Military Engineer Services Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Military Engineer Services - MES Tender
Machinery and Tools
Electrical and Electronics
Eprocure
Opening Date18 Jan 2025
Closing Date8 Feb 2025
Tender Amount₹ 98,00,000
Costs
EMD
₹ 1,96,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_693779_1Tender No
8231Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
S&F FRLS PVC insulated 4core 6Sqmm, multistranded copper conductor cable, 1100Volts, ISI marked complete all as specified and directed.
300
-
-
... More
S&F FRLS PVC insulated 4core 4Sqmm, multistranded copper conductor cable, 1100Volts, ISI marked complete all as specified and directed
350
-
-
... More
S&F FRLS PVC insulated 4core 2.5Sqmm, multistranded copper conductor cable, 1100Volts, ISI marked complete all as specified and directed.
Make for item No1 to 6 Finolex, Havells, RPG/Gloster
450
-
-
... More
S&F Gear Coupling bush with nuts, bolts and spring washers for LT / CT / Hoist motor coupling of the existing sizes and model 02 to 15 Ton capacity cranes complete all as directed.
24
-
-
... More
S&F Gaer Coupling bush with nuts, bolts and spring washers for LT / CT / Hoist motor coupling of the existing sizes and model for 20 Ton to 30 Ton capacity crane complete all as directed.
20
-
-
... More
S&F Electro magnetic brake/Thruster brake with brake drum of any size complete all as specified and directed.
18
-
-
... More
S&F Brake liner for cranes of 2 to 10 Ton capacity complete all as directed.
12
-
-
... More
S&F Brake liner for cranes of 12 to 20 Ton capacity complete all as directed.
8
-
-
... More
S&F Brake liner for cranes of 25 to 50 Ton capacity complete all as directed.
12
-
-
... More
S&F Thruster break hydraulic oil/ Transformer Oil
Make: Electro/Servo/Power/Castrol
100
-
-
... More
S&F Gear box oil, grade 320. Make: Electro/Servo/Power/Castrol
200
-
-
... More
S&F the Over Load relay, 0 to 10Amp range, suitable for mounting on Contactor complete all as directed.
7
-
-
... More
S&F the Over Load relay, 12 to 16Amp range, suitable for mounting on Contactor complete all as directed. Make for item No 15 & 20 BCH/L&T/Siemens/C&S/ Schneider
8
-
-
... More
S&F Cadmium compound for wire rope complete all as directed.
120
-
-
... More
S&F Grease compound for wire rope complete all as directed.
80
-
-
... More
S&F, ML 2, 3 pole contactor with AC3 rating of 32Amps with suitable coil voltage complete all as specified and directed.
Make: L&T CAT No SS90701 or equivalent in Legrand / Siemens / BCH / Schneider
7
-
-
... More
S&F, ML 4, 3 pole contactor with AC3 rating of 70Amps with suitable coil voltage complete all as specified and directed.
Make: L&T CAT No SS90910 or equivalent in Legrand / Siemens / BCH / Schneider
6
-
-
... More
S&F, spare contact kit for ML2 contactor with suitable coil voltage complete all as specified and directed.
4
-
-
... More
S&F, spare contact kit ML3 & ML4 contactor with suitable coil voltage complete all as specified and directed.
3
-
-
... More
S&F, spare coil for ML2 contactor with suitable coil voltage complete all as specified and directed.
4
-
-
... More
S&F, spare coil for ML3 & ML4 contactor with standard coil voltage complete all as specified and directed.
Make for item No 22 to 23 BCH/L&T/Siemens/C&S/ Schneider
8
-
-
... More
S&F Limit Switch of any size for Long Travel/Cross Travel complete all as directed.
Make: SEIMENS/MACON CONTROLS/BCH
9
-
-
... More
S&F Flexible geared coupling of any size complete all as directed.
14
-
-
... More
S&F standard actuator type Push button switch of any colour complete all as specified and directed.
Make: L&T/C&S/BCH/Siemens
12
-
-
... More
S&F Pedestal with bearing for Long Frame/Cross Travel Shaft complete all as directed.
4
-
-
... More
Removing the burnt out control and power wiring from crane panel board and providing and fixing new wiring with suitable size copper conductor cable including replacement of damage/burnt out connectors, fuse holders, cable lugs, cables glands etc., complete all as specified and directed.
4
-
-
... More
Dismantling of Long travel assembly complete from all electrical connections, repairs to damaged long travel system by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reassembling the long travel assembly, reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 20/25 Ton EOT crane complete all as directed.
4
-
-
... More
Same as item No 30 above but for 15 to 30 Ton crane
3
-
-
... More
Dismantling of cross travel assembly complete from all electrical connections, repairs to damaged long travel system by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reassembling the long travel assembly, reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 2 to 10 Ton EOT crane
4
-
-
... More
Same as item No 32 above but for 15 to 30 Ton crane
2
-
-
... More
Dismantling of Main hoist assembly complete from all electrical connections, repairs to hoist by replacing with new gear and coupling, pedestal and modifying motor and gear box, platform by cutting, welding and reconnecting electrical connections, testing and commissioning of crane for smooth operation of long travel system for 2 to 10 Ton EOT crane
4
-
-
... More
Same as item No 34 above but for 15 to 30 Ton crane
3
-
-
... More
Disconnecting electrical connections removing the unserviceable burnt out Power drive of Cross Travel/Long Travel of 3/5/10/7.5/12 Ton capacity crane, S&F and fix new cross travel/long travel power Variable Frequency Drive of model Acs 380 series 1 HP, 0.75 KW make ABB OR equivalent in Siemens ,Yakhsawa, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed.
7
-
-
... More
All as per item No 36 above but for 20/25/30/50 Ton capacity crane power Variable Frequency Drive of model Acs 380 series 2 HP, 1.5 KW .
6
-
-
... More
Opening of electrical connection of 2/3/5 Ton capacity crane and removing of damaged Cross Travel/Long Travel electric drive and taking to authorized servicing agency of Siemens, opening of electrical drive and replacing the burnt out phase cards, power diodes, unserviceable parts i.e. capacitors, integrated circuits, resistors, electronic transformer and reassembling the complete electric drive and bringing back to site after repairing and refixing electrical drive, connecting electrical drive and commissioning complete all as directed
7
-
-
... More
All as per item No 38 above but for 7.5/10 Ton capacity crane
4
-
-
... More
All as per item No 38 above but for 12/15/20 Ton capacity crane
5
-
-
... More
All as per item No 38 above but for 25/30/50 Ton capacity crane
5
-
-
... More
Removing Induction motor of 1.5/2 HP capacity of cranes from foundation after opening foundation nut bolts, coupling and disconnecting, dismantling and taking down the Hoist/CT/LT motor from the installed position, opening of motor, servicing, greasing, insulating, varnishing and drying including replacement of damaged/worn out unserviceable bearings and refixing in the original position, connecting the electrical connections and testing complete all as directed. Make of Bearing: SKF/NBC/TATA
9
-
-
... More
All as per item No 42 above but for 3.5/7.5HP capacity motor
8
-
-
... More
All as per item No 42 above but for 8/10 HP capacity motor
8
-
-
... More
All as per item No. 42 above but for more than 10HP and upto 25HP capacity motor
6
-
-
... More
Dismantling of Long Travel gear box/Cross Travel/Hoist gear box of 20/25/30 Ton capacity cranes by opening long travel shaft and transporting to local workshop opening of gear box, replacement of broken damaged brass gears 06 No of different sizes, replacement of bearings 02 No, Oil-seal, 'O' Rings, Thrust washer, Retaining spring, Lock washers, Gasket and reassembling of gear box completely after repairing returning back to site, refixing in the original position, and testing for smooth functioning complete all directed.
3
-
-
... More
All as per item No 46 above but for 10/15 Ton capacity crane.
4
-
-
... More
All as per item No 46 above but for 2/3/5 Ton capacity crane.
5
-
-
... More
Dismantling of Thrust Brake and carrying out thorough cleaning of inner surfaces and it's motor, draining out of the brake oil from its chamber and storing the same in a container, cleaning the bearings, replacing the worn out bearings and filling back the brake oil, refixing the thrust brake assembly complete all as directed.
8
-
-
... More
S&F in repairs 160Amp HRC fuse DIN type carrier male female type with HRC fuses complete all as directed.
8
-
-
... More
All as per item No 50 above but 100Amp capacity.
40
-
-
... More
All as per item No 50 above but 63Amp capacity.
32
-
-
... More
All as per item No 50 above but 32Amp capacity.
Make for item No 50 to 53: Standard / L&T/ Havells / C&S / Schneider.
24
-
-
... More
Disconnecting electrical connections, cleaning each resistance box, removing the burnt out resistance and S&F and fix the new resistance in existing position with LT, CT and Hoist complete of cranes complete all as directed.
13
-
-
... More
Removing the unserviceable Step down transformer, S&F and fix new step down transformer 1.5 KVA, 440/220/110 Volts capacity complete all as per specified and directed.
6
-
-
... More
Conducting Load and Deflection test to EOT/HOT crane of 2/3/5 Ton capacity and submitting test report complete all as directed.
Notes: 1. Load for testing shall be provided/arranged by the contractor from out side under his own arrangement including necessary transportation and all other costs.
2. Crane testing shall be carried out by the authorized Inspector as per Factories ACT in the presence of user and safety officer.
67
-
-
... More
All as per item No 56 above but for 7.5/10/12 Ton capacity crane.
34
-
-
... More
All as per item No 56 above but for 15/20/25 Ton capacity crane.
21
-
-
... More
All as per item No 56 above but for 30/ 50 Ton capacity crane.
6
-
-
... More
S&F Carbon rubber bush for slip ring motor of the existing model and size complete all as directed.
16
-
-
... More
S&F Steel wire rope for main hoist of size 10mm complete as specified and directed
300
-
-
... More
S&F Steel wire rope for main hoist of size 12mm complete as specified and directed
280
-
-
... More
S&F Steel wire rope for main hoist of size 16mm complete as specified and directed
400
-
-
... More
S&F Steel wire rope for main hoist of size 20mm complete as specified and directed
250
-
-
... More
S&F Steel wire rope for main hoist of size 25mm complete as specified and directed
300
-
-
... More
Disconnecting electrical connections removing the unserviceable burnt out Power drive of Main Hoist of 2 To 7.5 Ton capacity crane, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (5 to 10HP, 3.5 to 7.5 KW) make ABB OR equivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed.
7
-
-
... More
Disconnecting electrical connections removing the unserviceable burnt out Power drive of Main Hoist of 10 To 20 Ton capacity crane, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (15 to 20 HP, 11 to 15 KW) make ABB OR equivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed.
5
-
-
... More
Disconnecting electrical connections removing the unserviceable burnt out Power drive of Main Hoist of 25 To 30 Ton capacity crane, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 380 series (25 to 30 HP, 18.5 to 22.5 KW) make ABB OR equivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed.
3
-
-
... More
Disconnecting electrical connections removing the unserviceable burnt out Power drive of Main Hoist of 50 Ton capacity crane, S&F and fix new Main Hoist Variable Frequency Drive of model Acs 880 series (50 HP, 30 KW) make ABB OR equivalent in Yasakawa, Siemens, L&T, CG, including programming by OEM Engineer and testing complete all as specified and directed.
1
-
-
... More
Dismantling the old cable track assembley and S & F new Cable track assembly for carnes at various capacityies including suitable support chain complete all as specified and directed.
2
-
-
... More
Dismantling the old DSL track assembley and S & F new DSL track assembly for carnes at various capacityies complete all as specified and directed.
3
-
-
... More
S&F in repairs, SV Highbay light to LED High bay light, energy saving, enviorment friendly & robust highbay LED with PDC housing suitable for ceiling ( Surface type/Suspended type) mouting with system efficacy upto 150 Im/watt, 120watt including necessary connection complete all as specified and directed.Note: Equipment and tools required for fitting of lights is arranged by contractor.
Make: Havells or equivalent in Crompton/C&S/ Philips
14
-
-
... More
Dismantling of cross trave/long travel/hoist assembly gear boxes/mechanical parts and reapairing of girders/wheels by fabrication work at workshop also do necessary wheel diagnosis requires at site for all capacity cranes all as directed and specified. Note: Cost of Dismantling , transportation, repairing, refixing at site and replacement of any unserviceable parts included in quoted rate.
5
-
-
... More
Outsourcing of services for periodical checking, normal and routine maintenance, repairs and replacement of spares of EOT/HOT cranes of any make, model and span of the under mentioned capacities of cranes by providing One Crane Mechanic and Two Crane Helper per shift of 08 Hours per day for one shift on all days except Sundays and Holidays all as specified and directed.
Rate Quoted shall be deemed to cater for following :-
(a) Man power to be employed.
(b) Two (Semi skilled) and two unskilled person for each one shift from timings are : 0900 hr to 1700 hr (c) Provision of all safety equirement such as safety belts, hang gloves, safety cloths/helment, safety rope and first aid boxes to be provided by the contractor including demand rate. Note : Rates to be quoted for complete job as per sub items below inclusive of all taxes, as applicable including GST.
11
-
-
... More
Notes:
The provision of T&P for operating, repair and maintenance are deemed to be included in the unit rates quoted.
-
-
-
... More
All stationary for Duty Roster, Gate pass books,Attendance register, Wages register, Log sheet book, maintenance record etc., shall be arranged, maintained and submitted by the contractor to Engineer in charge in the first week of every month.
-
-
-
... More
Any loss due to negligence, faulty operation shall be made good by the contractor without any extra cost to the department.
-
-
-
... More
Wage period shall not exceed one month. Wages for all workers employed shall be paid before 7th day of every month through bank account without fail irrespective of whether RAR is claimed or not.
-
-
-
... More
Minimum wages EPF, ESI, Bonus, etc., to the workers shall be paid by the contractor as per regional Labour/PF Commissioner, Gazette Notification including DA all as authorized.
-
-
-
... More
Labour elements for fixing of other spares/parts mentioned in this Schedule/BoQ as 'Supply only' shall be deemed to include in the unit rate quoted.
-
-
-
... More
Quoted rate shall deemed to include cost of personnel safety equipment such as shoes, safety belts and helmets during working for all the personnel employed.
-
-
-
... More
Contractor shall maintain daily log sheet and complaint book duly signed by the user for each crane all as specified and as directed by the Engineer in Charge.
-
-
-
... More
The complaints received from the users duly enclosed in the register with docket number and complaint slip has to be maintained with user signature after satisfactory attending the compliant as a token of completion indicating showing the spares replaced wherever applicable.
-
-
-
... More
The workers employed by the contractor for outsourcing shall be entitled for one day weekly off and the contractor has to provide suitable substitute in the concerned shifts. The unit rate quoted shall be deemed to include for this provision.
-
-
-
... More
Quoted rate Sl item 74 above shall be deemed to be inclusive of cost of taking down the old items being replaced, necessary cleaning, fixing, making connections, testing, commissioning etc., in respect of BoQ items.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%