Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Opening Date23 Nov 2021
Closing Date20 Dec 2021
Tender Amount₹ 24,15,322 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electrification to 512 houses at Kharmanghat;Erection of 9.1M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

5

-

8105

... More
Electrification to 512 houses at Kharmanghat;Excavation of pits in all soils except hard rock requiring blasting(2.6" x 2.6" x 5.0')

5

-

1820

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 50,63,75&100kva DTR

3

-

841.05

... More
Electrification to 512 houses at Kharmanghat;LOADING of 50,63,75&100kva DTR

3

-

1048.95

... More
Electrification to 512 houses at Kharmanghat;Erection of 3 Phase 100kva Distribution Transformer Erection of 9.1M 280Kg WL PSCC Pole , excavation pit of 2 1/2' x 2 1/2' x 5' size and erection of single pole structure including concreting of pole, supply and fabrication of top channel, cross channel, angles for AB Switch supporting and fixing of channels and angles & erection of clamps etc,. (Including support angle in between tapping and AB Switch)

3

-

5718

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 3PLTTriv meter with PVC box

10

-

150

... More
Electrification to 512 houses at Kharmanghat;LOADING of 3PLTTriv meter with PVC box

10

-

150

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV HG Fuse Sets

5

-

90

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV HG Fuse Sets

5

-

90

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 160&250kva DTR

4

-

1764

... More
Electrification to 512 houses at Kharmanghat;LOADING of 160&250kva DTR

4

-

1872

... More
Electrification to 512 houses at Kharmanghat;Erection of 3 Phase 160kva Distribution Transformer Erection of 9.1M 280Kg WL PSCC Pole , excavation pit of 2 1/2' x 2 1/2' x 5' size and erection of single pole structure including concreting of pole, supply and fabrication of top channel, cross channel, angles for AB Switch supporting and fixing of channels and angles & erection of clamps etc,. (Including support angle in between tapping and AB Switch)

4

-

9680

... More
Electrification to 512 houses at Kharmanghat;Painting AB switch OP rods with PO red

5

-

710

... More
Electrification to 512 houses at Kharmanghat;Laying of 1Core XLPE 120Sqmm Cable

500

-

10000

... More
Electrification to 512 houses at Kharmanghat;Supply of 2" B class GI pipe

192

-

58944

... More
Electrification to 512 houses at Kharmanghat;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite powder, earth, running of earth wire etc., complete, including cost of bentonite powder

64

-

70400

... More
Electrification to 512 houses at Kharmanghat;Supply of CI Pipe earthing 50mm dia 2m long

64

-

156224

... More
Electrification to 512 houses at Kharmanghat;Construction of platform for erection of meter panel board with construction of 2 Nos. of 6 blocks of brick masonry of size (2'x9"x3') or (0.6x0.23x0.9m) with (0.3m) 1' ht below ground level and (0.6m) 2' ht along ground level with plastering to the exposed surface including cost & conveyance of all meterials

32

-

81120

... More
Electrification to 512 houses at Kharmanghat;Raising of 3.5x95sqmm cable single run on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

192

-

12864

... More
Electrification to 512 houses at Kharmanghat;Laying of 3.5x95sqmm XLPE UG cable Single run including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

768

-

226560

... More
Electrification to 512 houses at Kharmanghat;Supply of Danger boards with clamps

50

-

5800

... More
Electrification to 512 houses at Kharmanghat;Painting of Name on Panel

32

-

1600

... More
Electrification to 512 houses at Kharmanghat;Supply of LT Lugs

336

-

3696

... More
Electrification to 512 houses at Kharmanghat;Supply of PVC cleats

50

-

1750

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV AB SWCH T.T.200/400 A

5

-

400

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV AB SWCH T.T.200/400 A

5

-

400

... More
Electrification to 512 houses at Kharmanghat;Providing of screws,nuts etc for energy meter

12

-

228

... More
Electrification to 512 houses at Kharmanghat;Fixing of 3Ph meters in the box

7

-

518

... More
Electrification to 512 houses at Kharmanghat;Fixing of 1Ph meters in the box

5

-

265

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LT AB Cable (XLPE) 1 Core

1

-

202

... More
Electrification to 512 houses at Kharmanghat;LOADING of LT AB Cable (XLPE) 1 Core

1

-

393

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of Three Phase Meters-100 lot

1

-

185

... More
Electrification to 512 houses at Kharmanghat;LOADING of Three Phase Meters 100nos lot

1

-

185

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of Single phase Meters-100 lot

1

-

128

... More
Electrification to 512 houses at Kharmanghat;LOADING Single phase Meters 100nos lot

1

-

128

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of MS Channel,Angles,Flats&Rod

0.3

-

55.5

... More
Electrification to 512 houses at Kharmanghat;LOADING of MS Channel,Angles,Flats&Rods

0.3

-

66.3

... More
Electrification to 512 houses at Kharmanghat;Unload-LT XLPE UG Cable all size

2

-

404

... More
Electrification to 512 houses at Kharmanghat;Load-LT XLPE UG Cable for all size

2

-

786

... More
Electrification to 512 houses at Kharmanghat;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

85

-

32810

... More
Electrification to 512 houses at Kharmanghat;Supply of supporting GI Bolts & Nuts,Washers etc.,

100

-

9400

... More
Electrification to 512 houses at Kharmanghat;Fixing of PVC Cleats for LT Cable

50

-

1350

... More
Electrification to 512 houses at Kharmanghat;Supply, transporting & erection of indoor type Metering Pannel -3 Ph (1 Mtr) box with 14SWG CRCA sheet steel duly fabricating complete with cleaning 7 tank process & painting with 2coats of powder coating enamel painting inter locking arrangement and air vent provision on side of the box. Complete erection of panel and fixing of all above items, testing, commissioning as directed by department officers ( approx. 11X11 inches (LXB ) for each single phase meter box for each meter with 4sqmm copper cable with standard make for internal connections (wiring) and 63A MCB with ISI standard for each meter , 1no. rated MCB 3 pole for incoming supply for each panel board with Aluminium bus bar of size 10X20 mm with 1 no junction box/distribution box for 2 no. panel boards

7

-

24500

... More
Electrification to 512 houses at Kharmanghat;Supply transporting & erection of indoor type Metering Pannel -1 Ph (1 Mtr) box with 14SWG CRCA sheet steel duly fabricating complete with cleaning 7 tank process & painting with 2coats of powder coating enamel painting inter locking arrangement and air vent provision on side of the box. Complete erection of panel and fixing of all above items, testing, commissioning as directed by department officers ( approx. 11X11 inches (LXB ) for each single phase meter box for each meter with 4sqmm copper cable with standard make for internal connections (wiring) and 32A MCB with ISI standard for each meter , 1no. rated MCB 3 pole for incoming supply for each panel board with Aluminium bus bar of size 10X20 mm with 1 no junction box/distribution box for 2 no. panel boards

517

-

1034000

... More
Electrification to 512 houses at Kharmanghat;Cutting Charges for MS channel 75x40mm

10

-

94.5

... More
Electrification to 512 houses at Kharmanghat;Fabrication of Back clamps(50 x 6 mm) MS Flat with 2 coats of Red oxide painting

30

-

450

... More
Electrification to 512 houses at Kharmanghat;Painting of Structure/DTR Code & Location Name

5

-

550

... More
Electrification to 512 houses at Kharmanghat;Supply and Earthing GI Wire No 8 including material

50

-

4200

... More
Electrification to 512 houses at Kharmanghat;Supply and Earthing of GI flat 25x3 mm including material

320

-

26880

... More
Electrification to 512 houses at Kharmanghat;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite powder, earth, running of earth wire etc., complete, including cost of bentonite powder

21

-

23100

... More
Electrification to 512 houses at Kharmanghat;Supply of 80mm dia 6mm thick 2.75Mtrs. long CI earth pipe with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite, RCC collar of size 0.6M dia x 0.5 M height

21

-

58569

... More
Electrification to 512 houses at Kharmanghat;Mass concreting of Supports with 40 mm HBG metal using 1:4:8 CC including cost of all materials and curing after concreting (River sand metal, cement water shall be procured by the contractor) (0.56 cum/pole)

2.7

-

13932

... More
Electrification to 512 houses at Kharmanghat;Construction of RCC Column Type Plinth of column size 1'x1'x13', footing size 5'x5'x9", slab size 5'x5'x6", beam size 5'x9"x9" above ground 8' (ft) and below the ground 5' (ft) along with sub-base of 5'x5'x6" with PCC (1:4:8) of 40mm metal including plastering

5

-

128250

... More
Electrification to 512 houses at Kharmanghat;Running of 11 KV jumpering to 11 KV AB switch, HG Fuse set and distribution transformers terminal etc. complete

5

-

1650

... More
Electrification to 512 houses at Kharmanghat;Erection of CT Meters on LV Side of DTR?s including transportation and accessories like Lugs, clamps but excluding cable

10

-

8660

... More
Electrification to 512 houses at Kharmanghat;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc(Including PVC Cleats)

10

-

12420

... More
Electrification to 512 houses at Kharmanghat;Erection of 11 KV HG Fuse set including earthing in existing Substation

5

-

3300

... More
Electrification to 512 houses at Kharmanghat;Erection of 11 KVAB Switch 200 A tilting type including alignment and earthing

5

-

7022.7

... More
Electrification to 512 houses at Kharmanghat;Numbering of poles including cost of paint

40

-

1200

... More
Electrification to 512 houses at Kharmanghat;Stringing of LT AB cable 3x16+25, fixing of clamps, tensioning excluding transportation, loading and unloading, including cost of bolts and nuts.

0.5

-

2568.5

... More
Electrification to 512 houses at Kharmanghat;Transport of steel including line materials such as cross arms, clamps, hardware, cable (loose) and other line materials (Including loading and unloading) upto 10KM

1

-

326

... More
Electrification to 512 houses at Kharmanghat;Assembly and erection of 11KV< stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

5

-

2375

... More
Electrification to 512 houses at Kharmanghat;Excavation of pits in all soils except hard rock requiring blasting(2.6" x 2.6" x 5.0')

18

-

6552

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LT Three phase cross arms

50

-

50

... More
Electrification to 512 houses at Kharmanghat;LOADING of LT Three phase cross arms

50

-

50

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LTPins

2

-

76

... More
Electrification to 512 houses at Kharmanghat;LOADING of LTPins

2

-

108

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LT Metal parts - bag of 100

1

-

35

... More
Electrification to 512 houses at Kharmanghat;LOADING of LT Metal parts-Bag of 100nos

1

-

52

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LT Shackle insulators

2

-

42

... More
Electrification to 512 houses at Kharmanghat;LOADING of LT Shackle insulators

2

-

52.5

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of LT Pin insulators

3

-

54

... More
Electrification to 512 houses at Kharmanghat;LOADING of LT Pin insulators

3

-

78.75

... More
Electrification to 512 houses at Kharmanghat;Supply of 1Phase 1Pole MCB:Hager/ABB/Legrand/Siemen

5

-

1150

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV Stay Set

10

-

40

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV Stay Set

10

-

40

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of MS Channel,Angles,Flats&Rod

1

-

185

... More
Electrification to 512 houses at Kharmanghat;LOADING of MS Channel,Angles,Flats&Rods

1

-

221

... More
Electrification to 512 houses at Kharmanghat;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

1

-

333

... More
Electrification to 512 houses at Kharmanghat;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Upto 10 Km with Lorry for each trip

2

-

5334

... More
Electrification to 512 houses at Kharmanghat;Supply&Fixing of 2.5sqmm PVC Wire for secondary conncetions for HT services

150

-

3750

... More
Electrification to 512 houses at Kharmanghat;Formation of LTCut point(Vertical/ Horizontal) single circuit

12

-

11256

... More
Electrification to 512 houses at Kharmanghat;Supply and Earthing GI Wire No 8 including material

50

-

4200

... More
Electrification to 512 houses at Kharmanghat;Fixing of Metal halide lamps with fixtures ake: philips,Crompton,Bajaj junction box with MCB with 1.5 GI pipe complete.

28

-

35504

... More
Electrification to 512 houses at Kharmanghat;Supply of 90W LED fixture set of reputed make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty

28

-

229600

... More
Electrification to 512 houses at Kharmanghat;Cutting Charges for MS angle all sizes

50

-

367.5

... More
Electrification to 512 houses at Kharmanghat;Fabrication of Back clamps(50 x 6 mm) MS Flat with 2 coats of Red oxide painting

60

-

900

... More
Electrification to 512 houses at Kharmanghat;Fabrication of LT 3-Ph cross arms MS angle 50x50x6 with two coats of Red Oxide Painting

50

-

1600

... More
Electrification to 512 houses at Kharmanghat;Supply of supporting GI Bolts & Nuts,Washers etc.,

200

-

18800

... More
Electrification to 512 houses at Kharmanghat;Sub transport of 9.1Mt PSCC Pole from RR Stores to work site including loading &unloading charges

8

-

2904

... More
Electrification to 512 houses at Kharmanghat;Sub transport of 8Mt PSCC Pole from RR Stores to work site including loading &unloading charges

32

-

7744

... More
Electrification to 512 houses at Kharmanghat;Stringing of AB cable 3x70 + 1x16 + 1x50, fixing of clamps, tensioning excluding transportation, loading and unloading, including cost of bolts and nuts.

1

-

15168

... More
Electrification to 512 houses at Kharmanghat;Mass concreting of Supports with 40 mm HBG metal using 1:4:8 CC including cost of all materials and curing after concreting (River sand metal, cement water shall be procured by the contractor) (0.56 cum/pole)

10.16

-

52425.6

... More
Electrification to 512 houses at Kharmanghat;Erection of 9.1M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

8

-

12968

... More
Electrification to 512 houses at Kharmanghat;Erection of 8.0 mt PSCC poles in positioning,aligning and setting to work , fixing of cross arms and top clamps earthing of supports,back fitting with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

32

-

28608

... More
Electrification to 512 houses at Kharmanghat;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit

5

-

1270

... More
Electrification to 512 houses at Kharmanghat;Excavation of pits in hard rock requiring blasting. (other than SS) (2.6" x 2.6" x 5.0') 0.88 cum

22

-

27720

... More
Electrification to 512 houses at Kharmanghat;survey of line&cable including peg mark&tree clear

1.44

-

720

... More
Electrification to 512 houses at Kharmanghat;Supply of GI Bolts & Nuts,Washers etc.,

50

-

4700

... More
Electrification to 512 houses at Kharmanghat;Excavation of pit (2.6" x 2.6" x 5.0")in hard gravel/normal soil

4

-

1456

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 33 & 11 KV Disc insulator

5

-

10

... More
Electrification to 512 houses at Kharmanghat;LOADING of 33 & 11 KV Disc insulators

5

-

10

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV Metal parts Bag

1

-

48

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV Metal parts

1

-

48

... More
Electrification to 512 houses at Kharmanghat;Unload-11KV Polymer Pin Insulator-GI pin

30

-

39

... More
Electrification to 512 houses at Kharmanghat;Load-11KV Polymer Pin Insulator-GI pin

30

-

39

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV V - Cross arms

10

-

30

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV V - Cross arms

10

-

30

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of 11 KV Stay Set

5

-

20

... More
Electrification to 512 houses at Kharmanghat;LOADING of 11 KV Stay Set

5

-

20

... More
Electrification to 512 houses at Kharmanghat;Mass concreting of Supports with 40 mm HBG metal using 1:4:8 CC including cost of all materials and curing after concreting (River sand metal, cement water shall be procured by the contractor) (0.56 cum/pole)

3.78

-

19504.8

... More
Electrification to 512 houses at Kharmanghat;UNLOADING of MS Channel,Angles,Flats&Rod

0.2

-

37

... More
Electrification to 512 houses at Kharmanghat;LOADING of MS Channel,Angles,Flats&Rods

0.2

-

44.2

... More
Electrification to 512 houses at Kharmanghat;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

1

-

333

... More
Electrification to 512 houses at Kharmanghat;Transport of steel including line materials such as cross arms, clamps, hardware, cable (loose) and other line materials (Including loading and unloading) upto 10KM

1

-

326

... More
Electrification to 512 houses at Kharmanghat;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Upto 10 Km with Lorry for each trip

1

-

2667

... More
Electrification to 512 houses at Kharmanghat;Numbering of poles including cost of paint

14

-

420

... More
Electrification to 512 houses at Kharmanghat;Cutting Charges for MS angle all sizes

200

-

1470

... More
Electrification to 512 houses at Kharmanghat;Coil earthing of pole with No.8 GI wire including supply of nutbolts with pit size 0.76x0.76x1.83 mts in all soils except hard rock

10

-

3860

... More
Electrification to 512 houses at Kharmanghat;Fabrication of Back clamps with 50 x 6 mm MS Flat including 2 coats of Red oxide painting

40

-

600

... More
Electrification to 512 houses at Kharmanghat;Paving out of conductor 55sqmm 33/11kv Line 3 Cond single circuit providing temporary stays and tensioning, sagging correctly pin binding, including transportation material to work site

0.5

-

3734.5

... More
Electrification to 512 houses at Kharmanghat;Formation of Horizontal Cut point for 11 KV Single Circuit line excluding pole erection and stays

10

-

11190

... More
Electrification to 512 houses at Kharmanghat;survey of line&cable including peg mark&tree clear

0.5

-

250

... More
Electrification to 512 houses at Kharmanghat;Sub transport of 8.0Mt PSCC Pole from RR Stores to work site including loading &unloading charges

4

-

968

... More
Electrification to 512 houses at Kharmanghat;Sub transport of 9.1Mt PSCC Pole from RR Stores to work site including loading &unloading charges

10

-

3630

... More
Electrification to 512 houses at Kharmanghat;Assembly and erection of 11KV< stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

5

-

2375

... More
Electrification to 512 houses at Kharmanghat;Erection of 8.0 mt PSCC poles in positioning,aligning and setting to work , fixing of cross arms and top clamps earthing of supports,back fitting with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

4

-

3576

... More
Electrification to 512 houses at Kharmanghat;Erection of 9.1M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

10

-

16210

... More
Electrification to 512 houses at Kharmanghat;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit

5

-

1270

... More
Electrification to 512 houses at Kharmanghat;Excavation of pits in hard rock requiring blasting. (other than SS) (2.6" x 2.6" x 5.0') 0.88 cum

10

-

12600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.