Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Opening Date29 Dec 2021
Closing Date19 Jan 2022
Tender Amount₹ 3,17,73,970 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SECUNDERABAD CIRCLE OFFICE;Hiring of JCB to clear and level the site including labour and material charges

8

-

6800

... More
SECUNDERABAD CIRCLE OFFICE;Earth Work Mass Excavation to a depth as directed, in soils such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders and in all conditions such as dry, wet, slurry etc.and in dense or hard soils, disposal and depositing of excavated soil with intial lead of 10 mt and intial lift of 2m or as directed, including cost and conveyance of all materials, ramping and lifting of materials, and labour charges, hire charges of machinery, tools & plants, bailing of water ( either sub soil water, storm water, rain water, surface water or of any kind) if any at any stage of work until all works below ground level is finished to the satisfaction ,and from work such as shoring, timbering, strutting with required supports etc. for the work and removal of form work after completion of work etc all complete as directed by the engineer-incharge.

393.7

-

163263.45

... More
SECUNDERABAD CIRCLE OFFICE;Filling with sand in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.

33.6

-

94521.5

... More
SECUNDERABAD CIRCLE OFFICE;Filling with already available Earthwork in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.

214.5

-

43288.25

... More
SECUNDERABAD CIRCLE OFFICE;Laying Plain C.C (1:4:8) using 40 mm HBG metal including cost & conveyance of all materials labour charges ,curing, all leads lifts etc., complete for finished item of work.

33.6

-

162685.49

... More
SECUNDERABAD CIRCLE OFFICE;Laying Plain C.C(1:2:4) nominal mix using 20 mm HBG metal incldg cost & conveyance of all materials mixing,curing,all labour charges,etc comp for finished item of work..

45.1

-

298841.17

... More
SECUNDERABAD CIRCLE OFFICE;C.R.S Masonry in C.M(1:6) using HBG stone including cost & conveyance of all materials labour charges,curing,all leads lifts etc., complete for finished item of work.

37.6

-

184906.27

... More
SECUNDERABAD CIRCLE OFFICE;Filling with gravel in basement with 150mm thick layers incldg cost & conveyance all materials watering, consolidation etc complete for finished item of work.

246.8

-

81266.3

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. GROUND FLOOR RCC Footing: M20Gr, Steel Centering

54.2

-

512524.96

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. GROUND FLOOR RCC Column GF: M20Gr, Steel centerng

21.7

-

275772.93

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. GROUND FLOOR RCC PlinthBeam: M20 Gr, Steel Centering

18

-

214642.44

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. GROUND FLOOR RCC Roof Beam GF: M20Gr, Steel centerng

14.7

-

174625.71

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. GROUND FLOOR RCC Roof Slab GF: M20Gr, Steel centerng

53.6

-

611163.28

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FIRST FLOOR RCC Column FF: M20 Gr, Steel centerng

18.3

-

238969.27

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FIRST FLOOR RCC Roof Beam 1F: M20Gr, Steel centerng

14.7

-

178926.93

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FIRST FLOOR RCC Lintel 1F: M20Gr, Steel centerng

3.04

-

38851.9

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FIRST FLOOR RCC Sunshade 1F: M20Gr, Steel centerng

47.7

-

62881.48

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FIRST FLOOR RCC Roof Slab 1F: M20Gr, Steel centerng

53.6

-

625570.96

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. SECOND FLOOR RCC Column 2F: M20Gr,Steel centerng

18.3

-

245348.65

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. SECOND FLOOR RCC Roof Beam 2F: M20Gr, Steel centerng

14.7

-

183207.57

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. SECOND FLOOR RCC Lintel 2F: M20Gr, Steel centerng

3.04

-

39540.07

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. SECOND FLOOR RCC Sunshade 2F: M20Gr, Steel centerng

47.7

-

64617.76

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. SECOND FLOOR RCC Roof Slab 2F: M20Gr, Steel centerng

53.6

-

639378.32

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. THIRD FLOOR RCC Column 3F: M20Gr,Steel centerng

18.3

-

251676.79

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. THIRD FLOOR RCC Roof Beam 3F: M20Gr, Steel centerng

14.7

-

187529.37

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. THIRD FLOOR RCC Lintel 3F: M20Gr, Steel centerng

3.04

-

40287.9

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. THIRD FLOOR RCC Sunshade 3F: M20Gr, Steel centerng

47.7

-

66420.82

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. THIRD FLOOR RCC Roof Slab 3F: M20Gr, Steel centerng

53.6

-

653786

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FOURTH FLOOR RCC Column 4F: M20Gr,Steel centerng

3.1

-

43718.77

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FOURTH FLOOR RCC Roof Beam 4F: M20Gr, Steel centerng

6.2

-

80899.46

... More
SECUNDERABAD CIRCLE OFFICE;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. FOURTH FLOOR RCC Roof Slab 4F: M20Gr, Steel centerng

5.1

-

63521.01

... More
SECUNDERABAD CIRCLE OFFICE;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Brick masonary in CM(1:6) Gfloor

38.2

-

264356.22

... More
SECUNDERABAD CIRCLE OFFICE;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Brick masonary in CM(1:6) 1floor

88.1

-

629881.52

... More
SECUNDERABAD CIRCLE OFFICE;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Brick masonary in CM(1:6) 2floor

88.1

-

650066.11

... More
SECUNDERABAD CIRCLE OFFICE;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Brick masonary in CM(1:6) 3floor

88.1

-

670262.16

... More
SECUNDERABAD CIRCLE OFFICE;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Brick masonary in CM(1:6) 4floor

41

-

321322.74

... More
SECUNDERABAD CIRCLE OFFICE;Reinforced Brick masonry for wall in superstructure (115mm thick) in CM 1:4 using traditional Local made Bricks from approved sourse and quality haveing crushing strength of not less than 3.5 Kgs/sqm and placing 2-6mm dia. MS rods at every 3 rd course including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heghts levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Reinforced brick masonary GF

45.7

-

39687.71

... More
SECUNDERABAD CIRCLE OFFICE;Reinforced Brick masonry for wall in superstructure (115mm thick) in CM 1:4 using traditional Local made Bricks from approved sourse and quality haveing crushing strength of not less than 3.5 Kgs/sqm and placing 2-6mm dia. MS rods at every 3 rd course including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heghts levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Reinforced brick masonary 1Floor

144

-

132649.92

... More
SECUNDERABAD CIRCLE OFFICE;Reinforced Brick masonry for wall in superstructure (115mm thick) in CM 1:4 using traditional Local made Bricks from approved sourse and quality haveing crushing strength of not less than 3.5 Kgs/sqm and placing 2-6mm dia. MS rods at every 3 rd course including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heghts levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Reinforced brick masonary 2Floor

144

-

140237.28

... More
SECUNDERABAD CIRCLE OFFICE;Reinforced Brick masonry for wall in superstructure (115mm thick) in CM 1:4 using traditional Local made Bricks from approved sourse and quality haveing crushing strength of not less than 3.5 Kgs/sqm and placing 2-6mm dia. MS rods at every 3 rd course including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heghts levels and floors all incidental charges etc complete as per directions of the Engineer - in - charge and for finished item of work. Reinforced brick masonary 3Floor

144

-

147830.4

... More
SECUNDERABAD CIRCLE OFFICE;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

67.2

-

4935688.13

... More
SECUNDERABAD CIRCLE OFFICE;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work and as directed bty the Engineer - in - charge. Plastering 20mm(16 mm+4 mm) Gfloor

803.5

-

411512.52

... More
SECUNDERABAD CIRCLE OFFICE;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work and as directed bty the Engineer - in - charge. Plastering 20mm(16 mm+4 mm) 1floor

1539.8

-

796707.92

... More
SECUNDERABAD CIRCLE OFFICE;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work and as directed bty the Engineer - in - charge. Plastering 20mm(16 mm+4 mm) 2floor

1539.8

-

804791.87

... More
SECUNDERABAD CIRCLE OFFICE;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work and as directed bty the Engineer - in - charge. Plastering 20mm(16 mm+4 mm) 3floor

1539.8

-

812922.01

... More
SECUNDERABAD CIRCLE OFFICE;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work and as directed bty the Engineer - in - charge. Plastering 20mm(16 mm+4 mm) 4floor

166.1

-

88566.18

... More
SECUNDERABAD CIRCLE OFFICE;Raised pointing in CM(1:3) including curing, cost and conveyance of all materials and labour charges for complete item of work.

21.47

-

2508.98

... More
SECUNDERABAD CIRCLE OFFICE;Providing Reinforced Cement shelves in CM 1:2 of 25 mmm thick over rabbit wire mesh and plastering of 12mm thick in CM 1:3 prop and including cost and conyance of all materials and labour charges etc at all floors heights etc for finished item of work excluding cost of steel and its fabrication for finished item of work in all floors. RCM Racks without steel&plastering 1floor

96.2

-

18681.08

... More
SECUNDERABAD CIRCLE OFFICE;Providing Reinforced Cement shelves in CM 1:2 of 25 mmm thick over rabbit wire mesh and plastering of 12mm thick in CM 1:3 prop and including cost and conyance of all materials and labour charges etc at all floors heights etc for finished item of work excluding cost of steel and its fabrication for finished item of work in all floors. RCMRacks without steel&plastering 2floor

96.2

-

19186.13

... More
SECUNDERABAD CIRCLE OFFICE;Providing Reinforced Cement shelves in CM 1:2 of 25 mmm thick over rabbit wire mesh and plastering of 12mm thick in CM 1:3 prop and including cost and conyance of all materials and labour charges etc at all floors heights etc for finished item of work excluding cost of steel and its fabrication for finished item of work in all floors. RCMRacks without steel&plastering 3floor

96.2

-

19694.06

... More
SECUNDERABAD CIRCLE OFFICE;Providing impervious coat over RCC roof slab surfaces to requried slopes with 20mm thick in CM 1:3 pro mixed with approved brand of water proofing compound as the rate of 1 kg per bag of cement including cost and conveyance of all materials, water, all labour charges, chemicals, curing for specifed number of days , rounding off junctions of wall and slab, all leads, lifts, heights,levels and floors etc . complete as directed by the Engineer - in - charge for finished item of work. Impervious coat 20mm CM(1:3) TF

362.2

-

195493.83

... More
SECUNDERABAD CIRCLE OFFICE;Providing impervious coat over RCC roof slab surfaces to requried slopes with 20mm thick in CM 1:3 pro mixed with approved brand of water proofing compound as the rate of 1 kg per bag of cement including cost and conveyance of all materials, water, all labour charges, chemicals, curing for specifed number of days , rounding off junctions of wall and slab, all leads, lifts, heights,levels and floors etc . complete as directed by the Engineer - in - charge for finished item of work. Impervious coat 20mm CM(1:3) FF

37.2

-

20078.33

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing in position of doors with MT Wood Frame with Flush Door Shutter 35mm thick with 9 mm laminate of approved quality and design and fitted with teak wood lippings around duly polished/synthetic enamil paint including all operational, incidental, labour charges etc. complete for finished item of work

99.6

-

626546.75

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing Powder Coated Aluminium Anodised Doors - Single Shutter (fully glazed) as per approved drawing with aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.45 mm x 47.62 mm x 1.95 section 19571 , bottom of size 44.45 mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45 mm x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 mm and fitted with 5mm thick both sides plain float glass for shutter including supply and fixing aluminium handles of 125 mm for each shutter, Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed adjustment assembly, aluminum door stopper and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work

20.7

-

114933.85

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of approved colour powder coated Aluminium Anodized Casement windows as per approved drawing with aluminium anodized sections of Series C Jindal or approved equivalent make Hollow sections and outer frame of 8804 of size 46 x 44 mm, Shutter frame of 8802 of size 44 mm x 46 mm and Mullion frame of 8803 of size 59 x 38 and glazing section of 4433 with plain clear float glass 6 mm thick fixed including supply and fixing aluminium powder coated 1 No. of casement friction stay hinges for each shutter, 1 Nos. aluminium handles of 150 mm for each shutter and all labour charges for fixing the fixtures with required no. of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as directed by the Engineer - in - charge.

88.2

-

279726.3

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of MS safety grill with peripheral frame of ISA 25x25x4mm and 8mm square rods at 100mm c/c both in horizontal & vertical direction including cost and coveyance of all mateirals with all leads and lifts, labour charges, painting charges complete for finished item of work

132.3

-

305348.4

... More
SECUNDERABAD CIRCLE OFFICE;Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work

20.7

-

71746.2

... More
SECUNDERABAD CIRCLE OFFICE;Flooring with vitrified Tiles of 1 st Class Quality of approved size over CM 1:3 of 38 mm thick base coat and neat grey cement slurry of honey like consistancy spread at the rate of 3.3 kg of cement per sqm and pointed to full depth, (Joints must be flushed ) with white cement paste mixed with pigment when required including cost and conveyance of cement and all materials, labour charges, at all levels, heights and floors, curing etc. complete as directed by the engineer-in-charge and for finished item of work (RAK ceramics/ Jhonson & Jhonson/ Kajaria/ Nitco / Marbonite)

598

-

584724.4

... More
SECUNDERABAD CIRCLE OFFICE;Providing skirting with vitrified tiles of 1st Class quality over CM 1:3 of 38 mm thick base coat and neat grey cement slurry of honey like consistancy spread at the rate of 3.3 kg of cement per sqm including cost & conveyance of all materials,labour charges etc complete for finished item of work.(RAK ceramics/ Jhonson & Jhonson/ Kajaria/ Nitco / Marbonite)

30.5

-

29525.52

... More
SECUNDERABAD CIRCLE OFFICE;Flooring with ceramic tiles of 1st class quality of approved brand shade and design of different size laid over a floor bed of CM 1:3 of 12 mm thick base coat and neat grey cement slurry of honey like consistancy spread at the ratet of 3.3 kg of cement per sqm and pointed to full deapth, (joints must be flushed) with white cement paste mixed with pigment when requied including cost and conveyance of cement and all materials ,labour charges, at all levels, heights and floors,curing etc. complete as directed by the Engineer - in chrge adn for finished item of work.

108

-

89874.36

... More
SECUNDERABAD CIRCLE OFFICE;Flooring with decorated white back ground glazed tiles, set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed neatly with white cement paste mixed with pigment of matching shadeto full depth, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

358.7

-

304209.88

... More
SECUNDERABAD CIRCLE OFFICE;Flooring with high polished granite slabs of approved colour and quality of 18mm to 20mm thick up to 8 length over CM 1:3 of 38 mmm thick base coat and neat gray cemrnt slurry of honey like consistancy spread the rate of 3.3 kg of cement kgs per sqm and pointed to fulll death (joints must be flushed) with white cement paste mixed with pigment when requirede including cost and conyance of cement and all materials, labour charges,at all levels, heights and floors, cring etc. complete as directed by the Engineer - in - charge and for finished ittem of work.

353.6

-

1497941.54

... More
SECUNDERABAD CIRCLE OFFICE;Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand, water etc., complete, including seigniorage charges, etc., complete for finished item of work

99.3

-

175611.06

... More
SECUNDERABAD CIRCLE OFFICE;Full Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same etc complete for finished item of work.

98

-

68874.4

... More
SECUNDERABAD CIRCLE OFFICE;Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade ) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

185.76

-

154585.76

... More
SECUNDERABAD CIRCLE OFFICE;Providing of Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade including Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish

35

-

21042

... More
SECUNDERABAD CIRCLE OFFICE;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning to internal walls of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

3500.6

-

728964.94

... More
SECUNDERABAD CIRCLE OFFICE;Painting in all floors as specified with two coats of plastic emulsion paint of approved colour make and shade over one coat of white primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work .

4877

-

642349.67

... More
SECUNDERABAD CIRCLE OFFICE;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work . Paint-PlasticEmulsn 2coats+Primer-extnl GF

137.7

-

28850.9

... More
SECUNDERABAD CIRCLE OFFICE;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work . Paint-PlasticEmulsn 2coats+Primer-extnl 1F

254.4

-

54640.03

... More
SECUNDERABAD CIRCLE OFFICE;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work . Paint-PlasticEmulsn 2coats+Primer-extnl 2F

254.4

-

55975.63

... More
SECUNDERABAD CIRCLE OFFICE;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work . Paint-PlasticEmulsn 2coats+Primer-extnl 3F

254.4

-

57318.86

... More
SECUNDERABAD CIRCLE OFFICE;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work . Paint-PlasticEmulsn 2coats+Primer-extnl4F

339.9

-

78374.14

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of Sun Control film to the glazed windows ,partition including labour charges etc complete for finished item of work.

88.2

-

26371.8

... More
SECUNDERABAD CIRCLE OFFICE;Cup Board shutters using wooden Particle Board & Shutter using Pre-Laminated Particle Board as per IS 14276. Supply and fixing of cup board shutters using 18mm thick wooden prelaminated Particle Board for making frame of size 100mm x 35mm using two sandwiched 16mm boards, one plain board and one Pre-Laminated particle board with 2mm PVC edge banding. The Shutters are made of 16mm thick Pre-Laminated Particle Board of approved shade inclusive of hardware like M.S. powder coated Hettic/EBBCO box type hinges, MS powder coated handles of size 4? (101.6mm), MS tower bolt 4? (101.6mm) Gore locks, screws, wood lipping and Fevicol etc., complete finish item of work

437.5

-

2843750

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypusm) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick along the perimeter of ceiling screw fixed to briuck work/partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15 mm x 15 mm x 0.9 mm ) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm ) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification

604.4

-

583276.22

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing Vertical Venetian Blinds of 100mm wide of fabric, 3mm guard protected of approved colour and make vista/levelor including cost of all materials, Labour & Taxes etc., for finished item of work as approved by the Engineer incharge.

88.2

-

67032

... More
SECUNDERABAD CIRCLE OFFICE;Providing and fixing IS: 3564 marked Aluminium Extruded Section Body Tubular Type Universal Hydraulic Door Closer with double speed adjustment, Hardwyn make (GAZEL) with necessary accessories and screws etc. complete

16

-

19888

... More
SECUNDERABAD CIRCLE OFFICE;Supply &fixing of double action brass plate floor spring hyper brand including cost of cutting floors as required, embedding in floors and S.S.cover plates with brass pivot and single piece M.S. Sheet outer box with slide plate etc.complete for finished item of work

8

-

32912

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of Heavy duty mortise lock 6/7 levers with brass heavy handles inclding required material and labour charges etc complete for finished item of work

15

-

32715

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of Keyless lockset for toilets with brass handles (complete set) inclding required material and labour charges etc complete for finished item of work

25

-

7900

... More
SECUNDERABAD CIRCLE OFFICE;Geophysical investigation charges for water point by geologlist (certified isssued by GEOLOGIST SHALL BE PRODUCED.

1

-

3000

... More
SECUNDERABAD CIRCLE OFFICE;Drilling of 6 1/2" bore well with machine rig including depolyment and hire charges of rig and other machinery and equiment labour charges, measuring the yield of borewell, collecting soil samples furnnishing their analysis including cosst and conveyance. 0 to 60 M

60

-

18300

... More
SECUNDERABAD CIRCLE OFFICE;Drilling of 6 1/2" bore well with machine rig including depolyment and hire charges of rig and other machinery and equiment labour charges, measuring the yield of borewell, collecting soil samples furnnishing their analysis including cosst and conveyance. 61 to 90 M

30

-

9150

... More
SECUNDERABAD CIRCLE OFFICE;Drilling of 6 1/2" bore well with machine rig including depolyment and hire charges of rig and other machinery and equiment labour charges, measuring the yield of borewell, collecting soil samples furnnishing their analysis including cosst and conveyance. 91 to 120 M

30

-

10080

... More
SECUNDERABAD CIRCLE OFFICE;Drilling of 6 1/2" bore well with machine rig including depolyment and hire charges of rig and other machinery and equiment labour charges, measuring the yield of borewell, collecting soil samples furnnishing their analysis including cosst and conveyance. 121 to 150 M

30

-

10080

... More
SECUNDERABAD CIRCLE OFFICE;Drilling of 6 1/2" bore well with machine rig including depolyment and hire charges of rig and other machinery and equiment labour charges, measuring the yield of borewell, collecting soil samples furnnishing their analysis including cosst and conveyance. 151 & above

80

-

26880

... More
SECUNDERABAD CIRCLE OFFICE;Suppy & fixing of PVC rigid casing pipe of 165mm dia. with a test pressures of 6 kg/sqcm of standard make with ISI mark upto a length of over burden includng cost and conyance of pipes, coupling ,MS Dummy ,clamp set all other fixture, labour charges etc complete. 0 to 10 M

10

-

6920

... More
SECUNDERABAD CIRCLE OFFICE;Suppy & fixing of PVC rigid casing pipe of 165mm dia. with a test pressures of 6 kg/sqcm of standard make with ISI mark upto a length of over burden includng cost and conyance of pipes, coupling ,MS Dummy ,clamp set all other fixture, labour charges etc complete. 10 to 30 M

20

-

13840

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of HDPE pipe ISI mark 40mm dia suitable for pressure of 6 KG per sqcm connected to pump set with required material labour charges etc. complete.

220

-

34388.2

... More
SECUNDERABAD CIRCLE OFFICE;Supply and Fixing of 2.00HP 25 Stage single phase ISI submersible motor pumpset suitble for 150mm borewell with high quality water resistance and dynamically balance bronze impeller with stainless steel shaft sleeves pump coupling and pivot of 3 phase 415 V 50 H2 A. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

1

-

26957

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of 3 Core 2.5 Sqmm Flat Copper cable of ISI for Submersible Motors of makes Finolex / Polycab / Gold Medal / Million / Payal / Power Flex / Fortune Ar

270

-

25798.5

... More
SECUNDERABAD CIRCLE OFFICE;Supply and errecting approved make D.O.L starter 400V, 3 phase, 50 HZ enclosed with no volt coil and overload element with nessary meterials, transportation and aall labour charges etc complete.

1

-

2617.41

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing 25mm dia 2mm thick recessed( concealed) PVC pipe alog with reinforcement to be laid in slab including No 14 SWG GI wire for earth contunity, cost of pipe, binding wire and all labour charges etc complete

1500

-

132315

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of 25mm dia 2mm thick PVC conduit pipe conceald in wall with all required accessories with No 14 SWG wire for earth conitunity including chisiling the wall whereever necessary, including masonary work and all labour charges complete.

800

-

80376

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of 20mm dia 2mm thick PVC conduit pipe conceald in wall with all required accessories with No 14 SWG wire for earth conitunity including chisiling the wall whereever necessary, including masonary work and all labour charges complete.

800

-

74648

... More
SECUNDERABAD CIRCLE OFFICE;Wiring with 2X1.0 Sqm(14/.3mm) PVC insulated flexiable copper cable in the existing metalic/Non metalic conduit pipe with 6A modular SP switch, mounted on metalic box covereds with appropriate front plate modules etc ceiling rose including cot and conveyance of all mateials, labour charges complete for light points, bell points exhaust fan points in non residential builsing except circuit moving finished in all types masonary as directed by department (Anchor Roma/GM/HAVELLS/FINOLEX)

400

-

218896

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and erection of approved make 6 Amps one modular SP switch with 6 Amps 6 pin mudular type plug socket mounted on metallic box covered with appropriate front plate as including all labour and material charges etc., complete for finished item of work.

100

-

25596

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and erection of approved make 16/ 6 Amps 6 pin socket with push button shuttered and illuminated to be mounted directly on box including all labour and material charges etc., complete for finished item of work.(Anchor Roma/GM)

75

-

24577.5

... More
SECUNDERABAD CIRCLE OFFICE;supplying and run of 2 of 28/0.3 mm(2.5 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for run of mains including all labour charges and materials chages etc. complete. (FINOLEX/HAVELS)

4000

-

298480

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and run of 2 of 65/0.3 mm(4.5 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for AC points including all labour charges and materials chages etc. complete. (FINOLEX/HAVELS)

360

-

40719.6

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of 8 way TPN vertical distribution board (STV-8W) with integral bus bar with flexable to accept any combination of MCBs with masonary work & suitable for single pole outgoing MCBs in sheet steel enclousers with 1 No 63 A 4 pole isolator and 24 Nos 6-32 amps single pole MCBs including connections and all labour charges concealed in wall by chiseling and masonaqry work etc complete.(Legrand /HAVELLS/L&T)

4

-

61168

... More
SECUNDERABAD CIRCLE OFFICE;Supply and erecting ofapproved make crom/bajaj make as directed by department 1x40W patty type fluorscent fitting made of CRCA sheet,completed with polyster filled 40W.choke,starter and side holders etc.complete with 40W tube all lobour charges etc complete (PHILIPS/CROMPTON)

75

-

54750

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of 2x36W CFL Cresent model, recessed mounted direct lighting luminaire with P5 lovers including lamps including cost and conveyance of all materials, all leads and lifts, all taxes and levies etc., complete for finished item of work as approved by the Engineer incharge.(Wipro / G.E./ Phillips / Thorn)

100

-

403500

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of batten holder/slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 11 to CF2 etc complete.(PHILIPS/CROMPTON)

60

-

7671

... More
SECUNDERABAD CIRCLE OFFICE;Supply and errection ceiling fan of selected colour and delux model high breeze with 3 blades and double ball bearing and with condenser AC 250 V 50 C/S of 48" 600 mm sweep completed erected in position with resistance type regulator, canopy down rod upto 304.8 mm in length is provided with hook/clamps nuts and bolts and 24/0.2 flexible copper wire etc., complete and pointed with lettering by enamel paint the Sr.No and date of erection including cost and conveyance of all labour charges (Almonard/CG/Khaitan/Bajaj) and as per the direction of Engineer in charge.

60

-

139920

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of Electronic Regulator of Modular of GM / Legrand Myrius / L & T / North West / Indo Simon / ABB /Schneider ZEN celo including cost and conveyance of all labour charges and as per the direction of Engineer in charge.

60

-

28176

... More
SECUNDERABAD CIRCLE OFFICE;Providing independent earthing for sophisticated equipment like computer, medical equipment electronic gadgets etc with 600X600X3.15mm thick copper plate rigidly fixed to the 40mm dia GI pipe 2.5m long pipe and 19mm dia B class GI pipe of .3 mts long connectd with reducer providing of stggred holes of 16 Nos of 12 mm dia to earth electrode, enclosed in in a CC chamber of (400X400X400) mm with suitable reinforced RCC slab cover duly filling with betonite powder and clay in (1:6) prop from bottom of pipe to bottom of CC chamber giving earth connection from the electrode throuh necessary GI strip of 25X6X200 mm length provided with suitable size o 14 Nos holes GI washers nuts and bolts and all labour charges etc complete.

4

-

13477.8

... More
SECUNDERABAD CIRCLE OFFICE;Run of earth lead No 6 Swg copper wire including cost of all accessories and labour charges etc complete

60

-

6259.2

... More
SECUNDERABAD CIRCLE OFFICE;Run of earth lead 25mmX4mm copper wire including cost of all accessories and labour charges etc complete.

150

-

75472.5

... More
SECUNDERABAD CIRCLE OFFICE;Supply and laying of LAN Cable cat - 6 UTP cable of Make: D Link / AMP / Molex / Legrand / Krone.

750

-

24832.5

... More
SECUNDERABAD CIRCLE OFFICE;Supply of Cat 6 RJ-45 information outlets including duel face plate of makes D Link / AMP / Molex / Legrand / Krone.

20

-

9054

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of 8 Port switches of D link / AMP / Krone / Legrand make including all operational, incidental and labour charges etc. complete for the finished item of work

20

-

24954

... More
SECUNDERABAD CIRCLE OFFICE;Supply & Fixing of 12" heavy duty exhaust fan with metal blades etc including all operational, incidental and labour charges etc. complete for the finished item of worK Makes : Crompton / Havells Ventilair-DB / Orient hill air.

10

-

33368.4

... More
SECUNDERABAD CIRCLE OFFICE;Supply and transporation of 1.5 ton split Air - Conditiner, fitted with Hermetically sealed compressor, operating on refrigerant R-22 /non - CFC high wall mounting confirming to is:1391 suitable for operation on 230 V ,50 HZ... single -phase A.C supply capable of performing cooling, Dehumidifying, Air circulating, filtering with cooling and consedring units ,with 5 mtr of required size of copper piping duly insulated and 3 core copper flexible xhord of required length etc. including all operational, incidental and labour charges etc. complete for the finished item of work. Make:Daikin / Blue Star / Hitachi

2

-

81288

... More
SECUNDERABAD CIRCLE OFFICE;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) a)15.90mm OD Pipe - SDR 11

200

-

35440

... More
SECUNDERABAD CIRCLE OFFICE;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) b) 22.20mm OD Pipe - SDR 11

150

-

31230

... More
SECUNDERABAD CIRCLE OFFICE;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) c) 28.60mm OD Pipe - SDR 11

200

-

48640

... More
SECUNDERABAD CIRCLE OFFICE;S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type a) 20 mm NB Size

6

-

1831.2

... More
SECUNDERABAD CIRCLE OFFICE;S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type b) 25 mm NB Size

6

-

2509.2

... More
SECUNDERABAD CIRCLE OFFICE;Supply and Fixing of 90 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar or any ISI Brand including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

75

-

25940.25

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

40

-

2800

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of 90 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

40

-

3760

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

30

-

6750

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

40

-

4440

... More
SECUNDERABAD CIRCLE OFFICE;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping

50

-

37640

... More
SECUNDERABAD CIRCLE OFFICE;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

5

-

37280

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of (152.4X101.6)mm SWG gully traps- ISI mark with CI grating and construction of brick masonary in CM 1:6 Prop iternediate chamber fitted with 12"X9" CI frame and hinged cover heavey type including cost and conveyance, labour charges of the work.

3

-

1934.4

... More
SECUNDERABAD CIRCLE OFFICE;Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: Coloured - Grade - I/ Grade - II

8

-

68588.8

... More
SECUNDERABAD CIRCLE OFFICE;Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm including cost and conveyance, labour charges etc complete.

10

-

15102

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including cost and conveyance, labour charges etc complete.

12

-

20263.2

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of best indian make plastic seat and lid for European water closets and buffers as per IS 2548-1963

12

-

9424.8

... More
SECUNDERABAD CIRCLE OFFICE;Supply and fixing of PV low level system parryware/slim line with internal component and short bend of 10 lits capacity with choice color

20

-

34336

... More
SECUNDERABAD CIRCLE OFFICE;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

18

-

26643.6

... More
SECUNDERABAD CIRCLE OFFICE;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make (HSW/Parry/Neycer) : 410 x 265 x 305 mm including cost and conveyance of all materials, labour charges etc complete for finished item of work.

9

-

7673.4

... More
SECUNDERABAD CIRCLE OFFICE;Suplying and fixing of angle stop cock 12.7mm dia fisrt quality indian make seiko or equivalent.

50

-

30260

... More
SECUNDERABAD CIRCLE OFFICE;S&F CP long body bibcock fancy type delux 300 grams dia 12.7mm indian make seiko or eqivalant.

40

-

119640

... More
SECUNDERABAD CIRCLE OFFICE;Suplying and fixing of 31.75mm PVC waste pipe for wash basin including cost and conveyance of all materials and labour charges et complete

22

-

572

... More
SECUNDERABAD CIRCLE OFFICE;Supplying and fixing of TV shape mirror with plastic size 609mmX 457.2 m

15

-

7806

... More
SECUNDERABAD CIRCLE OFFICE;S&F of 25.4mm dia & 609.6mm long aluminium anodized towel rod with brackets and aluminium screws.

15

-

1995

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing bib cock cum health faucet with 1 m long flexible tube and wall hook of Jaquar make queen series with 7 years warranty Chrome plated / Jupiter Aqua Lines-JAL or equivalent series

8

-

4600

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing pillar cock Jaquar make Queen series with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL or equivalent series

1

-

1038

... More
SECUNDERABAD CIRCLE OFFICE;Supply & fixing soap dish Jaquar make queen series: with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL or equivalent series

5

-

2620

... More
SECUNDERABAD CIRCLE OFFICE;Supply & Fixing of Towel ring Jaquar make Queen series with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL or equivalent series

1

-

570

... More
SECUNDERABAD CIRCLE OFFICE;S&F of poly vinyl acrylic board of approved quality including cost of all materials and labour charges complete for finished item.

6

-

10710

... More
SECUNDERABAD CIRCLE OFFICE;S&F of glow sign board with lettering of approved quality including cost of all materials and labour charges complete for finished item.

3

-

9855

... More
SECUNDERABAD CIRCLE OFFICE;providing of Structural and Architectural design for the building

15925

-

63700

... More
SECUNDERABAD CIRCLE OFFICE;Supplying installation, testing and commissioning of 10 passenger lift of Make : OTIS, SCHINDLER, MITSUBISHI, JOHNSON, KONE or equivalent make as approved by Engineer-In-Charge with following specifications having Number of Persons 12, Rated Load Number of stops 3, Number of Access sides 1, Floor designations G , 1 , 2 Drive System Alternating Current Voltage Frequency (ACVF),Type of controller Full Collective control - Simplex, Speed of travel 1.0 m/s,Car Size 1375 mm (W) x 1400 mm (D) x 2139 mm or applicable size (H),Door Width 800 mm,Door Height 2000 mm,Rated output motor 7.7 kw Car walls finish in Stainless Steel Hairline/as approved by Engineer- LED spot in ceilling,Car doors finish in Stainless Steel Hairline/as approved by Engineer, Car door in Stainless steel finish/as approved by Engineer,Granite Flooring/Wooden Floorin/Vinyl Flooring finish in Black Sea, Deco Ceiling finish in Stainless Steel,Hairline/as approved by Engineer,Full height mirror on rear car panel, Stylish,touch sensitive glass panel, Door open/close and alarm buttons, Visual call confirmation,Car Position Indicator,Pre-announcing arrows for collective,controls,16 Segment display, Fully Automatic Landing doors in Stainless steel Hairline finish, Door Opening Direction Center/Side Opening, Close loop control system,Self diagnostic control, 2 Hours Fire rated landing doors, Overload detection, Automatic evacuation to nearest floor (ARD), Light curtain on Car entrance,Alarm horn, Handrail in stainless steel finish on rear wall, Auto Fan Off, Auto Light Off, Intercom- 3Way Out of Service mode Fireman Control FIGS120 with Blet/Chain Drive.

1

-

1610000

... More
SECUNDERABAD CIRCLE OFFICE;Providing and fixing in true horizontal level 600 mm x 600 mm 15 mm thick Arm strong false ceiling system manufactured by M/s Arm strong world Industries using hot dipped Galvanised Steel section exposed surface with pre-coated capping, main Tee of size 24 x 27 mm at evry 1200 mm c/c maximum and rotary stiched cross tee of size 24 x 27 x mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 mm x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick per-straightened GI Wire laying fine fissured butt edge ceiling tiles of 15 mm thick mineral fiber Board manufactured by M/s Arm Strong World Industries Ltd., having RH 99% and for finished of size 600 x 600 mm including Cost & conveyance of all materials and labour charges such as cutting, fixing of standing of frame work exposing roof making complete for finished item of work

39.78

-

46742.69



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.