For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Opening Date17 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 15,63,225 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
civil work;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum.{50% natural river sand + 50% rock sand}

57.3

7883

451711.2

... More
civil work;Raised Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site including , labour charges on all materials, curing etc., Complete for finished item of work. {50% natural river sand + 50% rock sand}

310.5

129

40340.16

... More
civil work;Plain Cement Concrete (1:2:4) nominal mix using 20mm metal with hand mixing using 324kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges , hire charges of macinery , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges Etc., Complete for finished item of Work.1 Cum.

18.63

6089

113453.35

... More
civil work;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand}

79.11

4644

367413.74

... More
civil work;Plain Cement Concrete (1:5:10) using 40mm metal with hand mixing up to plinth level using 129.60kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing etc., complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}

8.77

4809

42163.06

... More
civil work;Supply and filling with Stone crusher Dust finer than 3mm with not more than 10% passing 0.075 sieve (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work

5.99

1108

6639.08

... More
civil work;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

51.91

293

15209.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.