Telangana State Dairy Development Cooperative Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Dairy Development Cooperative Federation Limited - TSDDCF Tender

Opening Date7 Apr 2021
Closing Date15 Apr 2021
Tender Amount₹ 15,11,354 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of new BMCU at Kalleda in Warangal District;S&F of PVC pipe 75mm Dia of followin dia with single socket including jointing with solution bends etc complete all incedental and operational charges etc complete

15

-

4437.3

... More
Construction of new BMCU at Kalleda in Warangal District;S&F in Position of 630.00x450 mm long white indian orissa pan of approved make with P&S trap including cost of foot rests of 250x125x15mm, boxing with bricks, dismantling of damaged orisssa pan and concreting with CC(1:2:4) prop to the floor and plasterings to floor after erection etc including c/c of all materials labour charges etc complete

2

-

3721.12

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing with CI tiles laid over a bed of 40mm thick CM(1:4) prop including cost and conveyance of all mateials labour charges etc complete

16

-

21204.96

... More
Construction of new BMCU at Kalleda in Warangal District;Collection, supply and spreading of gravel from approved quarry for subgrade with initial lead in layers consolidating each deposited layer by watering and ramming includig cost and conveyance of gravel, loading and unloading charges and spreading in low laying areas, hire charges etc complete

24

-

7306.56

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and spreading of 40mm metal in sludge drying bed with a thickness of 0.30m thick including cost and conveyance of material and labour charges for filling etc, complete.

36

-

58927.68

... More
Construction of new BMCU at Kalleda in Warangal District;Imperieus coat CM(1:5) of 20mm thick over roof of slab including cost of accoproof leakage powder with required slopes, including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work etc complete

29.25

-

12558.78

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing of 1No of 2HP Submersible pumpset of Texmo make with all accessories such as 1No of starter DOL with ammeter & voltmeter box, 1set of clampset,NRB and 1No of borewell cover with bolts and nuts other G.I fitting for pumpset including cost of GI bends, nuts, nippals, 1No of SS bush labour charges for erection of pumpset and all incidental and operational charges etc complete.

1

-

28000

... More
Construction of new BMCU at Kalleda in Warangal District;Providing 2.5mm thick 3core flat cable for providing electrical connection to the submersible pump of 3HP including cost and conveyance of all materials labour charges for connection and cost of cello tapes for binding the cable etc complete.as directed by the department.

130

-

14300

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and erection of 1 1/4" dia HDPE pipe for borewell including cost and conveyance of all labour charges for laying and jointing with solution etc complete.

120

-

30540

... More
Construction of new BMCU at Kalleda in Warangal District;Supplying and fixing of 180mm dia 6 kg/ cm2 PVC approved quality including transportation to site etc complete.

15

-

21000

... More
Construction of new BMCU at Kalleda in Warangal District;Drilling of borewell by down the hole hammer(DTH) drilling to finished dia of 163mm(6' 1/2") dia in all formations to the depth specified and reaming the bore to the required dia flushing the borewells at an average pressure of 7 kg/ cm2 (100 PSI) conducting yield test, inclusive of transportation, crew charges consumables, the borewells should be true and vertical and work should be carried out to the satisfaction of the department and carried out as per satisfication of the department and carried out as per IS_2800 part-I &II/ 1979 and amendments if any from time to time the rate is including all incidental and labour charges etc complete ( Rate as approved by S.E. EWS Hyderabad) For 2 No's Borewells in MPF Hyderabad. (90.00 to 180.00m)

50

-

16000

... More
Construction of new BMCU at Kalleda in Warangal District;Drilling of borewell by down the hole hammer(DTH) drilling to finished dia of 163mm(6' 1/2") dia in all formations to the depth specified and reaming the bore to the required dia flushing the borewells at an average pressure of 7 kg/ cm2 (100 PSI) conducting yield test, inclusive of transportation, crew charges consumables, the borewells should be true and vertical and work should be carried out to the satisfaction of the department and carried out as per satisfication of the department and carried out as per IS_2800 part-I &II/ 1979 and amendments if any from time to time the rate is including all incidental and labour charges etc complete ( Rate as approved by S.E. EWS Hyderabad) For 2 No's Borewells in MPF Hyderabad (0.00 to 90.00 m)

160

-

44800

... More
Construction of new BMCU at Kalleda in Warangal District;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4 mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work (SS 901, 903 & 904)

158

-

64261.76

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing of RCC rings for sump and leachpit including cost and conveyance of all materials labour charges and transportation of RCC rings ,labour charges for loading , unloading and fixing finishing with cement mortor etc,complete.

20

-

9000

... More
Construction of new BMCU at Kalleda in Warangal District;S&F of Taps and ball valves etc complete incluidng all labour charges and incidental and opertaional charges etc complete for work.

5

-

1000

... More
Construction of new BMCU at Kalleda in Warangal District;Hire charges of JCB for levelling and spreading of hilly soil for providing chain link mesh at & jungle cleaning, jincluding fuel charges hire charges for JCB and including all taxes and contractor CP & OH and except VAT and all incidental and operational charges etc., complete.

10

-

12000

... More
Construction of new BMCU at Kalleda in Warangal District;Providing Rcc hume pipes 225mm dia precasted Rcc hume pipe of NP2 including cost and conveyance of all materials labour charges for laying and jointing and testing etc complete with air tight cement joint etc complete

10

-

5662.6

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing 3/4"Ø CPVC heavy pipes including cost and conveyance of all materials, necessary specials, labour charges for fixing etc.

30

-

5552.4

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing 1"Ø CPVC heavy pipes including cost and conveyance of all materials, necessary specials, labour charges for fixing etc.

100

-

24615

... More
Construction of new BMCU at Kalleda in Warangal District;Proiding & placing on terrace ( at all floor levls polythethylene water storage tank with Double layer approved brand & making necessaary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

-

7950

... More
Construction of new BMCU at Kalleda in Warangal District;Painting two coats with Synthetic enamel paint over a base cost of primer of approved quality to give aqn even shade after thorougly brushing the surface to remove all dirt and remains of loose powdered materials including C & C of all materials, labour charges and incidental such as scaffolding, lift charges l and operational cahrges cost of gum brushes etc complete for the finished item of work but exclueing conveyance charges of materials for old wood work Sl.No. 193, pg 85 of ssd

140

-

22572.2

... More
Construction of new BMCU at Kalleda in Warangal District;Painting two caots with OIL BOUND WASHABLE DISTEMPER paint over a basae coat of primer of approved quality & shade to give an even shade after thorougly brushing the surface to remove all dirt and remains of loose powdered materials including C & C of all materials, labour charges and incidental such as scaffolding, lift charges l and operational cahrges cost of gum brushes etc complete for the finished item of work but exclueing conveyance charges of materials for old wood work Sl.No. 169 of ssd

129

-

13868.79

... More
Construction of new BMCU at Kalleda in Warangal District;Painting Two coats with base coat of ACE paint of approved quality & shade to give an even shade after thorougly brushing the surface to remove all dirt and remains of loose powdered materials including C & C of all materials, labour charges and incidental such as scaffolding, lift charges l and operational cahrges cost of gum brushes etc complete for the finished item of work but exclueing conveyance charges of materials for old wood work.(Three coats)

181

-

43421.9

... More
Construction of new BMCU at Kalleda in Warangal District;Manufacturing , supplying and fabrication and fixing of following MS structural steel pipes and sections etc at various heights and, various lengths including cost and conveyance of all materials fabrication charges and all including operational charges transportation and lift charges etc complete

2000

-

232260

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and providing SS fly proof mesh of 20 guage to the existing frame with a teak wooden reeper beeding icluding cost of nails c/cof all materials and labour charges etc complete

14.4

-

14008.75

... More
Construction of new BMCU at Kalleda in Warangal District;Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, down pipes, gutter etc, with 0.50 mm thick, width: 0.585, length: maximum 2.5 m

15

-

20300.85

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing of pre painted galvalume trapezoidal profile roofing sheet with 0.50mm thickness coating Alu zinc coated AZ150 GSMwith tensile strength :550 MPA. Paint coating refgular modified polyester painting painting thickness(top):18-20microns, (bottom) : 5-7 Microns, Sheet width:1.020, Length : Maximum 12 mts with regular range colours including nuts and bolts labour charges for fixing charges etc complete for the finished item of work

52

-

26345.28

... More
Construction of new BMCU at Kalleda in Warangal District;Supply and fixing in position aluminium anodised/Powder coatedTwo track Sliding windows of size 1.5x1.2m or any other size as per the drawings, using powder coated aluminium jindal sections,outer frame top and both vertical of 8774 of size 62x29.5 and bottom horizontaltwo track frame of 8773 of size 62x29.5mm ,shutter frame top,bottom and verticals of 8304 of size 50x20 interlocking frame of 8306 of size 50x20 with 5 mm thick clear acrylic sheet fixed with aluminium glased clips and rubber beadings including supply and fixing of nylon fly proof mesh sliding shutter made of aluminium poder coated sections of size 38.5x16x1.3mm with required number of bearings run in 31x10.5x1.2mm size aluminium Y channel,and providing 100mm aluminium handles for each shutter,SS rollers including cost and conveyance of all materials labour charges etc., complete. Sl.No10 pg 395 ssr 11-12

10.8

-

44249.33

... More
Construction of new BMCU at Kalleda in Warangal District;Supplying and fixing of standard rolling shutters made of 80 X 1.25mm thick machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mouonted on specially designed pipe shaft of 50 mm dia nominal bore MS B class pipe with brckets, plates guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn:1108

9

-

40287.87

... More
Construction of new BMCU at Kalleda in Warangal District;Flooring with polished shabad stone of 15-18mm thick set over base coat of CM(1:8) prop 20mm thick over already laid CC bed including neat cement slurry of honey like consistency sprad @ 3.3kg per sqm. and jointed with near cement to full depth including cost of all materials like cement, sand and water and floring stones, etccomplete, including seigniorage chargs, labour chages for dressing of flooring stones, etc., complete for finished item of work sl.no.99, pg 48 of ssd

58

-

27225.78

... More
Construction of new BMCU at Kalleda in Warangal District;Providing dadoing to walls with glazed plain coloured ceramic tiles 1st quantity of approved shade and quality with 5 to 7 mm of size approved by Engineer-in-charge set over base coat of CM (1:8) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.3 Kgs per Sqm and jointing woth white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc complete for finished item of work.

34

-

25502.38

... More
Construction of new BMCU at Kalleda in Warangal District;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:5) and top coat of 4 mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work (SS 901, 903 & 904)

171

-

72929.79

... More
Construction of new BMCU at Kalleda in Warangal District;supply, cutting, bending and fabrication of HYSD rods of approved make of any diameter at all heights including cost of binding wire including all incidental operational charges etc complete sl.no.5 of pg 392 of ssr11-12

2100

-

163275

... More
Construction of new BMCU at Kalleda in Warangal District;Fly ash Brick Masanry in CM (1:5) prop. Using CC bricks of any size of approved quality from approved quarry including cost and coveyence of all materials and labour charges racking the joints etc., complete.

28.3

-

143828.24

... More
Construction of new BMCU at Kalleda in Warangal District;CR masonry in CM(1:6) prop including cost of CR stones including all materials labour charges etc complete Sl.No.61, pg 37 of SSD

24.65

-

113063.39

... More
Construction of new BMCU at Kalleda in Warangal District;FILLING with good quality of gravel from approved quarry in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolicating each deposited layer by watering and ramming including cost and conveyance of wate to work ste and all operational, incidetal, labour ccharges, hire charges of T&P etc., complete for finished item of work (APSS-309&310)Sl.No.16, pg 18 of SSD

64

-

18393.6

... More
Construction of new BMCU at Kalleda in Warangal District;REFILLINGWITH EXCARATED EARTH(excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolicating each deposited layer by watering and ramming including cost and conveyance of wate to work ste and all operational, incidetal, labour ccharges, hire charges of T&P etc., complete for finished item of work (APSS-309&310)

49.6

-

1295.55

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for slab

3.1

-

33226.67

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for Roof beam

2.4

-

25924.15

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for Lintels

1

-

11677.26

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for Plinth beam

2.7

-

29302.72

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for Columns

3.5

-

40313.67

... More
Construction of new BMCU at Kalleda in Warangal District;M20 VRCC using 20 mm HBG Metal including cost and conveyance of all materials labour charges curing vibrating, machine mixing etc complete sl.30 pg 23 of ssd for footings

13

-

116585.43

... More
Construction of new BMCU at Kalleda in Warangal District;Plain Cement Concrete M7.5 (1:4:8) (cement: fine aggregate: coarse aggregate) for foundations and under flooring bed using coarse aggragate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including seigniorage charges, sales and other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work (APSS No. 402)

13.8

-

60460.15

... More
Construction of new BMCU at Kalleda in Warangal District;Earth work excavation for foundations (Manual means) for buildings in ordinary soils and depositind on bank for all lifts and with an initial lead of 10 m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc(APSS308)

132

-

22671



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.