Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation Tender

Opening Date11 Jun 2021
Closing Date18 Jun 2021
Tender Amount₹ 6,63,680 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of CC Drain in Div. No. 07;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)

456

-

80283.36

... More
Construction of CC Drain in Div. No. 07;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, 50% sand + 50% Rock sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.. RBR-FNDN-4

8.7

-

38010.07

... More
Construction of CC Drain in Div. No. 07;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.. RBR-FNDN-4

68.4

-

310720

... More
Construction of CC Drain in Div. No. 07;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, 50%sand + 50% Rock Sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

54.15

-

201570.67

... More
Construction of CC Drain in Div. No. 07;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

216.6

-

23005.09

... More
Construction of CC Drain in Div. No. 07;Cutting open C.C. road surface including stacking of excavated materials including all labour charges / Dismantling of CC Ramps

20.25

-

52386.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.