The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Agriculture or Forestry Works
Opening Date30 Aug 2024
Closing Date20 Sep 2024
Tender Amount₹ 49,995
Costs
EMD
₹ 2,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
539784Bid Award Id
ViewTender No
SRP/FTY/A/123/21Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Raising and maintenance of avenue plantation RK 6 Incline;Clearing unwanted growth to a width of 3 m on both sides parallel to the road (to be done during Nov-Dec) which will create a fireline preventing spread of ground fire from adjacent agricultural field.
1
1473
1473.26
Raising and maintenance of avenue plantation RK 6 Incline;Replacement of causalities (10% - since watering provision is provided) including opening of pit, internal transportation, planting and refixing the fence (For plantations with brushwood fencing)
10
2888
288.87
Raising and maintenance of avenue plantation RK 6 Incline;Weeding and forming of saucer (two times - 1st in July and 2nd in September)
100
540
540.12
Raising and maintenance of avenue plantation RK 6 Incline;Application of inorganic fertilizers like 25 gms of urea (2 month after planting, i.e. in August) and 50 gms of DAP (4 months after planting, i.e. in October). Fertilizer application shall be made by making 3 holes of 10 cm depth with crow bar at a distance of 20 cm away from plant and putting ferilizer and closing. This work needs to be monitored by Plantation-in-charge Officer at the time of application and needs to be entered in Plantation Journal.
100
260
260.06
Raising and maintenance of avenue plantation RK 6 Incline;Brush wood fencing (where HDPE self supporting tree guards are not used) fencing around the plant including collection, transportation and fixing at site (size of 1 m dia and 1.5 m height) - Thorny fencing with sturdy thorn material of 10 cm girth (at the butt end) and fixing in crow bar holes and strengthening with stone packing. The fence should be tightened horizontally by tying with thorny reepers leaving at least 1 from the ground to do the weeding by specially designed scrappers. Local tender shall be called for erection of fencing in raising year and, if possible, including maintainance for next 2 years (if planting is taken up without HDPE self supporting tree guard).
50
19876
9938.19
Raising and maintenance of avenue plantation RK 6 Incline;WATERING - To be done through tractor-fitted water tanker (preferably by calling tender) with benchmark for survival (90%) and average incremental growth of 1.0 m by end of raising year (i.e. 3.0 m height by end of March of raising year) - irrespective of plantation raised departmentally or through contractor by tender process. Minimum of 15 liter per plant with a Water Tanker - Staff will locate the casualty points under casualty replacement process, if any, and keep the pits ready for replacement before watering, so that the fresh tall plants get established easily. The Plantation-in-charge Officer should record the watering operation in Watering Watch Register and M-Book on the same day of watering. (i) For the plantation raised in June - July: One watering on the day of planting : 1 watering, June - two watering on non rainy days : 2 Waterings, July to September - One watering per month on non-rainy days : 3
1817
829
15068.02
Raising and maintenance of avenue plantation RK 6 Incline;PLANTING WITHOUT HDPE SELF SUPPORTING TREE GUARD: Refilling the pits with dug-up soil, planting, forming saucer with a radius of 0.50m radius around the plant and provide support to the plants which should go 18 inside pit along with plant at the time of planting
50
1893
946.83
Raising and maintenance of avenue plantation RK 6 Incline;Cost of supporting stake of 2.5 mtr long, sturdy and straight and minimum 10 cm girth at the base (if bamboos are not supplied by Dept).
50
1914
957.22
Raising and maintenance of avenue plantation RK 6 Incline;Cost of Fertilizers and pesticides
1
2200
2200
Raising and maintenance of avenue plantation RK 6 Incline;Internal transportation within the linear distance of plantation site (d) 25 x 40 cm (10x16) bag plants
50
538
269.17
Raising and maintenance of avenue plantation RK 6 Incline;Transportation of Planting Stock (including loading and unloading) up to distance of 5 km (b) 25 x 40 cm (10x16) bag plants
50
541
270.81
Raising and maintenance of avenue plantation RK 6 Incline;Digging of pits is to be done preferably by machine by calling tenders. The pit sizes for Avenue Plantations are 60 cm3 /100 cm3. (a) During June - July (ii) 60 cm3 size (0.216 cum) in hard gravelly and moram Soil (Manual)
50
57
2864.5
Raising and maintenance of avenue plantation RK 6 Incline;Allignment and Stacking including demarcation of base line (d) 5X5 m espacement = 400 planting points
50
140
70.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements