Telangana State Education Women And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Education Women And Infrastructure Development Corporation Tender

Opening Date26 Nov 2020
Closing Date11 Dec 2020
Tender Amount₹ 2,80,86,512 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

222

-

7437

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) VRCC M20 design mix. 125mm thick slab

65

-

66199

... More
Building work;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for finished item of work for foundation and basement (APSS No. 601 & 615)

50

-

138568

... More
Building work;Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 402)

4.5

-

21316

... More
Building work;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)

9

-

28953

... More
Building work;Septic Tank: Earth work excavation and depositing on bank (Manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Septic tank soak pit and sump.(APSS No. 308)

222

-

37762

... More
Building work;Supply and fixing of Integral street light luminaire of 150W HPSV / MH lamp fitting comprises of single piece die cast Aluminium body with copper wound ballast and capacitor, Ignitor, with pot optics including 150W HPSV lamp etc, fixing on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all labour charges for mason work and giving connections etc., complete. Makes: Phillips / GE/ Bajaj / Crompton / Surya

10

-

43005

... More
Building work;Supply of the following PVC XLPE armoured cable 1100 V. Grade with ISI mark stranded / solid, aluminimum conductor complete. Make: Universal / Unicab / TORRENT/ Polycab /Havells / KEI 3.5 Core 50.00 Sq.mm.

150

-

51345

... More
Building work;Providing independent earthling by C450 excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete

3

-

8370

... More
Building work;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete

7

-

2837

... More
Building work;Supply of 18" (450mm) 900 R.P.M of heavy duty exhaust fan 250V A.C.50Hz.. 300mm size etc., complete. Makes: Crompton / Almounard / Havells Turbo Force.

1

-

4815

... More
Building work;Supply of 12" (300 mm) 900 R.P.M of heavy duty exhaust fan 250V A.C.50Hz.. 300mm size etc., complete. Makes: Crompton / Almounard / Havells Turbo Force.

6

-

18007

... More
Building work;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

135

-

19730

... More
Building work;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes :Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.

135

-

70389

... More
Building work;Supply of 48" (1200mm) 5 star rated Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator. with all standard accessories. Makes : Crompton / Bajaj / Orient

135

-

299936

... More
Building work;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

135

-

21936

... More
Building work;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 18 Watt CFL bulb Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

133

-

21890

... More
Building work;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

200

-

161070

... More
Building work;Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T

9

-

37304

... More
Building work;Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase ELCB / RCCB / FP Isolator as incomer and 12 Nos 10kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete. Make: Legrand / Schneider/Seimens/L&T

3

-

22593

... More
Building work;Supply and run of 2 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 2.50 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires :Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

50

-

9193

... More
Building work;Supply and run of 2 of 4 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 2.50 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection Makes of Wires :Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

150

-

20723

... More
Building work;Supply and run of 2 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 1.00 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

1000

-

88050

... More
Building work;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T

15

-

4938

... More
Building work;Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame GI switch box fixing on separate board including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard Makes of Switches : Legrand Myrius / Cabtree Verona / Million / Logus/ Gold Medal Curve / Anchor Roma viola / CPL / GreatWhite / Vimal / GM Four-Five / HPL / L&T / Salzar / Stanjo

10

-

8359

... More
Building work;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T/Salzar / Stanjo

75

-

17355

... More
Building work;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard. Makes of Switches : Legrand Myrius / Cabtree Verona / Million / Logus/ Gold Medal Curve / Anchor Roma viola / CPL / GreatWhite / Vimal / GM Four-Five / HPL / L&T / Salzar / Stanjo

500

-

249375

... More
Building work;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

200

-

15900

... More
Building work;Electrification: Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

1000

-

70700

... More
Building work;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

9000

-

66150

... More
Building work;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work. 15mm Nominal bore

20

-

3885

... More
Building work;Manufacture, supply & delivery of 32mm of outer dia HDPE pipes of 10Kg/Sqcm. conforming to IS 4984 - 1995 including transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including fixing required specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock requires blasting and refilling trenches after laying and jointing of pipes as per standard specifications including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.

100

-

8505

... More
Building work;Supply and Fixing of AC Cowls 88.9 mn dia with all necessary requirements including all operational , incidental sales and other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for finished item of work for all Floors.

9

-

614

... More
Building work;Supplying and fixing UPVC / SWR Nahani traps 4" or 101.6mm dia 1st quality ISI marked conforming to IS:1729-1979 with 4" dia SS Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

30

-

5324

... More
Building work;Supplying and fixing PPR ball valve of 25 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

10

-

2342

... More
Building work;Supplying and fixing PPR ball valve of 50 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

3

-

1751

... More
Building work;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

65

-

15288

... More
Building work;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 160mm dia double socket pipe

70

-

27930

... More
Building work;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia single socket pipe

50

-

4410

... More
Building work;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 90mm dia single socket pipe

100

-

14035

... More
Building work;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia single socket pipe

300

-

50295

... More
Building work;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 28.60mm OD pipe - SDR 13.5

350

-

71295

... More
Building work;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 41.30mm OD pipe - SDR 13.5

300

-

103635

... More
Building work;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 54.00mm OD pipe - SDR 13.5

150

-

75443

... More
Building work;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

3

-

9225

... More
Building work;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

3

-

11737

... More
Building work;Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.

25

-

41606

... More
Building work;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

10

-

77249

... More
Building work;Sanitary & Water supply: Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work

15

-

60354

... More
Building work;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors

180

-

102942

... More
Building work;Ornamental borders by providing 20 mm thick raised bands of 100 mm wide in plain cement mortor bands in CM(1:4) including cost and conveyence of all materials and labou charges for finished item of work.

178.5

-

8265

... More
Building work;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

16

-

1388

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

1.5

-

90878

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

618.5

-

111825

... More
Building work;Providing & Fixing of Open able Windows with Fly-mesh made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5 mm plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).

4.5

-

34524

... More
Building work;Supply and Fixing of Door with Single leaf shutter, Door Size 1.05x2.13 mtrs with Medium teak Wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 1 Nos, MS Powder coated Handels 150mm long 1 No, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 3 Nos, 250 mm long MS Powder coated Flat latch 1No, Door stoppers 1 Nos, MS Hold fasts 6Nos Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complte for finsihed item of work.

2

-

18068

... More
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

319.5

-

140213

... More
Building work;Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

263.5

-

44308

... More
Building work;Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

35.5

-

5969

... More
Building work;Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 402)

1.85

-

8763

... More
Building work;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

0.1

-

483

... More
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

56.5

-

379768

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Lintels

0.5

-

5334

... More
Building work;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

41

-

19172

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Slab 125mm thick

41

-

46383

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Beams

4

-

37553

... More
Building work;Third Floor: Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Columns

3

-

33335

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

21.5

-

1281357

... More
Building work;Supply and fixing of e-3 Ceramic magnetic Green Chalk Board of size 10'0''x4'0'' with viturious enamil coated sheet made up of 0.30 to 0.4mm thick steel sheet having 0.095 mm thick on top and 0.03mm min on the back supported with 9mm thick MDF board having bulk density of 750kg/m3 and laminated with 0.25 mm thick electro Galvanised steel sheet at the back both the top and backing sheet shall be properly fixed with MDF board using suiltable addhesive to avoid any moisture absorption. Fixed in deluxe quality alluminium channels confirming to ISI standards including cost transportaion and all labour charges for fixing etc complete for finshing item of work.

3

-

28611

... More
Building work;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

19.5

-

1692

... More
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

58

-

9112

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

846.5

-

153047

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

2350.5

-

310031

... More
Building work;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

208

-

141232

... More
Building work;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

58

-

44280

... More
Building work;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

24.5

-

55386

... More
Building work;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

90.5

-

28127

... More
Building work;Supply and fixing of MS Ventilator of size (0.60x0.45)mts made of with frame of equal angle of 25x25x5mm hor-2no, ver-2no welded with 10mm square rods hor-3no, ver-4no, MS hold fasts - 2no, red oxide primer grade - I quality one coat, sales & other taxes on all materials, all operational, incidental labour charges etc., complete for finished item of work.

19

-

11182

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.50x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 13nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

14

-

17738

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.20x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 10nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

10

-

10410

... More
Building work;Providing & Fixing of Open able Windows with Fly-mesh made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5 mm plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).

81

-

621432

... More
Building work;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

10

-

102630

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707)

10.5

-

7485

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:8), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707)

21

-

13286

... More
Building work;Providing skirting to internal walls 12.5 Cm high withPolished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

38.5

-

27447

... More
Building work;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)

558

-

359687

... More
Building work;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

703.5

-

309012

... More
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

846.5

-

343933

... More
Building work;Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

1518.5

-

237949

... More
Building work;Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

832

-

130374

... More
Building work;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

3.5

-

16521

... More
Building work;Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete but excluding seigniorage charges for finished item of work for steps

2

-

12120

... More
Building work;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509).

146.5

-

112190

... More
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

186

-

1182049

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For 25mm thick shelves

97.5

-

51300

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Sunshades

60

-

46059

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Lintels

5

-

51254

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Waist Slab 175mm thick

33

-

45850

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Slab 125mm thick

703.5

-

769418

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Beams

42

-

381026

... More
Building work;Second Floor: Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Columns

31

-

329817

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

21.5

-

1260137

... More
Building work;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

21

-

1822

... More
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

63.5

-

9976

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

838.5

-

151601

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

2385

-

314582

... More
Building work;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

208

-

139620

... More
Building work;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

58

-

42450

... More
Building work;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

24.5

-

55386

... More
Building work;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

90.5

-

28127

... More
Building work;Supply and fixing of MS Ventilator of size (0.60x0.45)mts made of with frame of equal angle of 25x25x5mm hor-2no, ver-2no welded with 10mm square rods hor-3no, ver-4no, MS hold fasts - 2no, red oxide primer grade - I quality one coat, sales & other taxes on all materials, all operational, incidental labour charges etc., complete for finished item of work.

19

-

11182

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.50x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 13nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

14

-

17738

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.20x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 10nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

11

-

11451

... More
Building work;Providing & Fixing of Open able Windows with Fly-mesh made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5 mm plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).

87.5

-

671300

... More
Building work;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

11

-

112893

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707)

10.5

-

7164

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:8), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707)

21

-

12746

... More
Building work;Providing skirting to internal walls 12.5 Cm high withPolished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

43

-

29339

... More
Building work;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)

562.5

-

348131

... More
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

838.5

-

313389

... More
Building work;Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

1542

-

224053

... More
Building work;Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

843

-

122488

... More
Building work;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

3.5

-

16150

... More
Building work;Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete but excluding seigniorage charges for finished item of work for steps

2

-

11908

... More
Building work;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509).

146.5

-

103869

... More
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

182

-

1089953

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For 25mm thick shelves

97.5

-

49135

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Sunshades

60

-

44211

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Lintels

5

-

49170

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Waist Slab 175mm thick

33

-

44334

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Slab 125mm thick

703.5

-

742966

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Beams

42

-

367744

... More
Building work;First Floor: Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Columns

31

-

315172

... More
Building work;Supply and fixing of Stainless steel railing to steps, portico portion, including cost and conveyance of all materials and fabrication of stainless steel railing by using stainless steel welding rods, including buffing, polishing,lacquer finishing to present seamless finish for finished item of work. 25mm dia

72

-

33826

... More
Building work;Supply and fixing of Stainless steel railing to steps, portico portion, including cost and conveyance of all materials and fabrication of stainless steel railing by using stainless steel welding rods, including buffing, polishing,lacquer finishing to present seamless finish for finished item of work. 50mm dia

56.5

-

54613

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

47.5

-

2737140

... More
Building work;Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801 using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm of any shade as approved by Engineer - In - Charge set over base coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed alredy laid or RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water and tiles etc.,and overheads & contractors profit complete for finished item of work.

28

-

18130

... More
Building work;Supply and fixing of e-3 Ceramic magnetic Green Chalk Board of size 10'0''x4'0'' with viturious enamil coated sheet made up of 0.30 to 0.4mm thick steel sheet having 0.095 mm thick on top and 0.03mm min on the back supported with 9mm thick MDF board having bulk density of 750kg/m3 and laminated with 0.25 mm thick electro Galvanised steel sheet at the back both the top and backing sheet shall be properly fixed with MDF board using suiltable addhesive to avoid any moisture absorption. Fixed in deluxe quality alluminium channels confirming to ISI standards including cost transportaion and all labour charges for fixing etc complete for finshing item of work.

7

-

66760

... More
Building work;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

14.5

-

1258

... More
Building work;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 with more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

11.5

-

9378

... More
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

81

-

12725

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

897.5

-

162268

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

2623

-

345974

... More
Building work;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

104.5

-

69331

... More
Building work;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

36

-

25214

... More
Building work;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

14

-

31649

... More
Building work;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

52.5

-

16317

... More
Building work;Supply and fixing of MS Ventilator of size (0.60x0.45)mts made of with frame of equal angle of 25x25x5mm hor-2no, ver-2no welded with 10mm square rods hor-3no, ver-4no, MS hold fasts - 2no, red oxide primer grade - I quality one coat, sales & other taxes on all materials, all operational, incidental labour charges etc., complete for finished item of work.

11

-

6474

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.50x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 13nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

6

-

7602

... More
Building work;Supplying and fixing of MS iron Ventilators of size 1.20x0.45mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 10nos and horizontals - 3nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

13

-

13533

... More
Building work;Providing & Fixing of Open able Windows with Fly-mesh made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5 mm plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).

75

-

575400

... More
Building work;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

14

-

143682

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707)

15

-

9775

... More
Building work;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:8), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707)

30

-

17438

... More
Building work;Providing skirting to internal walls 12.5 Cm high withPolished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

55

-

35844

... More
Building work;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)

665

-

394445

... More
Building work;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

23

-

8798

... More
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

897.5

-

306182

... More
Building work;Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

1690

-

226291

... More
Building work;Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat using including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

933

-

124929

... More
Building work;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

1

-

4508

... More
Building work;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509).

84.5

-

55111

... More
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

221

-

1242517

... More
Building work;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

965

-

245158

... More
Building work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

801

-

26834

... More
Building work;Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete but excluding seigniorage charges for finished item of work for steps

2

-

11696

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For 25mm thick Shelves

9

-

4335

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For 50mm thick Platforms

2

-

1228

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Sunshades

64

-

45184

... More
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) For Lintels

5

-

47087

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Waist Slab 175mm thick

33

-

42819

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Slab 125mm thick

747

-

760782

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Roof Beams

44

-

371338

... More
Building work;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for finished item of work for foundation and basement (APSS No. 601 & 615)

116.5

-

322862

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Plinth beams

40

-

408316

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Columns

54

-

523500

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Pedastals

13

-

110794

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Footings

159

-

1283146

... More
Building work;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)

86

-

276662

... More
Building work;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)

41

-

139708

... More
Building work;Ground Floor:- Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

801

-

238418



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.