Police Housing Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
144711Bid Award Id
ViewTender No
T150/2019-20Tender Authority
Police Housing Corporation Limited ViewPurchaser Address
-Website
http://http://www.tsphcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
SUPPLYING AND FIXING CHAIN LINK MESH 8 GAUGE-(4.00 MM) AS PER IS :2721-1979: 2"X2"(50MMX50MM)- 8 GAUGE INCLUDING GI WIRE LABOUR CHARGES COST AND CONVEYANCE OF ALL MATERIALS TO SITE ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK
2100
-
649
... More
PROVIDING MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, SCAFFOLDING CHARGES, LIFTING(MANUAL) , LABOUR CHARGES, SEINIORAGE CHARGES, , CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS OF 225MM THICK - GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
488
-
6632.4
... More
VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OFIS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE. METAL, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR COLUMNS (APSS NO.403)
114
-
11771.7
... More
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR(APSS NO:901&904)
5630
-
453.4
... More
VRCC M-20 NOMINAL MIX(CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FOOTINGS (APSS NO.403)
142
-
9695.5
... More
VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR PLINTH BEAMS (APSS NO.403)
69
-
12161
... More
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
32
-
66328.4
... More
PAINTING WITH EXTERIOR EMULSION PAINT OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,COMPLETE FOR FINISHED ITEM OF WORK APSS NO:908).
5030
-
218.2
... More
SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.S.ANGLES OF ALL SIZES
22000
-
97.4