The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 21,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
559178Tender No
CW/RD/e-87/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Temple;Manufacture, supply and Delivery of ISI marked fully hot dip galvanized deep well India Mark-II Hand Pump assembly complete Unit with 10 Nos. of connecting rods (bright bars) of 12 mm dia 3 mtrs. The component identification and manufacturer mark shall be as per BIS specification with telescopic stand.
1
8645
8645
Construction of Temple;Supply of Un-plasticised PVC pipes for potable water supplies conforming to IS 4985/2000 (Third revision), with bell ends (socket) as per specifications including transportation to site of work (Test pressure 6 kg/cm2) - For 180mm Dia Slotted pipe
20
865
17310
Construction of Temple;Supply of Un-plasticised PVC pipes for potable water supplies conforming to IS 4985/2000 (Third revision), with bell ends (socket) as per specifications including transportation to site of work (Test pressure 6 kg/cm2) - For 180mm Dia
100
723
72370
Construction of Temple;Drilling of 165 mm dia. Bore wells by Down The Hole (DTH) hammer drilling in all formations to a depth as desired by the department and reaming the bore to suit insertion of 180mm dia PVC casing pipe of 6 Kg/CM2 including insertion of casing pipe, supply and filling of required quantity of 6mm pea gravel as directed by the department including cost of bore development (flushing the bore well at an average pressure of 100 PSI) conducting yield test, crew charges, cost of consumables including construction of C.C. platform with Contractors cement and other materials and all other charges required complete but excluding cost of PVC casing pipe and inclusive of fixing of Hand pump. The entire work has to be done to the satisfaction of departmental authorities and as per IS 2800 PART I and II â?? 1979.
120
450
54000
Construction of Temple;Conveyance charges of CEMENT including loading, unloading and stacking charges for Beyond 30KM (Rate/KM) lead.
796.46
8
6690.3
Construction of Temple;Conveyance charges of CEMENT including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.
796.46
10
8044.29
Construction of Temple;Conveyance charges of CEMENT including loading, unloading and stacking charges for 5 KM lead.
31.86
276
8799.46
Construction of Temple;Supply of Structural Steel plates for the month of May - 2022(Inclusive of 13.615% CP and OH)
1.05
94300
99487.03
Construction of Temple;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls
150
167
25110
Construction of Temple;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.
120
130
15648
Construction of Temple;White washing to New walls with Surya Cem / Equivalent Cem two coats complete for finished item of work.
150
39
5895
Construction of Temple;Supply and fixing of Cement Bonded Particle Board (IS 14862) door shutters using with 16MM thick with all round style â??Uâ?? lipping size of 20mm x18mm x20mm made from 0.6mm thick galvanized pre-painted cold rolled steel profiles with Cement Bonded Particle Board separating two shutter with 30mm x20mm x30mm Stepped lipping including cost and conveyance of all materials at site and applying one coat of primer, 2 coats of luppam and 2 coats of synthetic enamel paint as per approved design for finished item of work - BISON PANEL(IS 14276) DOUBLE DOOR SHUTTER with necessary screws fixed at every 1foot (304.8mm) intervals and including the following MS powder coated fittings. etc., complete finished item of work as per Approved Make a). 250 mm long aldrops 2nos. b). 250mm long tower bolt with 10mm dia shoot- 2nos c). 2nos 125 mm long grip handle d) 2 Nos. Door Stopper
5.04
2308
11632.82
Construction of Temple;20 mm thick plain cement mortar bands in cement mortar 1:4 up to 300 mm in width for elevations and drip moulds etc.,- Raised Band (But Excluding Cost of Cement )
10
612
6125.3
Construction of Temple;Painting to Wood work/ Plastered Surfaces with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of wood primer of Approved Make making 3 coats - To new work -all complete for finished item of work.
50
181
9090
Construction of Temple;Conveyance charges of Steel including loading, unloading and stacking charges for Beyond 30KM (Rate/KM) lead.
62.5
8
525
Construction of Temple;Conveyance charges of Steel including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.
62.5
10
631.25
Construction of Temple;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.
2.5
317
794.3
Construction of Temple;Supply and fixing of pre-cast RCC Grills of any design of 25 mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation and erection etc., including cost and conveyance of all the materials to site of work, all labour charges, all operational and incidental charges including all leads and lifts etc., complete for finished item of work, as directed. (Note:- This is a bought out Item. Contractor has to make his own arrangements for all the materials.)
100
426
42650
Construction of Temple;Flooring 40mm thick with CC1:2:4 using 20mm Down size ( 65% of 20-10mm and 35% of 10 - 4.75mm ) graded crushed granite metal of approved hard quality on existing concrete base, rendering smooth complete. ( But Excluding Cost of Cement )
22.5
283
6374.25
Construction of Temple;Providing Dadooing to walls with ceramic wall tiles of size 200x300mm / 245mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )
87
702
61116.63
Construction of Temple;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )
51
870
44405.19
Construction of Temple;Painting to Iron work with two coats of synthetic enamel paint of grade II of Approved Make and shade including a base Coat of Red oxide primer paint of grade -I of Approved Make making 3 coats - To new work -all complete for finished item of work.
75
170
12810
Construction of Temple;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.
1055
5
6013.5
Construction of Temple;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)
1055
34
35975.5
Construction of Temple;Roofing/side sheeting with Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with Suitable Bolts, nuts and washers, including fixing of wind ties as per the requirement etc., and including cost and conveyance of all materials etc., complete (with / without Ridges/ valley gutters) for finished Item of work as directed. (cost of wind ties and its fabrication charges are not included)
96
796
76502.4
Construction of Temple;Erecting companys steel purlins, louvers, sag rods, rafters etc., with contractors tackle, derric, crane etc., complete
0.5
9089
4544.6
Construction of Temple;Fabrication of structural steel components like purlins, louvers, sag rods, rafters etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
0.5
14770
7385
Construction of Temple;Erecting companys steel stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., with contractors tackle, derric, crane etc., complete
1
10225
10225.4
Construction of Temple;Fabrication of structural steel components like stanchions, built up columns, trestles, beams, trusses, N girders, chequered plate walk way etc., including all leads and lifts at site etc., with companys steel sections but with contractors welding rods, bolts, rivets and all contingencies, power charges, etc., complete as per drawings and instructions of the Engineer in charge.
1
18178
18178.4
Construction of Temple;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )
51
174
8892.87
Construction of Temple;Plastering to brick masonry with cement mortar 1:6, 12mm thick including raking out of joints ( But Excluding Cost of Cement )
600
160
96282
Construction of Temple;Brushing of existing concrete surface with wire brush and providing cement concrete 1:2:4 screed of an average thickness of 20mm using 6mm size crushed granite metal of approved hard quality, and providing 2 layers of 24 guage rabbit wire mesh in the CC screed as nominal reinforcement and plastering with CM 1:4, 12mm thick including admixing of approved impervious water proofing compound as per manufacturers specification or @ 2% by weight of cement and finishing smooth and including providing slopes to drain off water etc., complete as directed (But Excluding Cost of Cement )
30
307
9233.1
Construction of Temple;Providing coping with fly ash brick masonry with bricks of 50 Kg/Sq.Cm. compressive strength over 225 mm thick brick walls with 340x340mm square pillars up to 3m c/c with brick in CM1:6 over the entire length including pillar portion and plastering the sides and bottom with cement mortar 1:6,12mm thick , and top with 12mm thick at ends and 20mm thick at center etc., ( But Excluding Cost of Cement ) complete:
4.5
8426
37917.27
Construction of Temple;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
1
13984
13984.4
Construction of Temple;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For roof Slab - up to 150mm thick.
4.5
8414
37865.66
Construction of Temple;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.
0.06
14840
875.61
Construction of Temple;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.
0.2
10455
2091.1
Construction of Temple;Flyash Brick masonry with solid blocks of size 290x225x140mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement ) complete.
80
5973
477910.4
Construction of Temple;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
35
34
1207.5
Construction of Temple;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
90
3672
330488.1
Construction of Temple;Cement Concrete 1:5:10 with 40 mm size Crushed Granite metal of approved hard quality in foundations or Plinth etc., Complete. (But Excluding Cost of Cement) - with concrete mixer
25
3628
90724.75
Construction of Temple;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
100
243
24320
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%