accessories and labour charges complete as per IS specifications 732/1982 9Part II) Note:Whenever providing full length of electrode is not possible due to obstruction of water tube/rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance
2
-
11050.2
... More
Construction of Record rooms over GM office main Building;Supply and fixing MODULAR type 16A one module ISI marked 5 pin pin socket with MODULAR type 16A SP switch and GI box covered with suitable white cover plate and concealed in wall complete
9
-
7803
... More
Construction of Record rooms over GM office main Building;Supply and fixing of ISI marked Flush Type 6A 5 pin plug socket with Flush TYPE type 6A switch control on a common board with earth continuity including Anodised MS Box and suitable both sides laminated White Front plate including wire leads earth connections complete
60
-
9222
... More
Construction of Record rooms over GM office main Building;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade PVC insulated flexible copper conductor cable (phase,nuetral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked MODULAR type Control switch, MODULAR 120W step Type electronic hum free fan regulator, GI Box and white Front plate concealed in wall complete for fan pont ( MDS Type).
30
-
47388
... More
Construction of Record rooms over GM office main Building;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade P.V.C insulated flexible copper conductor cable (phase, nuetral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked flush type switch/bell push with anodised MS box and white both sides laminated front cover plate concealed in wall and ceiling Rose/ Slant or Angle holder , round block etc and other accessories as necessary complete for light , bell, exhaust fan points.
100
-
101220
... More
Construction of Record rooms over GM office main Building;Supply and fixing of 25mm dia, heavy guage recessed/concealed ISI marked PVC conduit pipe along with reinforcement laid into wall/slab with all required accessories wherever necessary including masonry work for circuit main/sub-mains/15 A power circuit/Telephone/TV points complete
300
-
31590
... More
Construction of Record rooms over GM office main Building;Supply and fixing of 19mm dia, heavy guage ISI marked PVC conduit pipe recessed / concealed into wall / slab along with reinforcement laid into wall / slab with all required accessories wherever necessary including masonry work for light fan point /exhaust fan point / call bell point and separate plug socket point, TV / Telephone wiring etc. complete
200
-
18860
... More
Construction of Record rooms over GM office main Building;Painting with two coats of Red oxide iron primer paint of grade-1 of Approved Make to Old Iron work - complete for finished item of work.
520
-
50076
... More
Construction of Record rooms over GM office main Building;Labour charges for removing the damaged Tarfelt sheet from roofs and disposing the same as directed:-
70
-
2338
... More
Construction of Record rooms over GM office main Building;Supply and fixing minimum of 25mm to 30mm thick polished Black Kadapa single slab of required size as directed by the Engineer-in-charge with exposed faces square cut and well polished, on existing Walls, with grey Cement Slurry of honey like consistency spread at the rate of 3.30Kg./Sqm. including cost and conveyance all materials and water to work site and all operational, incidental, labour charges, dressing and fixing of stones in position rubbing curing etc., complete for Shelves as directed (But Excluding Cost of Cement)
50
-
18530
... More
Construction of Record rooms over GM office main Building;Extra for cutting steel bars in R.C.C through Manual means (sectional area of R.C.C to be measured)
56
-
38365.6
... More
Construction of Record rooms over GM office main Building;Demolition of Reinforced Cement Concrete through Manual means including stacking of serviceable materials and disposal of unserviceable materials within 100mts lead.
7
-
20202
... More
Construction of Record rooms over GM office main Building;Lift charges for Exterior emulsion painting for external old walls of building (Floor height up to 3.66M) - In First Floor
840
-
8568
... More
Construction of Record rooms over GM office main Building;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.
630
-
82152
... More
Construction of Record rooms over GM office main Building;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls
210
-
35154
... More
Construction of Record rooms over GM office main Building;Supplying and fixing 35mm thick FACTORY MADE MOULDED DOOR SHUTTER consisting of solid core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel laminated with 2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel design in different panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam Pac sheet on other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. complete as per direction of Engineer-in-Charge, manufacture specification and drawing with following Aluminium anodised fittings - Single Shutter a) 2no.of 300mm long aldrop with 16mm dia shoot. b) 1 nos. 200 to 250mm mm long tower bolt with 10mm dia shoot. c) 2 no. 100 mm to 150 mm long grip handle. d) 3 nos.150 mm long butt hinges. ; e) 1 no. foot door stopper.
10
-
44709
... More
Construction of Record rooms over GM office main Building;Supply and fixing Door frame of 100 x75mm with Non teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)
26
-
19211.4
... More
Construction of Record rooms over GM office main Building;Add extra for A.C Sheet / GI Sheet roofing, side Sheeting - above 5m and up to 10m height
680
-
11288
... More
Construction of Record rooms over GM office main Building;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Lintels - In 1st floor
2
-
1178
... More
Construction of Record rooms over GM office main Building;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )
35
-
5699.05
... More
Construction of Record rooms over GM office main Building;Extra Lifts for Plastering material and for Scaffolding / centering material - In 1st floor
980
-
16072
... More
Construction of Record rooms over GM office main Building;Extra lift charges for Brick Masonry items including lift for centering / shuttering charges (Floor height up to 3.66M) - In 1st floor
73
-
30579.7
... More
Construction of Record rooms over GM office main Building;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Roof Slabs - In 1st floor
5.5
-
2247.3
... More
Construction of Record rooms over GM office main Building;Extra lift charges for RCC items including lift for centering / shuttering charges (Floor height = 3.66M) - For Sunshades - In 1st floor
1.5
-
1188.15
... More
Construction of Record rooms over GM office main Building;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
1.7
-
23773.48
... More
Construction of Record rooms over GM office main Building;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
2.7
-
27608.58
... More
Construction of Record rooms over GM office main Building;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
2.7
-
49081.68
... More
Construction of Record rooms over GM office main Building;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
680
-
541892
... More
Construction of Record rooms over GM office main Building;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.
1.5
-
22328.61
... More
Construction of Record rooms over GM office main Building;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.
2
-
21000.88
... More
Construction of Record rooms over GM office main Building;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter â?? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
32
-
258825.6
... More
Construction of Record rooms over GM office main Building;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
980
-
145951.4
... More
Construction of Record rooms over GM office main Building;Reinforced Flyash Brick masonry with bricks of size 225x100 x60 mm with 50kg /cm2 Compressive strength in C.M.1:4 and using two mild steel bars of 6mm dia in every third layer of brick masonry, with free joints in to the main block work for superstructure including scaffolding, and fabrication charges of steel etc., (But Excluding Cost of Cement and cost of steel ) complete. For 100mm walls
150
-
129262.5
... More
Construction of Record rooms over GM office main Building;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.
9
-
59356.35
... More
Construction of Record rooms over GM office main Building;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.
53
-
313358.79
... More
Construction of Record rooms over GM office main Building;Supply, Fabrication and Erection of Mild steel tubes for structural steel components like roof trusses, purlins, louvers, sag rods, rafters etc., including cost and conveyance of all materials to site, labour charges, all operational charges and including all materials like MS tubes and Pipes, welding rods, bolts, rivets and all contingencies, power charges, tackle, derric, crane etc., leads and lifts at site etc., complete as per drawings and insructions of the Engineer in charge.
4400
-
429880
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements