Military Engineer Services Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Military Engineer Services - MES Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date29 Nov 2024
Closing Soon21 Dec 2024
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All as per item No. 1 above but for capacity above 1000 KVA and upto 1600 KVA

20

-

-

... More
Supply and replace LT bush rods with metal parts suitable for transformers of any make and of capacity upto 250 KVA all as specified and directed by Engineer-in-Charge.

6

-

-

... More
All as per item No.5 above but of capacity above 250 KVA and upto 500 KVA.

9

-

-

... More
All as per item No.5 above but of capacity above 500 KVA and upto 1000 KVA.

15

-

-

... More
All as per item No.5 above but of capacity above 1000 KVA and upto 1600 KVA.

9

-

-

... More
Supply replace HT bush rods with metal parts suitable for any make of transformers upto 250 KVA capacity all as specified and directed by Engineer-in-Charge

10

-

-

... More
All as per item No.9 above but of capacity above 250 KVA and upto 500 KVA.

5

-

-

... More
All as per item No.9 above but of capacity above 500 KVA and upto 1000 KVA.

15

-

-

... More
All as per item No.9 above but of capacity above 1000 KVA and upto 1600 KVA.

9

-

-

... More
Supply and replace set of top cover gasket for transformers of capacity upto 250 KVA all as specified and directed by Engineer-in-Charge.

3

-

-

... More
All as per item No.13 above but of capacity above 250 KVA and upto 500 KVA.

12

-

-

... More
All as per item No.13 above but of capacity above 500 KVA and upto 1000 KVA.

7

-

-

... More
All as per item No.13 above but of capacity above 1000 KVA and upto 1600 KVA.

7

-

-

... More
M&L, locating fault in 11 KV HT underground cable of any sizes with the help of fault locator vehicle organized from TSSPDCL/TSTRANSCO by injecting necessary high voltage to the faulty cable within 12 hours of time from time of reporting of fault all as directed by Engineer in Charge. Note : Quoted rate shall deemed to be included the necessary charges towards liaisoning for arranging fault locating vehicle, transportation of trained technicians and charges payable to Electricity Department.

5

-

-

... More
Disconnecting the electrical supply to 132 / 11 KV, 8 MVA transformer, conducting TAN delta and capacitance test EHV Bush by the authroised agency approved by Electrical Inspectorate of Telangana State Electricity Board and submitting the report in triplicate all as specified and directed.

15

-

-

... More
All as per item No. 18 above but for Current Transformer

15

-

-

... More
Supply and topping up transformer oil conforming to IS: 335 (1993), dielectric strength not less than 60 KV at 2.5 mm gap in various capacities distribution transformers installed at various indoor and outdoor sub stations complete all as specified and directed. Make: Power oil / SERVO / Castrol / Shell.

3300

-

-

... More
Dehydration of transformer oil of various capacities distribution transformers installed at various indoor and outdoor transformers with ultra high vaccum filtration machine to obtain the dielectric strength of 60 KV at 2.5 mm gap complete all as specified and directed.

20000

-

-

... More
Disconnecting the electric supply, removing the HT and LT cable connections of the defective Distribution transformer 11 / 440 V of 1000 KVA capacity, outdoor / indoor type any make, taking down from platform with the help of crane suitable for lifting upto 1000 KVA Transformer or using lifting jacks, loading into goods carrier with load capacity to load 1000 KVA Transformer and transporting the same carefully to workshop for necessary repairs, taking all necessary precautions to avoid possible damage during transit and returning the same after carrying out repairs and re-installation at the same location using crane, re-establishing connections on HV and LV sides complete all as directed. Note: Hire charge for crane and Trailer, charges for loading / unloading and transportation are deemed to be included in quoted rate. Any damage to the transformer by the contractor during dismantling, transporting and re-assembling of transformer shall be made good without any extra cost to government. Decision of Accepting Officer shall be final and binding.

1

-

-

... More
23. Opening top cover of 1000 KVA capacity transformer, opening of top cover and draining out the Transformer oil, removing the inspection cover, lifting the core with suitable crane and cleaning all healthy parts including coils, laminations, tank, tap changer including sleeves, drying of assembled core and winding in oven upto required IR values, re-assembly of transformer by tanking the dried core and winding assembly, fixing of all oil valves, fittings of accessories, making terminal connections to external bushings, including painting of transformer tank externally with two coats of enamel paint and internally with two coats oil resistant paint, complete Routine tests, replacing unserviceable LV / HV bushings, washers, oil seal, gaskets of inspection cover, radiators, HT Cable box, LT cable box with new ones if necessary complete all as specified and directed.

1

-

-

... More
Note : (i) HV / LV bush, copper insulation of LV / HV, transformer oil, LV / HV coils, oil seal gaskets of inspection cover, radiators, HT Cable box, LT cable box will be measured and paid separately as 'Supply Only' under relevant items. Labour elements for fixing of spares / parts mentioned as 'Supply only' is deemed to include in the unit rate quoted. (ii) Transportation to Workshop and return will be measured and paid separately.(iii) Testing of transformer as specified at Sl item No 38 of BoQ will be measured and paid separately. (iv) Any hardware and minor items like nuts, bolts, washers, petroleum jelly, grease, CTC required for complete job are deemed to included in the quoted rate. (v) Filtration of transformer oil at site after installation will be measured and paid separately but for carrying out Routine tests after repairs in workshop shall be deemed to included in quoted rate.

-

-

-

... More
(vi) All routine tests shall be carried out on Transformer in the presence of representative nominated by the Accepting Officer before dispatch of Transformer after carrying out repairs to the work site. (vii) Contractor shall submit 12 months guarantee for no oil leakage in transformer from certified date of commissioning of transformer and if any defects are noticed during this period the same shall be rectified free of cost. (viii) Painting, oven charges, labour for replacement of gasket, LT / HT bushes and breathers are measured and paid seperately

-

-

-

... More
Providing of new insulation paper for winding in place of damaged LV & HV coil

210

-

-

... More
Providing of new copper winding in place of damaged winding for HV

264

-

-

... More
Labour for HV copper winding insulation

264

-

-

... More
M&L for removal of active parts from tank, cleaning all healthy parts including coils, lamination, tank, tap changer including sleeves. Oven drying of assembled core and winding, re-assembliy of transformer by taking the dried core and winding assembly, fixing of all oil valves, fitting of accessories, making of terminal connections etc all as specified and directed by Engr-in-Charge

1

-

-

... More
M&L for replacement of LT / HT bushes, top gasket, breathers etc of transformer 1000 KVA capacity complete all as specified and directed by Engr-in-Charge

1

-

-

... More
M&L for preparation and cleaning the transformer of capacity 1000 KVA and painting of transformer tank externally with two coats of enamel paint and internally with two coats oil resistant paint complete all as specified and directed by Engr-in-Charge

1

-

-

... More
Disconnecting the electric supply, removing the HT and LT cable connections of the defective Distribution transformer 11 / 440 V of 750 KVA capacity, outdoor / indoor type any make, taking down from platform with the help of crane suitable for lifting upto 750 KVA Transformer or using lifting jacks, loading into goods carrier with load capacity to load 750 KVA Transformer and transporting the same carefully to workshop for necessary repairs, taking all necessary precautions to avoid possible damage during transit and returning the same after carrying out repairs and re-installation at the same location using crane, re-establishing connections on HV and LV sides complete all as directed. Note: Hire charge for crane and Trailer, charges for loading / unloading and transportation are deemed to be included in quoted rate. Any damage to the transformer by the contractor during dismantling, transporting and re-assembling of transformer shall be made good without any extra cost to government. Decision of Accepting Officer shall be final and binding.

1

-

-

... More
Opening top cover of 750 KVA capacity transformer, opening of top cover and draining out the Transformer oil, removing the inspection cover, lifting the core with suitable crane and cleaning all healthy parts including coils, laminations, tank, tap changer including sleeves, drying of assembled core and winding in oven upto required IR values, re-assembly of transformer by tanking the dried core and winding assembly, fixing of all oil valves, fittings of accessories, making terminal connections to external bushings, including painting of transformer tank externally with two coats of enamel paint and internally with two coats oil resistant paint, complete Routine tests, replacing unserviceable LV / HV bushings, washers, oil seal, gaskets of inspection cover, radiators, HT Cable box, LT cable box with new ones if necessary complete all as specified and directed.

1

-

-

... More
Note : (i) HV / LV bush, copper insulation of LV / HV, transformer oil, LV / HV coils, oil seal gaskets of inspection cover, radiators, HT Cable box, LT cable box will be measured and paid separately as 'Supply Only' under relevant items. Labour elements for fixing of spares / parts mentioned as 'Supply only' is deemed to include in the unit rate quoted. (ii) Transportation to Workshop and return will be measured and paid separately.(iii) Testing of transformer as specified at Sl item No 38 of BoQ will be measured and paid separately. (iv) Any hardware and minor items like nuts, bolts, washers, petroleum jelly, grease, CTC required for complete job are deemed to included in the quoted rate. (v) Filtration of transformer oil at site after installation will be measured and paid separately but for carrying out Routine tests after repairs in workshop shall be deemed to included in quoted rate.

-

-

-

... More
(vi) All routine tests shall be carried out on Transformer in the presence of representative nominated by the Accepting Officer before dispatch of Transformer after carrying out repairs to the work site. (vii) Contractor shall submit 12 months guarantee for no oil leakage in transformer from certified date of commissioning of transformer and if any defects are noticed during this period the same shall be rectified free of cost. (viii) Painting, oven charges, labour for replacement of gasket, LT / HT bushes and breathers are measured and paid seperately

-

-

-

... More
Providing of new insulation paper for winding in place of damaged LV & HV coil

170

-

-

... More
Providing of new copper winding in place of damaged winding for HV

220

-

-

... More
Labour for HV copper winding insulation

220

-

-

... More
M&L for removal of active parts from tank, cleaning all healthy parts including coils, lamination, tank, tap changer including sleeves. Oven drying of assembled core and winding, re-assembliy of transformer by taking the dried core and winding assembly, fixing of all oil valves, fitting of accessories, making of terminal connections etc all as specified and directed by Engr-in-Charge

1

-

-

... More
M&L for replacement of LT / HT bushes, top gasket, breathers etc of transformer 750 KVA capacity complete all as specified and directed by Engr-in-Charge

1

-

-

... More
M&L for preparation and cleaning the transformer of capacity 750 KVA and painting of transformer tank externally with two coats of enamel paint and internally with two coats oil resistant paint complete all as specified and directed by Engr-in-Charge

1

-

-

... More
M&L for conducting the following tests after repairs of transformers of 750 KVA & 1000 KVA including submitting the test report. (i) I.R values of HV to LV, HV to Earth and LV to Earth. (ii) winding resistance. (iii) Ratio test (iv) No-load test (v) Short circuit test (vi) Dielectric strength of oil (vii) Transfomer tap switch positions Note : contractor shall arrange all measuring instuments/equipment for testing of transformer.

2

-

-

... More
Supply, install, test and commissioning of neutral grounding register (NGR) of value 14.5 Ohms for one 8 MVA 132/11 KV power transformer

1

-

-

... More
Supply and fix in repairs of unserviceable Heater 80 watts in VCB panel at various Sub Stations / MRS

20

-

-

... More
Supply and fix in repairs of unserviceable Thermostat suitable for heaters in VCB panel at various Sub Stations / MRS

20

-

-

... More
Supply & Fix in repairs 11KV, 400 / 630 / 800 Amps HT VCB Vacuum Interrupter Bottles complete all as specified.

9

-

-

... More
Taking down the defective air breathers from the transformers, supply and fix new breathers with flange type 1/2 Kg bottle suitable for step down distribution transformers of any make and capacity ranging from 63 KVA to 160 KVA including filling of new silica gel in breathers complete all as specified and directed.

4

-

-

... More
Taking down the defective air breathers from the transformers, supply and fix new breathers with flange type 1 Kg bottle suitable for step down transformers of any make and capacity ranging from 315 KVA to 500 KVA including filling of new silica gel in breathers complete all as specified and directed.

5

-

-

... More
Taking down the defective air breathers from the transformers, supply and fix new breathers with flange type 2 Kg bottle suitable for step down distribution transformers of any make and capacity ranging from 630 KVA to 1500 KVA including filling of new silica gel in breathers complete all as specified and directed.

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.