Telangana State Southern Power Distribution Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
242122Bid Award Id
ViewTender No
BID No.Chief General Manager/Master Plan /GH/TSSPDCL:04-B/2020-21Tender Authority
Telangana State Southern Power Distribution Company Limited ViewPurchaser Address
-Website
http://https://www.tssouthernpower.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Laying of 2nd cable in excavated trench
3150
-
286650
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Raise-DR 33KV 3x400sqmm UG Cb on support
50
-
12700
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : UG Cables Jointing : Straight through joints 33 KV 3 x 400 Sqmm XLPE Cable
35
-
166740
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : UG Cables Jointing : Outdoor / Indoor end termination33 KV 3 x 400 Sqmm XLPE Cable
10
-
23100
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Supply of 6" B class GI pipe
500
-
522000
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Supply of 250 mm Hume pipe of class NP3 with compresive strength of 35N/mm2 for 28 days curing,barewall thickness of 30mm,1.25kG linear/meter and withstanding capability of 22.50KN/linear meter as per IS 458-1993.
100
-
36300
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Loading 11/33 KV Straight through joint kits
35
-
280
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Un-loading 11/33 KV Straight through joint kits
35
-
140
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Load-11/33KV XLPE UG Cable for all sizes
22
-
22528
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Unload-11/33KV XLPE UG Cable all sizes
22
-
22528
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of Conductor drums
8
-
1616
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of Conductor drums
8
-
776
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Transport of Cond Drum,VCBs >10 & <20Km
30
-
97050
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of 12.5M SPUN POLE
25
-
13700
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of 12.5M SPUN POLE
25
-
9075
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Trans 11/12.5/12.9M Spun pole upto 50KM
25
-
21450
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex
23
-
101959
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Erect-33KV DP Structure with Spun Poles
1
-
8022.3
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;dismantegrated rock of size and circular canal to a depth and refilling it with earth after laying of cable (Previously 28.07.2020 - Excavation of earth in Hard murram)
17.33
-
20793.6
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of R.S. Joists 175 x 85 mm
7
-
532
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of R.S. Joists 175 x 85 mm
7
-
350
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of RSJoists150 x 150 mm/RailPole
4
-
704
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of RSJoists150 x150 mm/RailPol
4
-
428
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Erection of RS Joist 150 x 150 mmERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex
4
-
5628
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Erection of RS Joist 175 x 85 mm :ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex
7
-
7923.3
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;CIVIL WORKS : Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0')
11
-
4004
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement
45.76
-
236121.6
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;FABRICATION Fabrication of materials 1.53 mt. V.Cross arms with 100x50 mm MS Channel
300
-
45600
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;FABRICATION Fabrication of materials Back clamps with 75 x 8 mm MS Flat
300
-
9300
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Fix-Side/Cross Arm incl strut fr 33KV
300
-
145800
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side
3
-
40755
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Dismantling of 100 Sqmm conductor SC
3
-
19470
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of 33 KV Pin insulators
72
-
196.56
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of 33KV Metal parts-bag of 25no
5
-
325
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of 33 KV Metal parts-bagof 25
5
-
325
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of 33 KV AB SWCH Con 400/800 A
8
-
1008
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of 33 KV AB SWCH Con 400/800 A
8
-
632
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF EQUIPMENT Substations Erection of 33 KV AB Switch including alignment and earthing
8
-
16385.28
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of 33 KV VCBs&Panel boards
2
-
2048
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of 33 KV VCBs&Panel boards
2
-
2048
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Erection of 33kv VCB
2
-
10044
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
10.58
-
3503.3
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Laying PCC (1:3:6) using 40 mm HBG metal including cost and conveyance of all materials, placing, compacting, curing, all leads andlifts etc., complete for the finished item of work as directed by the Engineer-in-charge
7.8
-
40248
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16 mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work.
8.82
-
3289.86
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Erection of 33kv CT s
2
-
2158
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.
6
-
1344
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.,.M.S./ G.S. Flat 50x6mm / 50 x 8 mm ( Above ground)
125
-
5125
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of MS Channel,Angles,Flats&Rods
11.65
-
2574.65
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;UNLOADING of MS Channel,Angles,Flats&Rod
11.65
-
2155.25
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;S-CI Pipe earthing 100mm dia 2.75m long
7
-
24402
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.GI Flat 25 x 3 mm (including material)
50
-
3400
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;TRANSPORT Transport of steel including line materials such as cross arms, clamps, hardware, cable (loose) and other line materials.Above 20 KM and upto 30 KM
11.65
-
5440.55
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF EQUIPMENT Substations Erection of 33 KV LAS station type including earthing
3
-
2640
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Lay-4C/10C 2.5Sqmm Control Cable
400
-
5600
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Painting of RS Joist, Rail pole including cross arms, clamps with two coats of Al. paint including cost of paint and consumables."
11
-
7216
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Paving out conductor, providing temporary stays, tensioning, sagging correctly, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side to location. 11 KV lines : "100 Sqmm Conductor (6 Conductors) - DC"
4
-
81532
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Formation of Vertical Cut point for 33 KV line excluding pole erection and stays
16
-
50176
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;LOADING of 33 KV Pin insulators
72
-
196.56
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud
7
-
7700
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Previously 28.07.2020 - Excav. of pit in soils except hard rock
18.77
-
6476.34
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.
638
-
41470
... More
Erection of new 33 kV line to provide other Regular/alternate source to 33/11 KV Hakeempet SS;ERECTION OF LINES : Providing of RCC collar to existing earth pit.Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M he
7
-
2702
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements