Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
261098Tender No
18/39/Wet Mix,CC Road and CC Drain/ Div.No.33/ 2021, Dt. 09.08.2021Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://nizamabadcorporation.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of RCC Culvert and CC Road in Div. No. 33;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18 (From Prime Producers like TATA,SAIL,VSP, JINDAL as approved by Ministry of Steel Fe500/500D/550D)
360
-
24566.4
... More
Construction of RCC Culvert and CC Road in Div. No. 33;plastering 12mm thick single coat in CM(1:3) including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work.(SS 901,903 & 904) BLD-CSTN-6-1
184.12
-
32416.17
... More
Construction of RCC Culvert and CC Road in Div. No. 33;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, 50% sand + 50% Rock sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.. RBR-FNDN-4
3.3
-
14414.3
... More
Construction of RCC Culvert and CC Road in Div. No. 33;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, 50% sand + 50% Rock sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.. RBR-FNDN-4
30.2
-
137207.4
... More
Construction of RCC Culvert and CC Road in Div. No. 33;Plain Cement Concrete Nominal Mix (1:5:10) prop (Cement :Fine Aggregate: Coarse Aggregate) using 40mm size Hard Granie Machine Crushed metal including cost and conveaynce of all materails like cement(Using Ordinary Portland Cement of Grade 43/53), sand, coarse aggreagate water etc., to site, seigniorage charges on all materials, labour charges, for mixing, laying, concrete, ramming in 15cm layers, finishing to surface to the required level curing etc., complete for finished item of work
21.39
-
79623.21
... More
Construction of RCC Culvert and CC Road in Div. No. 33;V.C.C. grade M 30 Design Mix, using 20 mm Graded Metal corresponding to Table 9 of IS 456 using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate ((50%sand + 50% Rock Sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,(MORTH 12.8 G)
73.5
-
426031.73
... More
Construction of RCC Culvert and CC Road in Div. No. 33;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
49.5
-
93406.5
... More
Construction of RCC Culvert and CC Road in Div. No. 33;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
105.22
-
25293.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements