The Singareni Collieries Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 10,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574274Tender No
RG-III/CVL/ET-77/2024-25Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.
0.5
317
158.86
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Conveyance charges of Earth for 1 KM lead.
160
40
6464
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;De-lifting the materials such as stones, concrete etc., for construction of ground level Bunkers, ground level Sumps, Mine Arches, etc., for every 1m depth or part thereof beyond the initial depth of 4m from ground level
1110
72
80253
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Dewatering charges for Foundations below low water level for CD works as directed - For Lean Concrete
140
77
10794
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Supply of 19 mm thick Thermocole sheets
20
48
964
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
0.5
13984
6992.2
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Conveyance charges of Bitumen - Bulk Note:- For calculating Kilometres, Round the trip i.e., to and fro distance is to be considered.
52.5
2
119.18
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Supply of Bitumen 80/100 (VG-10)(Bulk) as on 16.01.2025 (Inclusive of 13.615% CP and OH)
0.07
53762
4032.2
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Providing expansion joints 25x 75mm and filling it with Bitumen mixed with sand 1:1 (Excluding Cost of Bitumen) material required for RM: Bitumen-1KG, Sand-0.001Cum Note:- Required Bitumen will be issued Departmentally.
60
37
2225.4
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded crushed granite metal of approved hard quality including machine mixing, vibrating with necessary shuttering and centering charges, etc., Complete for finished Item of work as directed for Substructure of CD works i.e, abutments / peirs / wing walls / returns etc., up to a height of 5M as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 and 2200 MORTH (Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)
105
3916
411277.65
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Supply of Separation Membrane of impermeable plastic sheeting 150 micron thick
700
16
11480
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Cement Concrete 1:4:8 with 40 mm Crushed granite metal of approved hard quality in foundations of CD works including machine mixing, vibrating with necessary shuttering etc., Complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 MORD and 1500, 1700 and 2100 MORTH (But Excluding Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum)
80
3458
276642.4
... More
providing CC flooring to part of Nallah No 2 OCP II RG III area;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
160
243
38912