The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Repair and Maintenance
Agriculture or Forestry Works
Opening Date23 Feb 2022
Closing Date10 Mar 2022
Tender Amount₹ 18,97,793 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance;Weeding and forming of saucer (two times - 1st in July 2nd in September)

6400

-

30768

... More
Maintenance;Industrial Allowance

5555.28

-

5555.28

... More
Maintenance;Application of inorganic fertilizers like 25 gms of urea (2 month after planting, i.e. in August) and 50 gms of DAP (4 months after planting, i.e. in October). Fertilizer application shall be made by making 3 holes of 10 cm depth with crow bar at a distance of 20 cm away from plant and putting ferilizer and closing. This work needs to be monitored by Plantation-in-charge Officer at the time of application and needs to be entered in Plantation Journal.

12000

-

27776.4

... More
Maintenance;Cost and application of 1/2 cft FYM per plant - 1 month after planting

6400

-

133358.72

... More
Maintenance;Cost of supporting stake of 2.5 mtr long, sturdy and straight and minimum 10 cm girth at the base (if bamboos are not supplied by Dept).

3200

-

55566.08

... More
Maintenance;cost of Fertilizers and pesticides

6.4

-

12800

... More
Maintenance;Hiring of Tractor-fitted water tanker

20

-

1200000

... More
Maintenance;Hiring of Blade Tractor/Tractor Dozer

50

-

40000

... More
Maintenance;Industrial Allowance

4916.61

-

4916.61

... More
Maintenance;Cutting of coppice growth flush to the ground to reduce the competition over the entire area duly retaining useful species after planting and placing the cut material in between the planting rows (b) High rainfall zone > 800 mm

16

-

24583.04

... More
Maintenance;Cost of Protection: One Casual labour is allowed for the plantation upto 30 Ha

24

-

231710.16

... More
Maintenance;Industrial Allowance

15333.8

-

15333.8

... More
Maintenance;Uprootal of Mahaveera (Hyptis suaveolens) weed (Effective area to be considered) 10 Ha 2 years

20

-

76669

... More
Maintenance;Inter-ploughing (during November) the effective (excluding unsuitable patches) plantation area across the slope to a depth of 30 cm with Heavy-duty Tractor of 55 HP and above with Firm Mould Board (FMB) plough (a) Ordinary soil 5 Ha for 2 years

10

-

25535.4

... More
Maintenance;Industrial Allowance

2038.86

-

2038.86

... More
Maintenance;Planting in 60 cm3 Pit

1000

-

10194.3

... More
Maintenance;Industrial Allowance

2756.16

-

2756.16

... More
Maintenance;Planting in 45 cm3 Pit

3000

-

13780.8

... More
Maintenance;Industrial Allowance

1180.96

-

1180.96

... More
Maintenance;Planting in 30 cm3 Pit

4000

-

5904.8

... More
Maintenance;Industrial Allowance

298.22

-

298.22

... More
Maintenance;Internal transportation to planting points on head loads (c) 20 X 30 cm (8X12/14) bag plants

1000

-

1491.1

... More
Maintenance;Industrial Allowance

578.46

-

578.46

... More
Maintenance;Internal transportation to planting points on head loads (b) 15 X 30 cm (6X12) bag plants

3000

-

2892.3

... More
Maintenance;Industrial Allowance

498.8

-

498.8

... More
Maintenance;Internal transportation to planting points on head loads (a) 12.5 X 22.5 cm (5X9) bag plants

4000

-

2494

... More
Maintenance;Transportation of Planting Stock (including loading and unloading) up to a distance of 5 km (c) 20 X 30 cm (8X12/14) bag plants

1000

-

2270.7

... More
Maintenance;Transportation of Planting Stock (including loading and unloading) up to a distance of 5 km (b) 15 X 30 cm (6X12) bag plants

3000

-

3801

... More
Maintenance;Transportation of Planting Stock (including loading and unloading) up to a distance of 5 km (a) 12.5 X 22.5 cm (5X9) bag plants

4000

-

2275.2

... More
Maintenance;Industrial Allowance

9008

-

9008

... More
Maintenance;Digging of pits is to be done manually a) During June - July i) 60 cm3 size (0.216 cum) in Ordinary Soil

1000

-

45040

... More
Maintenance;Industrial Allowance

11376

-

11376

... More
Maintenance;Digging of Pits in areas between June - July a) Ordinary soil ii) 45 cm3 pits

3000

-

56880

... More
Maintenance;Industrial Allowance

4016

-

4016

... More
Maintenance;Digging of Pits in areas between June - July a) Ordinary soil i) 30 cm3 pits

4000

-

20080

... More
Maintenance;Industrial Allowance

1501.12

-

1501.12

... More
Maintenance;Allignment Stacking including demarcation of base line (c) 3X3 m espacement = 1111 planting points

8000

-

7505.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.