The Singareni Collieries Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
The Singareni Collieries Company Limited - SCCL Tender
Civil And Construction
Civil Works Others
Civil Works
Opening Date24 Aug 2022
Closing Date14 Sep 2022
Tender Amount₹ 33,80,396
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
346241Bid Award Id
ViewTender No
CW/SRP/E-21(2)/T-22/R-II-09/2022-23, Dt: 22.08.2022Tender Authority
The Singareni Collieries Company Limited ViewPurchaser Address
-Website
http://https://scclmines.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Toe wall and providing fly ash brick pitching;Add Extra for shuttering and centring charges for CC - Basement / Sidewalls, Water Tank Walls
412
-
161957.2
... More
Construction of Toe wall and providing fly ash brick pitching;Supplying, laying, fixing and commissioning the SWR pipes of Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand SWR Pipe (as per ISI- standards) Type-A pipes (PVC / SWR pipe - 4Kg/sq.cm) for rain water and vent pipes of any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice excluding cost of fittings - For 110mm dia 3M Single socket pipe
87
-
83406.9
... More
Construction of Toe wall and providing fly ash brick pitching;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete
2.3
-
32164.12
... More
Construction of Toe wall and providing fly ash brick pitching;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Raft.
26.5
-
190742.23
... More
Construction of Toe wall and providing fly ash brick pitching;150mm thick Flyash Brick pitching / Flooring with 300mm x 200mm x150mm Flyash bricks and pointing the same with CM 1:3 including cost and conveyance of all materials, labour charges etc., complete for finished item of work with all leads and lifts (But excluding cost of Cement)
1410
-
717943.8
... More
Construction of Toe wall and providing fly ash brick pitching;Filling with excavated earth (excluding rock)/ Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating Each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T and P etc., complete for finished item of work. (APSS NO. 309 and 310) (Excluding cost of sand) - by Manual Means
900
-
31050
... More
Construction of Toe wall and providing fly ash brick pitching;Cement Concrete 1:3:6 with 40mm down size (50% of 40-20mm, 30% of 20-10mm and 20% of 10-4.75mm) graded Crushed Granite metal of approved hard quality including machine mixing, vibrating, etc., Complete for finished Item of work as directed for Side Walls of Drains or Basement/ Substructure of the Buildings (Excluding Cost of Cement, Centering and shuttering charges) (CA : 0.90 Cum, FA:0.45Cum)
412
-
1523913.84
... More
Construction of Toe wall and providing fly ash brick pitching;Cement Concrete 1:5:10 with 40 mm size Crushed Granite metal of approved hard quality in foundations or Plinth etc., Complete. (But Excluding Cost of Cement) - with concrete mixer
52
-
190097.44
... More
Construction of Toe wall and providing fly ash brick pitching;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth
100
-
24320
... More
Construction of Toe wall and providing fly ash brick pitching;Earthwork excavation by machinery where Mass excavation with large quantity is involved for buildings, major pipe line works, etc., in all soils up to SDR and stone matrix including cutting and loading in tippers with all lifts etc., complete
1500
-
102150