Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date16 Nov 2020
Closing Date7 Dec 2020
Tender Amount₹ 4,96,36,132 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bandamailaram;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges excluding GST & Seignoriage Chargesetc., complete as per MORTH (5th Revision) specification 304.

4284

-

451276.56

... More
Bandamailaram;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and seigniorage charges of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for coping except GST & Seigniorage charges, as per MORTH specification 2100.

22

-

108174

... More
Bandamailaram;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 1000mm dia plain ended tongue and groove model pipe including cost and conveyance of pipe, etc, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert . excluding GST & Seignoriage Charges,

250

-

2099977.5

... More
Bandamailaram;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 600mm dia plain ended tongue and groove model pipe including cost and conveyance of pipe, etc, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert . excluding GST & Seignoriage Charges,

70

-

235216.1

... More
Bandamailaram;Flush pointing to RR Masonry in CM (1:3), including cost and conveyance of all materials to site, seigniorage charges, labour charges for all operations, curing, scaffolding etc., complete for finished item of work except GST & Seigniorage charges, as per MORTH Specification 1300 & 2200 (5th revision).

290

-

28492.5

... More
Bandamailaram;RR masonry in CM(1:3) prop. using hard granite stone from approved quarry including cost and conveyance of all materials to site, all labour charges for dressing stones to required size and shape, mixing of cement mortor, stone wall construction, curing, etc. complete for finished item of work, excluding GST & Seignoriage Charges, as per MORTH Specification 1400 & 2200 (5th revision)

242

-

1157500.52

... More
Bandamailaram;Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days, including all charges, hire & operational charges, all taxes except GST & Seigniorage charges as MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge.

142

-

584169.54

... More
Bandamailaram;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work excluding dewatering charges excluding GST & Seignoriage Chargesetc., complete as per MORTH (5th Revision) specification 304.

746

-

78583.64

... More
Bandamailaram;Providing and construction of rubble stone pitching including filling the joints with CM(1:6) over surface of slops prepared with useful excavated soils to requred levels and slopes using grainate rubble stone of not less then 40 kg and stone spalls of minimum 25mm size including cost and conveyance of all materials ramming curing all labour charges taxes all incidental and operational charges etc complete for finished item of work . Except GST & Seigniorage charges.

800

-

2090320

... More
Bandamailaram;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work,as per MORT&H (5th Revision) Spc.No.401. excluding GST & Seignoriage Charges

5550

-

2740978.5

... More
Bandamailaram;Providing and laying bituminous concrete of 40mm thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respectsexcluding GST,.and seigniorage charges

469.8

-

3227361.57

... More
Bandamailaram;Providing and applying Tack coat with Bitumen Emulsion rapid setting over the prepared surface before laying BC @2kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST

11745

-

96661.35

... More
Bandamailaram;Providing and laying dense graded bituminous macadam of 50mm thick with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (except GST & Seiniorage charges)

587.25

-

3643815.78

... More
Bandamailaram;Providing and applying Tack coat with Bitumen Emulsion rapid setting-1 over the prepared surface before laying DBM @2.5kg/10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformity with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, all taxes hire charges and operational charges of all T & P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification503. excluding GST

11745

-

115218.45

... More
Bandamailaram;Providing and applying Primer coat with bitumen emulsion(Bulk-Slow Setting-1) over the prepared surface of granular base as Wet Mix Macadam surface at the rate of 6kg /10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water,labour charges,cleaning,all taxes hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORT&H(5th Revision) specification 502.excluding GST ,

11745

-

474850.35

... More
Bandamailaram;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

2966

-

5460554.3

... More
Bandamailaram;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9,5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc,, complete for finished item of work as per MoRT&H (5th Revision) Specification 401.excluding GST & Seignoriage Charges

2600

-

4096092

... More
Bandamailaram;Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300mm laid in layers not exceeding 500mm thick including filling of surface voids with stone spalls, blinding top layers with granular material rolled with vibratory roller,all complete MORTH Specification clause 313 (5th Revision) including maintaining the required camber in the formation,labour charges for all operations and hire charges of equipment all water leads,cost of water, etc., complete but excluding the cost of rock fragments and granular material(payment will be made on level basis).excluding GST

820

-

60106

... More
Bandamailaram;Formation of embankment with good gravel obtained from outside and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P and , all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). excluding GST & Seignoriage Charges.

24000

-

12533040

... More
Bandamailaram;Conveyance of useful excavated rock fragments to site of embankment with a lead upto 1.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST.

250

-

8450

... More
Bandamailaram;Conveyance of useful excavated earth to site of embankment and Disposal of unuseful earth with a lead upto 1.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST.

840

-

29652

... More
Bandamailaram;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road as per technical speicfication MORTH Spec. 301. excluding GST

2700

-

526608

... More
Bandamailaram;Excavation in soil with Dozer including cutting in roadway and pushing of the earth to site of embankment upto a distance of 100 M, staking on road side as instructed by Engineer-in-Charge, including trimming bottom and side slopes in accordance with requirement of lines, grades and crosssections, including all hire and operational charges of T&P, all labour charges, complete for finished item of work, as per MORTH Spec No.301 (payment will be based on levels for finished item of work).excluding GST

800

-

86576



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.