Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Opening Date9 Oct 2023
Closing Date13 Oct 2023
Tender Amount₹ 16,49,875
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
479977Bid Award Id
ViewTender No
E1/02/15th FCG/Wnp/2023-24,Dt:07.10.2023.Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of LED Podium;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.
54
816
44079
... More
Construction of LED Podium;Bed Preparation: Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), including the cost of red earth, sand and labour charges and the cost of fertlizers, chemical and grass etc,. complete as per standard practice.
17.5
675
11825
... More
Construction of LED Podium;Bed Preparation: Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), including the cost of red earth, sand and labour charges and the cost of fertlizers, chemical and grass etc,. complete as per standard practice.
183.68
675
124114
... More
Construction of LED Podium;Syzizium bag size (13''x13)
50
150
7500
... More
Construction of LED Podium;Pendanus bag size (13''x13'')
100
150
15000
... More
Construction of LED Podium;Arecapalm bag size (13''x13'')
150
150
22500
... More
Construction of LED Podium;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.FSR no [page no 40 (371-V-(c))
300
155
46722
... More
Construction of LED Podium;Alternethra red bag size (7''x8'')
20
40
800
... More
Construction of LED Podium;Pisonia alba bag size (7''x8'')
50
40
2000
... More
Construction of LED Podium;Alternethra red bag size (7''x8'')
580
40
23200
... More
Construction of LED Podium;Achalifa red bag size (7''x8'')
580
40
23200
... More
Construction of LED Podium;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.FSR page no 39 (371-III(b))
58.7
907
53287
... More
Construction of LED Podium;Malphigea Dimond shape steps ms structure pot size (36''x24''x8'')
4
18000
72000
... More
Construction of LED Podium;Malphigea balls ms structure pot size (36''x24''x8'')
10
8000
80000
... More
Construction of LED Podium;Date Palm 10' to 12' of Bag size (40x40) Bag size
6
13500
81000
... More
Construction of LED Podium;Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
20
385
7713
... More
Construction of LED Podium;Supply and Delivery of SS LED Sign Letters (LoVE TELANGANA) With installation
9
64350
579150
... More
Construction of LED Podium;Cladding to External walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.
34.06
3771
128469
... More
Construction of LED Podium;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm
33.3
189
6314
... More
Construction of LED Podium;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
5.4
6845
36967
... More
Construction of LED Podium;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
5.62
4370
24583
... More
Construction of LED Podium;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix 1:3:6 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1
5223
5224
... More
Construction of LED Podium;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
10.8
270
2921
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements