Telangana State Power Generation Corporation Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Power Generation Corporation Limited - TSGENCO Tender

Works
Opening Date15 Feb 2025
Closing Date24 Feb 2025
Tender Amount₹ 1,93,803 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing additional room to the additional lubricants storage shed beside compressor house;Painting to the walls with 2 coats of emulsion paint exterior weather proof of approved brand and shade over a base coat of approved cement primer grade I making 3 coats in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. Complete for finished item of work as per standard specifications and as directed by the Engineer-in-charge

43

126

5418

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Plastering with CM (1:4) in 12 mm thick for walls including cost and conveyance of all materials and labour charges includes cost of curing etc., and Complete for finished item of work as directed by the Engineer-in-charge. (Cement will be issued by the department at free of cost).

75

139

10425

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Brick Masonry in CM (1:6) using cured FLY ASH BRICKS of size 225 mm 110 mmx75 mm and 75 kg/cm2 compressive strength including cost and conveyance of all materials, labour charges, curing and all leads & lifts etc. Complete for finished item of work for the following floors as directed by the Engineer-in-Charge at site. (Necessary cement will be issued by the department at free of cost).

7

5456

38192

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Painting with 1 coat of Red oxide paint and two coats of enamel paint after throughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. Complete for finished item of work as directed by the Engineer-in-charge.

35

179

6265

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Fabrication and Erection of Structural steel MS angles including cutting, hire charges of cutting machine, welding rods, labour charges, cutting pieces loading and unloading with sufficient crew and conveying the same to an averge lead of 2KM. Complete for finished item of work as directed by the Engineer-in-charge. (Structural steel will be issued by the department at free of cost)

0.65

31569

20519.85

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing steel bars and binding wire including conveyance of steel bars, all incidental, operational, labour charges such as cutting, bending, placing in position etc. Complete for finished item of work in all floors. (Reinforcement bars will be provided by the department at free of cost)

0.42

17279

7257.18

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing CC M20 grade nominal mix as per table 9 of IS-456 using graded aggregate of 12mm and 20mm nominal size HBG metal from approved quarry including cost and conveyance of all materials (other than cement) to site, including machine mixing, all labour, laying, curing, all operational & incidental charges, all leads & lifts etc. Complete for finished item of work. (Cement and Steel will be issued by Dept. at free of cost at Dept. stores.) For grade slab.

3

4022

12066

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing RCC M20 grade nominal mix as per table 9 of IS-456 using graded aggregate of 12mm and 20mm nominal size HBG metal from approved quarry including cost and conveyance of all materials (other than cement) to site, including machine mixing, all labour, laying, curing, all operational & incidental charges, all leads & lifts etc. Complete for finished item of work. (Cement and Steel will be issued by Dept. at free of cost at Dept. stores). For Columns.

1

10431

10431

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing RCC M20 grade nominal mix as per table 9 of IS-456 using graded aggregate of 12mm and 20mm nominal size HBG metal from approved quarry including cost and conveyance of all materials (other than cement) to site, including machine mixing,all labour, laying, curing, all operational & incidental charges, all leads & lifts etc. Complete for finished item of work. (Cement and Steel will be issued by Dept. at free of cost at Dept. stores). (C ) Plinth Beam

1

9855

9855

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing RCC M20 grade nominal mix as per table 9 of IS-456 using graded aggregate of 12mm and 20mm nominal size HBG metal from approved quarry including cost and conveyance of all materials (other than cement) to site, including machine mixing,all labour, laying, curing, all operational & incidental charges, all leads & lifts etc. Complete for finished item of work. (Cement and Steel will be issued by Dept. at free of cost at Dept. stores). (B) Pedestals

0.5

7650

3825

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Providing RCC M20 grade nominal mix as per table 9 of IS-456 using graded aggregate of 12mm and 20mm nominal size HBG metal from approved quarry including cost and conveyance of all materials (other than cement) to site, including machine mixing,all labour, laying, curing, all operational & incidental charges, all leads & lifts etc. Complete for finished item of work. (Cement and Steel will be issued by Dept. at free of cost at Dept. stores). (A) Footings

1.35

6999

9448.65

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Laying PCC (1:4:8) using 40mm size well graded HBG metal for leveling course in foundations including cost and conveyance of all the materials at site including seigniorage charges etc.,on materials mixing, placing, compacting, curing, all leads and lifts etc. Complete for finished item of work as directed by the Engineer in charge. (except cost of cement which will be issued by the Dept.at free of cost at Dept. Stores.)

1

3185

3185

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc. Complete for finished item of work as directed by the Engineer-in-Charge at site.

1

1154

1154

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Earthwork excavation for foundations by manual means including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Complete for finished item of work as directed by the Engineer-in-Charge at site.

10

251

2510

... More
Providing additional room to the additional lubricants storage shed beside compressor house;Dismantling the old damaged RCC floorings and disposal of unserviceable materials within 100 metres lead and dumping in low lying areas including all leads & lifts and labour charges etc., and complete for finished item work as directed by the Engineer-in-charge.

1

2981

2981



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.