The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Works
Civil And Construction
Civil Works Others
Opening Date3 Nov 2023
Closing Date10 Nov 2023
Tender Amount₹ 63,26,508 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance of BPA Siding for 2 years period;Supply of Class-I fish plates for 60 Kg rails - 610mm long.

300

1991

597390

... More
Maintenance of BPA Siding for 2 years period;Supply of class-I GFN -66 Liners for use with ERC Mk - III on 52 Kg rails.

50

12

605

... More
Maintenance of BPA Siding for 2 years period;Supply of GFN-66 liners for 60 Kg rails for use with RT-8527 wider PSC Sleepers.

100

35

3520

... More
Maintenance of BPA Siding for 2 years period;Deep screening of ballast of BG plain Track by the way of removing the entire stone ballast including muck lying in the track below and between shoulder sleepers, under sleepers and on the shoulders to a maximum depth of 250mm , limiting the digging up to original formaton level only, supporting the track temporarily with wooden blocks for passing the trains at a restricted speed of non stop 20KMPH while the work is in progress and putting back the screened clean ballast on the track and lifting of track as required so as to get a clean cushion of 250mm, shifting of sleepers to correct spacing including removal and refixing of fittings wherever necessary to M+4 / M+7 / M+9 density squarring of sleepers including 1 kutcha packing aligning, dressing / lowering the cess to deep screened depth with contractors labour, tools etc with all leads and lifts and as directed by Engineer-In-Charge as per special conditions noted here under. 1.The muck removed during screening shall be led sufficiently away from track cutting as directed by the Engineer-In_charge, in case of bank the earth shall be neatly spread on cess bank for widening of cess / mucking of cess / bank profile. 2. The work of deep screening shall be operated in part or in full based on the direction of Railways. Non operation of the items in full / part shall not entitle the contractor for any claim / compensation. 3. The screening of ballast shall be done using inclined screens made of square mesh of specified size. Using of wire basket shall not be permitted. 4. The entire stone ballast means the ballast available on the track between toe points on either side and the ballast from its top level to original formation level. 5. The depth of digging shall be limited to original formation level only. In case existing cushion (clear + cacked up) upto original formation level is less than 200 / 250 / 300 mm, the balance cushion shall be made good by lifting the track to pre-decided rail level. NO extra payment shall be made for such lifting done subsequently to achieve 250mm ballast cushion.

500

507

253650

... More
Maintenance of BPA Siding for 2 years period;Supply of elastic rail clips MK-III for BG PSC sleepers

900

63

56790

... More
Maintenance of BPA Siding for 2 years period;Supply of class-I Rail screws- 52KG

50

23

1175

... More
Maintenance of BPA Siding for 2 years period;Transportation of coal from heaps formed in railway yard to the bunkers with all lifts and a lead upto 2 km including loading and unloading as directed by the Engineer in charge:-

300

117

35310

... More
Maintenance of BPA Siding for 2 years period;Supply of Metal liners for use with ERC mark-III with flat toe on 52Kg PSC sleepers with 52 Kg rails.

50

24

1210

... More
Maintenance of BPA Siding for 2 years period;Supply of GFN-66 liners for 60 Kg rails for use with RT-2496 PSC Sleepers.

100

12

1280

... More
Maintenance of BPA Siding for 2 years period;Supply of Class-I fish plates for 52 Kg rails - 610mm long.

10

1631

16318

... More
Maintenance of BPA Siding for 2 years period;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete

300

68

20430

... More
Maintenance of BPA Siding for 2 years period;Conveyance charges of Earth for 5 KM lead.

300

107

32340

... More
Maintenance of BPA Siding for 2 years period;Conveyance charges of Metal / Stone for 2 KM lead including Loading charges. Unloading/ stacking charges need not be paid for this material.

500

15

7800

... More
Maintenance of BPA Siding for 2 years period;Running out / Putting of railways stone ballast from existing stacks available along alignment either on top of cutting or on formation or at toe of bank by head leads or by any other means and spreading to the required profile with contractors labour, tools and plants, as directed by Engineer in-charge. {Payment shall be made based on ballast stack measurement}

500

153

76500

... More
Maintenance of BPA Siding for 2 years period;Supply of GR sole plates 6mm thick for SEJs- 60Kg on PSC Sleepers

300

229

68760

... More
Maintenance of BPA Siding for 2 years period;Supply of Metal liners for use with ERC mark-III with flat toe on 60 kg PSC sleepers with 60 kg rails.

500

29

14500

... More
Maintenance of BPA Siding for 2 years period;Supply of 50mm Hard broken stone of granite, free from dust obtained by quarrying, wedging, breaking, burning, splitting, & blasting.

500

1924

962200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.