Kakatiya University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Kakatiya University Tender

Opening Date10 Jul 2019
Closing Date24 Jul 2019
Tender Amount₹ 1,65,43,255 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling basement with good carted gravel from approved quarry in layers not exceeding 15cms consolidating each deposited layer by watering and ramming including cost and conveyance of gravel and water to work site and all operational, incidental labour charges and seigniorage charges etc. complete for finished item of work. ground floor

127

-

462

... More
Random Rubble stonme masonary, in CM (1:8) prop: (Cement Sand) using HBG stones from approved quarry including cost and conveyance of all materials like HBG stones, cement, sand water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement. Ground Floor

10

-

3800

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns footings for ground floor`

11

-

10116

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns pedastals for ground floor`

1

-

10692

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Plinth Beam for ground floor`

10

-

12632

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns for ground floor`

11

-

13080

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns for First Floor`

51

-

13762

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. ROOF BEAMS for Ground Floor

15

-

11809

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. ROOF BEAMS for First Floor

83

-

12278

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. ROOF SLAB 120MM Thick for Ground Floor

209

-

1382

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. ROOF SLAB 120MM Thick for First Floor

81

-

1436

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. ROOF SLAB 125mm Thick for First Floor

1308

-

1471

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Stair Cast Waist Slab 150mm Thick for First Floor

25

-

1644

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (Ground Floor)

3.25

-

13090

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (First Floor)

15

-

13678

... More
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (Second Floor)

0.5

-

14628

... More
RCC (1:1 ½: 3) nominal mix for chajja’s 0.60m wide with 7.50cms. thickness at fixed end and 5cm thick at free end with an average thickness of 6.25cm using 6mm to 20mm. S.S-5 gauge graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, course aggregate water to work site including cost of seigniorage charges on materials, cost of centering charges, shuttering, machine mixing concrete, laying concrete, lifting charges, finishing smooth plastering, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. Ground Floor

2.5

-

1033

... More
RCC (1:1 ½: 3) nominal mix for chajja’s 0.60m wide with 7.50cms. thickness at fixed end and 5cm thick at free end with an average thickness of 6.25cm using 6mm to 20mm. S.S-5 gauge graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, course aggregate water to work site including cost of seigniorage charges on materials, cost of centering charges, shuttering, machine mixing concrete, laying concrete, lifting charges, finishing smooth plastering, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. First Floor

86

-

1080

... More
RCC (1:1 ½: 3) nominal mix for chajja’s 0.60m wide with 7.50cms. thickness at fixed end and 5cm thick at free end with an average thickness of 6.25cm using 6mm to 20mm. S.S-5 gauge graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, course aggregate water to work site including cost of seigniorage charges on materials, cost of centering charges, shuttering, machine mixing concrete, laying concrete, lifting charges, finishing smooth plastering, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. Second Floor

1

-

1128

... More
Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 35 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. Ground Floor

32

-

6350

... More
Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 35 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. First Floor

98

-

6733

... More
Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 35 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. Second Floor

40

-

7115

... More
Reinforced Brick masonry in CM (1:4) prop. Using traditional second class bricks having crushing strength of 35 Kg/sq.cm and placing 2 nos. of 6 mm dia M.S. bars embedded in every third layer with free ends of reinforcement keyed to mortar joints of the main brick work where applicable including cost and conveyance of all materials like cement, sand bricks and water to work site cost of seigniorage charges on materials, and all operational incidental labour charges such as scaffolding, mixing mortar, constructing masonry wall, lift charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges, for 0.115m thick wall etc., complete for finished item of work. First floor

101

-

879

... More
Reinforced Brick masonry in CM (1:4) prop. Using traditional second class bricks having crushing strength of 35 Kg/sq.cm and placing 2 nos. of 6 mm dia M.S. bars embedded in every third layer with free ends of reinforcement keyed to mortar joints of the main brick work where applicable including cost and conveyance of all materials like cement, sand bricks and water to work site cost of seigniorage charges on materials, and all operational incidental labour charges such as scaffolding, mixing mortar, constructing masonry wall, lift charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges, for 0.115m thick wall etc., complete for finished item of work. Second floor

276

-

952

... More
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabit wire mesh & nominal reinforcement as directed by Engineer-in -charge with dubara sponge finishing, including cost & conveyance of all materials in site, seigniorage charges, sales & other taxes on all materials, operational & incidential, cost and conveyance of cement, wire mesh, water to work, lift charges etc., complete for finish items of work but excluding cost for steel & its fabrication charges, for finished item of work Ground Floor

56

-

1555

... More
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabit wire mesh & nominal reinforcement as directed by Engineer-in -charge with dubara sponge finishing, including cost & conveyance of all materials in site, seigniorage charges, sales & other taxes on all materials, operational & incidential, cost and conveyance of cement, wire mesh, water to work, lift charges etc., complete for finish items of work but excluding cost for steel & its fabrication charges, for finished item of work First Floor

66

-

1677

... More
Plain Cement Concrete (1:3:6) prop: using 20mm nominal size hard broken granite machine crushed metal brought from aproved quarry including cost and conveyance of materials and water to work site and all operational, incidental, labour charges such as centering, form work, machine mixing concrete, laying, lift charges, curing etc. complete for finished item of work. for bed blocks Ground Floor

0.5

-

6145

... More
Plain Cement Concrete (1:3:6) prop: using 20mm nominal size hard broken granite machine crushed metal brought from aproved quarry including cost and conveyance of materials and water to work site and all operational, incidental, labour charges such as centering, form work, machine mixing concrete, laying, lift charges, curing etc. complete for finished item of work. for bed blocks First Floor

6

-

6384

... More
Plain Cement Concrete (1:3:6) prop: using 20mm nominal size hard broken granite machine crushed metal brought from aproved quarry including cost and conveyance of materials and water to work site and all operational, incidental, labour charges such as centering, form work, machine mixing concrete, laying, lift charges, curing etc. complete for finished item of work. for bed blocks Second Floor

0.5

-

6622

... More
PCC (1:2:4) M15 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work

3

-

6685

... More
Supply and fixing of pre-cost of RCC frame or door of sectional area not less than 60 Sgm iin ready to assemble members with mortices tenon dove tailed joint members cost with controlled concrete controlled to M40 grade and having reinforcement not less than 120 Kgs/Cm of conrete including providing and fixing the required umbers of MS oxidized butt hinges, hold fast and other fittings for fixing sliding door bot tower botle and cleats etc by means of machinable plymer wonder blocks or MS galvanized plates complete as directed by department.and supplying and fixing of flush type door shutter 30mm thick solid core type not pressed bonded with water proof phenol format dehydroxe synthetic resin IS 2202(part-I) 1983 4mm thick paint grade commercial plywood on both sides with initial lipping including cost and conveyance of all materials including all taxes all labour charges for making fixing of door furniture in position as Directed by the department and fix the Jyothi make door fixtures to the shutters with 1 No, Aluminium aldrop 16X300mm, 1 No. Aluminium latches 300X16X9.5mm, 1 no. Aluminium Tower Bolts 12X300mm 2 Nos. Aluminium Door Handle 12X17X125 mm, 1No. Aluminium door stopper cup type, 1 no. door rubber solid bushed, 19X6mm sheet metal screws, 25X8mm, sheet metal screws, 50X8mm wood screws, 50X6mm machine screws including cost and conveyance all materials all operational incidental labour charges for fixing door fixtures and frame in to masonry etc. complete for finished item of work as Directed by the department DOOR SIZE: 1.20mt x 2.10mt . Ground Floor

1

-

9478

... More
Supply and fixing of pre-cost of RCC frame or door of sectional area not less than 60 Sgm iin ready to assemble members with mortices tenon dove tailed joint members cost with controlled concrete controlled to M40 grade and having reinforcement not less than 120 Kgs/Cm of conrete including providing and fixing the required umbers of MS oxidized butt hinges, hold fast and other fittings for fixing sliding door bot tower botle and cleats etc by means of machinable plymer wonder blocks or MS galvanized plates complete as directed by department.and supplying and fixing of flush type door shutter 30mm thick solid core type not pressed bonded with water proof phenol format dehydroxe synthetic resin IS 2202(part-I) 1983 4mm thick paint grade commercial plywood on both sides with initial lipping including cost and conveyance of all materials including all taxes all labour charges for making fixing of door furniture in position as Directed by the department and fix the Jyothi make door fixtures to the shutters with 1 No, Aluminium aldrop 16X300mm, 1 No. Aluminium latches 300X16X9.5mm, 1 no. Aluminium Tower Bolts 12X300mm 2 Nos. Aluminium Door Handle 12X17X125 mm, 1No. Aluminium door stopper cup type, 1 no. door rubber solid bushed, 19X6mm sheet metal screws, 25X8mm, sheet metal screws, 50X8mm wood screws, 50X6mm machine screws including cost and conveyance all materials all operational incidental labour charges for fixing door fixtures and frame in to masonry etc. complete for finished item of work as Directed by the department DOOR SIZE: 1.20mt x 2.10mt . First Floor

17

-

9478

... More
Supply and fixing of pre-cost of RCC frame or door of sectional area not less than 60 Sgm iin ready to assemble members with mortices tenon dove tailed joint members cost with controlled concrete controlled to M40 grade and having reinforcement not less than 120 Kgs/Cm of conrete including providing and fixing the required umbers of MS oxidized butt hinges, hold fast and other fittings for fixing sliding door bot tower botle and cleats etc by means of machinable plymer wonder blocks or MS galvanized plates complete as directed by department.and supplying and fixing of flush type door shutter 30mm thick solid core type not pressed bonded with water proof phenol format dehydroxe synthetic resin IS 2202(part-I) 1983 4mm thick paint grade commercial plywood on both sides with initial lipping including cost and conveyance of all materials including all taxes all labour charges for making fixing of door furniture in position as Directed by the department and fix the Jyothi make door fixtures to the shutters with 1 No, Aluminium aldrop 16X300mm, 1 No. Aluminium latches 300X16X9.5mm, 1 no. Aluminium Tower Bolts 12X300mm 2 Nos. Aluminium Door Handle 12X17X125 mm, 1No. Aluminium door stopper cup type, 1 no. door rubber solid bushed, 19X6mm sheet metal screws, 25X8mm, sheet metal screws, 50X8mm wood screws, 50X6mm machine screws including cost and conveyance all materials all operational incidental labour charges for fixing door fixtures and frame in to masonry etc. complete for finished item of work as Directed by the department DOOR SIZE: 1.05mt x 2.10mt . Second Floor

1

-

7604

... More
Supply and fixing of pre-cast RCC frame fixed with PVC Door shutter made of rigid PVC extruded hollow section (Nandi or equivalent) of 20mm x 200mm with the wall thickness of 1.0mm+-0.1mm equally divided into 4 no's with tongue and groove locking arangements. The shutter frame is made of 30mm x 79mm with the wall thickness of 1.5mm +/-0.15mm section miter-cut and joined at 4 corners with 125mm xreinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutter during the fabrication of the door shutter at those points wherever the hardware is fixed onto the door shutter including fixing Jyothi make door fixtures Al. Aldrops 200x16mm - 1No., Al. Handles 100x12x7 - 1No., Al. Latch 250x16x9.50mm 1 No. etc., door size 0.75x2.1 mtrs. First floor.

4

-

5742

... More
Supply and fixing of pre-cost of RCC frame or door of sectional area not less than 60 Sgm iin ready to assemble members with mortices tenon dove tailed joint members cost with controlled concrete controlled to M40 grade and having reinforcement not less than 120 Kgs/Cm of conrete including providing and fixing the required umbers of MS oxidized butt hinges, hold fast and other fittings for fixing sliding door bot tower botle and cleats etc by means of machinable plymer wonder blocks or MS galvanized plates complete as directed by department.and supplying and fixing of flush type door shutter 30mm thick solid core type not pressed bonded with water proof phenol format dehydroxe synthetic resin IS 2202(part-I) 1983 4mm thick paint grade commercial plywood on both sides with initial lipping including cost and conveyance of all materials including all taxes all labour charges for making fixing of door furniture in position as Directed by the department and fix the Jyothi make door fixtures to the shutters with 1 No, Aluminium aldrop 16X300mm, 1 No. Aluminium latches 300X16X9.5mm, 1 no. Aluminium Tower Bolts 12X300mm 2 Nos. Aluminium Door Handle 12X17X125 mm, 1No. Aluminium door stopper cup type, 1 no. door rubber solid bushed, 19X6mm sheet metal screws, 25X8mm, sheet metal screws, 50X8mm wood screws, 50X6mm machine screws including cost and conveyance all materials all operational incidental labour charges for fixing door fixtures and frame in to masonry etc. complete for finished item of work as Directed by the department DOOR SIZE: 0.90mt x 2.10mt . First Floor

2

-

7549

... More
Fabrication, Supplying and fixing of M.S. Box section Glazed wondow using 14 guage (55x35x3mm section) from and 'Z' angle shutter using T section supports for shutter including providing security bars using 12mmx12mm square bars at 15 Cms with heavy duty peg stays, galvamzed handles painted with steel priper of approved make and all fixes painted with steel priper of approved make and all fixes like 'Z' angle hold farts 4 Nos. Box type higer 4 Nos. etc including fixing of 4mm thick plain glass panch using shalimar brand glazed putty confirming to ISI specification glass fixing of pins including cost and conveyence of all operational incidental, Red oxide paint and all labour charges etc complete for finished item of work as directed by the departmental officer. as per SS 1608. Ground Floor

8

-

3598

... More
Fabrication, Supplying and fixing of M.S. Box section Glazed wondow using 14 guage (55x35x3mm section) from and 'Z' angle shutter using T section supports for shutter including providing security bars using 12mmx12mm square bars at 15 Cms with heavy duty peg stays, galvamzed handles painted with steel priper of approved make and all fixes painted with steel priper of approved make and all fixes like 'Z' angle hold farts 4 Nos. Box type higer 4 Nos. etc including fixing of 4mm thick plain glass panch using shalimar brand glazed putty confirming to ISI specification glass fixing of pins including cost and conveyence of all operational incidental, Red oxide paint and all labour charges etc complete for finished item of work as directed by the departmental officer. as per SS 1608. First Floor

135

-

3598

... More
Fabrication, Supply and fixing of MS Ventilators made out of "Z" Angular iron frame F4-b section as per ISI Standard and using standard rolled steel sections providing security bars 12mm x 12mm square bars at 10cm center to center horizentally welded and 4mm thick plain glass fixed using shalimar putty etc such as hinges, handles, stays etc welded to the frame including once coat of red oxide primer including all labour charges etc complete. Ground Floor

0.55

-

5068

... More
Fabrication, Supply and fixing of MS Ventilators made out of "Z" Angular iron frame F4-b section as per ISI Standard and using standard rolled steel sections providing security bars 12mm x 12mm square bars at 10cm center to center horizentally welded and 4mm thick plain glass fixed using shalimar putty etc such as hinges, handles, stays etc welded to the frame including once coat of red oxide primer including all labour charges etc complete. First Floor

14

-

5068

... More
Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground Floor.

289

-

442

... More
Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First Floor.

3710

-

484

... More
Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Second Floor.

686

-

526

... More
Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground Floor

178

-

471

... More
Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First Floor

1720

-

513

... More
Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Second Floor

110

-

555

... More
Painting to new walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of appropriate cement primer of approved brand, making three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour chargers etc., Complete for finished item of work in all floors for internal walls. Ground floor`

136

-

124

... More
Painting to new walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of appropriate cement primer of approved brand, making three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour chargers etc., Complete for finished item of work in all floors for internal walls.First floor`

3063

-

124

... More
Painting to new walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of appropriate cement primer of approved brand, making three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour chargers etc., Complete for finished item of work in all floors for internal walls. Second floor`

60

-

124

... More
Painting with acrylic emulsion paint with 2 coats of ready mixed weather proof exterior emuslion paint of approved with 3 coats of approved make shade and colour including self prime coat of brand to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose provided material including all taxes cost and conveyance of all material and labour charges etc complete for finished item of work.Ground Floor

331

-

195

... More
Painting with acrylic emulsion paint with 2 coats of ready mixed weather proof exterior emuslion paint of approved with 3 coats of approved make shade and colour including self prime coat of brand to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose provided material including all taxes cost and conveyance of all material and labour charges etc complete for finished item of work.First Floor

1838

-

195

... More
Painting with acrylic emulsion paint with 2 coats of ready mixed weather proof exterior emuslion paint of approved with 3 coats of approved make shade and colour including self prime coat of brand to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose provided material including all taxes cost and conveyance of all material and labour charges etc complete for finished item of work. Second Floor

736

-

195

... More
Dadooing with first quality coloured glazed tiles of approved brand colour over 12mm thick base coat in CM (1:5) prop. and neat grey cement slurry of honey like consistency spread at the rate of 3.3 Kg of cement per sq.m. and jointed with neat white cement paste mixed with pigment of matching shade including the cost and conveyance of all materials like cement, sand, water, glazed tiles etc., to site and cost of seigniorage charges on materials and all operational, incidental labour charges such as mixing mortar, laying, lift charges, curing, fixing tiles in position and including all taxes etc., complete for finished item of work.First Floor

63

-

795

... More
Providing and applying synthetic plaster putty or equivalent putty such as Birla Wall Care Putty or texture paint or equivalent such as CL/Sai coat texture paint of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emry paper, sand the surface, clean & wipe off loose dust, applying putty/texture paint filler by putty knife/muslim pad, air dry for 2-3 hrs for the surface preparation including cost and conveyance of all materials to worksite and all operational, incidental, labour charges etc complete for finished item of work for Internal Walls. First floor

671

-

247

... More
Flooring with polished Vitrified tiles 600mm x 600mm of 8mm to 10mm thick premium colour of 1st quality of any shade set over base coat of cement mortar (1:8) Prop. 12mm thick over C.C bed already laid or RCC Roff slab including neat cement slurry of honey like consistency spread at 3.3 Kg/Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materails like cement, sand water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. Ground Floor

17

-

1706

... More
Flooring with polished Vitrified tiles 600mm x 600mm of 8mm to 10mm thick premium colour of 1st quality of any shade set over base coat of cement mortar (1:8) Prop. 12mm thick over C.C bed already laid or RCC Roff slab including neat cement slurry of honey like consistency spread at 3.3 Kg/Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materails like cement, sand water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. First Floor

633

-

1747

... More
Flooring with coloured ceramic tiles 1st quality of approved brand and shade laid over a flooring bed set over base coat of 12 mm thick in CM (1:8) prop. and neat grey cement of honey like consistency spread at the rate of 3.3 Kg of cement/sq.m and jointed with neat white cement paste mixed with pigment of matching shade including the cost and conveyance of all materials like cement, sand, water, ceramic tiles etc., to site and cost of seigniorage charges on material and all operational, incidental and labour charges such as mixing mortar, laying lift charges curing, fixing tiles in position and including all taxes etc., complete but excluding cost of CC bed for finished item of work.Ground Floor

19

-

1043

... More
Flooring with coloured ceramic tiles 1st quality of approved brand and shade laid over a flooring bed set over base coat of 12 mm thick in CM (1:8) prop. and neat grey cement of honey like consistency spread at the rate of 3.3 Kg of cement/sq.m and jointed with neat white cement paste mixed with pigment of matching shade including the cost and conveyance of all materials like cement, sand, water, ceramic tiles etc., to site and cost of seigniorage charges on material and all operational, incidental and labour charges such as mixing mortar, laying lift charges curing, fixing tiles in position and including all taxes etc., complete but excluding cost of CC bed for finished item of work.First Floor

33

-

1084

... More
Providing skirting to inernal walls to 10cm height with Vitrified tiles length equal to flooring tiles, set over base coat of CM (1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30Kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work. Ground Floor

1

-

1729

... More
Providing skirting to inernal walls to 10cm height with Vitrified tiles length equal to flooring tiles, set over base coat of CM (1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30Kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work. First Floor

45

-

1770

... More
Applying of Door putty with approved brand putty with mirror shade including cost & conveyanc eof all materials, labour charges etc., complete - Ground Floor

5.5

-

446

... More
Applying of Door putty with approved brand putty with mirror shade including cost & conveyanc eof all materials, labour charges etc., complete - First Floor

100

-

446

... More
Painting two coats to new wood work with best synthetic enamel paint 1st grade of approved make and shade over a base coat of approved brnd wood primer making three coats in all including cost and conveyance of all materials to site cost of brushes & all labour charges etc. complete as directed by the Departmental officers Ground Floor

5.5

-

212

... More
Painting two coats to new wood work with best synthetic enamel paint 1st grade of approved make and shade over a base coat of approved brnd wood primer making three coats in all including cost and conveyance of all materials to site cost of brushes & all labour charges etc. complete as directed by the Departmental officers First Floor

100

-

212

... More
Painting two coats to new iron work with best synthetic enamel paint 1st grade of approved make and shade including cost and conveyance of all materials to site cost of brushes & all labour charges etc. complete as directed by the departmental officers Ground Floor

17

-

106

... More
Painting two coats to new iron work with best synthetic enamel paint 1st grade of approved make and shade including cost and conveyance of all materials to site cost of brushes & all labour charges etc. complete as directed by the departmental officers First Floor

282

-

106

... More
Painting two coats to new iron work with best synthetic enamel paint 1st grade of approved make and shade including cost and conveyance of all materials to site cost of brushes & all labour charges etc. complete as directed by the departmental officers Second Floor

7

-

106

... More
Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure thick including cost of necessary PVC bends, shoes and MS clamps and all other accessories and fixing in position including cost and conveyance of all materials to site seigniorage charges sales and other taxes on all materials, all operational, incidental and labour charges such as fixing in alignment etc., complete for finished item of work. First floor

145

-

677

... More
Providing and Fixing of 24 guage alluminium sheet over expansion joint groove of width 15cm fixed to walls / columns at one edge and resting over the other block walls / columns concealing expansion joint with slotted holes for free edge of aluminium sheet to facilitate free movement of aluminium sheet over the finished surface of expansion joint and wall face using sheet metal screws with nylon receiver complete including cost and conveyance of all maerial to site, all incidental, operational labour charges etc, complete for finished item of work as per approved drawing (for all floors for vertical joints and bottom of slab).

5

-

457

... More
Dismantling of Brick Masonary in cement mortar carefully stacking the materials useful for reuse including all operational, incidental, labour charges etc., complete for finished item of work First Floor

80

-

247

... More
Dismantling of RCC Roof Slab carefully stacking the materials useful for reuse including all operational, incidental, labour charges etc., complete for finished item of work First Floor

1

-

2607

... More
Supply & Fixing of of 16mm to 20mm thick polished marble stone urinal partition of dongari, adanga vareity including cost and conveyance of all material, all operational, all labour charges etc complete.

2

-

1043

... More
Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). Ground floor

18

-

69325

... More
Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). First floor

46.5

-

70596

... More
Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). Second floor

0.1

-

71867

... More
Painting to old walls with one coat single of ACE exterior emulsion with approved colour shade to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials. Cost of brushes, water to site, etc. sles & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc. complete for finished item of work. as directed by the department. (External Walls) Ground Floor

935

-

132

... More
Painting to old Iron work with one coat of synthetic enamel paint 1st grade of approved shades to give an even shade after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc. complete for finished item of work. as directed by the department.Ground Floor

178

-

62

... More
Painting one coat to (Old Wood) work with best synthetic enamel paint 1st grade of approved shades to give an even shade after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc. complete for finished item of work. as directed by the department.Ground Floor

101

-

67

... More
Providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of two coats of high performance Acrylic polymer modified Elastomeric cementitious water proof coating (1.8 Sq.Mtr./Kg/Each coat).

33

-

460

... More
Supply & Fixing of 25.40mm thick mastic pad including cost and conveyance of all material and labour charges etc complete for finished item of work

6

-

1169

... More
Providing and fixing flooring full depth jointing and pointing to the vitrified / ceramic tiles floor in specified thick for tiles of any size with cement based adhesive in width of 3.50mm with nylan spacers excluding cost of tiles etc complete.

664

-

30

... More
Flooring with polished shahabad/ tandur stones slabs of 15 to 18 mm thick of size (0.457x0.457 m) or any other size set over base coat of CM (1:8) over already laid CC bed / RCC Roof slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work. Ground floor

120

-

655

... More
Flooring with polished shahabad/ tandur stones slabs of 15 to 18 mm thick of size (0.457x0.457 m) or any other size set over base coat of CM (1:8) over already laid CC bed / RCC Roof slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work. First floor

643

-

688

... More
Providing skirting to inernal walls to 10cm height with Polished Shabad Stones length equal to flooring stones, set over base coat of CM (1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30Kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work. Ground Floor

19

-

758

... More
Providing skirting to inernal walls to 10cm height with Polished Shabad Stones length equal to flooring stones, set over base coat of CM (1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30Kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work. First Floor

15

-

798

... More
Supply & Fixing of 4mm thick plain float glass with pins with silicon & putty including cost & conveyance of all materials complete for finished item of work.as directed by the department.First Floor

3

-

1233

... More
Fabrication, Supply and fixing in position of stainless steel Zindal 304 grade stairecase Hand railing as per approved drawing with top handrail as 2" dia and 1" dia and 2nos. Horizental total 3nos. as horizental pipes and verticles supports poles on 1 1/2" dia for every 4th step with necessary fittings items like bends, washers, bore caps, end round dummy caps etc including cost and conveyance of all material, all operational, incidental, labour charges etc such as cutting, welding, buffing, levelling etc complete for finished item of work.

7

-

4512

... More
Roofing with pre-painted Galvanume Trapezoidedal profile Roofing sheets with 0.5mm thickness, coating Alu-Zinc Coating AZ 15 GSM. Tensile strength 550 MPA, paint coating with regular modified polyster painting thickness top 18 to 20 microns, bottom 5 to 7 microns an using suitable size of 1.020m x upto 12.00m fixing with G.I. 'J' bolts & nuts 8mm dia GI / bitumen and limpet washers filled with white lead etc complete for finished item of work but excluding the cost of purlins, rafters etc complete Second Floor

28

-

741

... More
Supply and Fixing MS Purlins 50mm dia including Labour charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes, all labour charges etc., complete for finished item of work.

22

-

574

... More
Cement concrete (1:5:10) prop. (Cement, Sand, course aggregate) using 20mm gauge crushed granite metal from approved quarry including cost conveyance of all materials like cement, sand coarse aggregate, water etc., to site including cost of seigniorage charges on materials and all labour charges for mixing concrete, laying concrete including curing etc., complete for Dummy Columns Second Floor

12

-

8811

... More
Supply and fixing 580x440 mm orissa pan white glazed W.C with S or P trap Hindustan/Parry/Neycer make confirming to ISS no. 2556 including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work.

4

-

1600

... More
Supply and fixing white glazed flat back bowl Urinals of size 440x265x315mm with internal flashing rim fixed with scwers complete indian make Hindustan / Parry/ Neycer make confirming to ISS no. 2556 including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work.

7

-

918

... More
Supply and fixing of PVC low level system parry ware,slim line with internal components & short bend: 10 litres capacity single flush including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work

4

-

2005

... More
Supply and fixing of 550x400mm single CP pillar cock Indian make flat back wash hand basin (HSW/Parryware/Neycer) 1st quality conforming to IS 2556-Part-4-1972 with waste fittings like rubber plug, chain, 32mm nominal size CP fitting with parallel pipe thread conforming to IS-2963-1979 and fitted with 15mm nominal lbore chromium plated pillar tap of 1st quality Indian make 300 grams Seiko/Esso or equivalent complete with standard CI brackets including wooden block , including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work.

5

-

1785

... More
Supply and fixing 38.10 mm dia. PVC solid waste pipe outlet for wash hand basin of Kohinoor make including cost and conveyance of all materials and labour charges, etc. complete.

10

-

101

... More
Supply and fixing 76.20 mm dia. C.I. Nahani traps (with out jaly with out inlet) UPVC/SWR pipe fitting (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete.

6

-

99

... More
Supply and fixing of round jali UPVC/SWR pipe fitting (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete.

6

-

27

... More
Supply and fixing of 15mm Brass boy cp finish bib cock Indian make 300 gms with ISI mark including cost and conveyance of all materials and labour charges, etc. complete. (Seiko or equivalent make)

6

-

253

... More
Supply and fixing of 12.70mm (1/2”) PVC connection with brass Union nut CP coated first quality to Kohinoor make including cost and conveyance of all materials and labour charges, etc. complete.

10

-

115

... More
Supply and fixing of 75mm 3” door bend 87.50 degree, UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete

12

-

76

... More
Supply and fixing of110mm 4” 45 degree bend, UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete

12

-

122

... More
Supply and fixing of110mm single socket PVC/SWR pipe fittings 4 Kg/Sqcm(Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete

25

-

566

... More
Supply and fixing of110mm plain bend, 87.5 Degree UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete

12

-

94

... More
Supply and fixing of 75mm plain bend, 87.5 Degree UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete

12

-

57

... More
Supplying & Fixing 75mm dia 3 M Single Socket PVC/SWR pipe - 4Kg/sq.cm. - Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost and conveyance of all materials and labour charges etc., complete.

25

-

308

... More
Cutting holes in Brick masonry and Re-doing good and all labour charges etc complete

15

-

67

... More
Cutting holes in R.C.C. slab and repairs with neat finishing etc. complete for finished item of work.

15

-

102

... More
Cutting holes in stone masonary & basement and repairs Labour charges only

6

-

102

... More
Supplying and fixing liquid soap container NP metallic with NP brackets and screws including cost and conveyance of all materials and labour charges etc complete.

4

-

468

... More
Supplying, laying, jointing and testing 101.6 mm SWG SP-I pipes of ISI make conforming to ISI 651& 4127 with airtight cement joints in CM. 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping including cost and conveyance all materials and labour charges etc., .

15

-

552

... More
Supplying, laying, jointing and testing 152.4 mm SWG SP-I pipes of ISI make conforming to ISI 651& 4127 with airtight cement joints in CM. 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping including cost and conveyance all materials and labour charges etc., ..

15

-

787

... More
Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 &4217 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6 mm (12"x9") C.I Frame and hinged over including cost and conveyance all materials and labour charges etc., ..

6

-

713

... More
Constructing 904.0 mm (3'0") dia brick masonryinspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) PROP USING 2ND Class Clay Bricks of 225 mm thick approved source having a minimum crushing strength of 5 N/sq. mm including plastering with cement mortar 1:3 prop; 1/2" thick both inside and outside fitted with 20" dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils ( excluding rock) and mm thick using 40 mm HBG Metal and P.C.C 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

-

8374

... More
Supply and fixing of 609.56mmX457.2 mm Indian make T.V shape mirror with plastic frame including cost and conveyance of all materials incidental, labour charges, etc,. complete for finished item of work.

6

-

529

... More
Providing and Placing on Terrace(at all floor levels) plyethelene water storage tank with Double layer approved brand and Manufuture with cover and suitable locking arrangements and making necessary holes for inlet and out lets and over flow pipes but whithout fitting and base support for tanks inculding cost and conveyance of all materils, lead and lift and transpotations to work site etc. complete

1000

-

8.24

... More
Supplying, laying, jointing and testing 152.4 mm CC bed1:2:4 prop: using 19.05 mm gauge graded granite metal chips and cradling 101.6 mm SWG pipe line all round to have 76.2 mm thick cover over the sockets including cost and conveyance all materials and labour charges etc., ...

15

-

168

... More
Supplying, laying, jointing and testing 152.4 mm CC bed1:2:4 prop: using 19.05 mm gauge graded granite metal chips and cradling 152.4 mm SWG pipe line all round to have 76.2 mm thick cover over the sockets including cost and conveyance all materials and labour charges etc., ...

15

-

285

... More
Construction of brick masonry seat for Orissa pan/Indian WC in CM (1:6) prop and plastering to 12mm thick in CM (1:4) prop with neat cement finishing etc,. complete for finished item of work.

3

-

308

... More
Supply & fixing European Water Closet of 1st quality conforming to IS: 2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with'S' trap including cost and conveyance of all material and labour charges etc complete

1

-

1921

... More
Supply & Fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size including cost and conveyance of all material and labour charges etc complete

2

-

900

... More
Supply & Fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size including cost and conveyance of all material and labour charges etc complete

4

-

1287

... More
Supply & Fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 32 mm NB Size including cost and conveyance of all material and labour charges etc complete

4

-

1947

... More
Supply & Fixing Bronze Gate/ Globe valve as per IS - 778 Class -I, Indian make heavy type - 40 mm NB Size including cost and conveyance of all material and labour charges etc complete

4

-

2626

... More
Supply and fixing 25.4mm copper ball cock with PVC ball Indian make ISI mark including cost and conveyance of all materials and labour charges etc.,.

2

-

483

... More
Supply and Fixing 75mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/Sudkhakar/Kisan/Supreme or any ISI Brand) including cost and conveyance of all materials and labour charges etc.,

6

-

16

... More
Supply and Fixing 110mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/Sudkhakar/Kisan/Supreme or any ISI Brand) including cost and conveyance of all materials and labour charges etc.,

6

-

22

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings 15.90mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold Water (IS 15778:2007) including cost and conveyance of all material and labour charges etc complete.

15

-

145

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings 22.20mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold Water (IS 15778:2007) including cost and conveyance of all material and labour charges etc complete.

30

-

166

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings 28.60mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold Water (IS 15778:2007) including cost and conveyance of all material and labour charges etc complete.

30

-

219

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings 34.90mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold Water (IS 15778:2007) including cost and conveyance of all material and labour charges etc complete.

15

-

299

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings 41.30mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold Water (IS 15778:2007) including cost and conveyance of all material and labour charges etc complete.

15

-

372

... More
Supply and Fixing of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all material and labour charges etc complete.

4

-

192

... More
Supply and Fixing of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all material and labour charges etc complete.

4

-

253

... More
Supply and Fixing of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all material and labour charges etc complete.

4

-

265

... More
Supply and Fixing of 40mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all material and labour charges etc complete.

4

-

543

... More
Supply & Fixing CP finish steel towel rod of 600 mm long and 20mm dia with brackets including cost and conveyance of all material and labour charges etc complete

2

-

409

... More
Supply & Fixing of 15 mm Stainless steel flexible hose 1.0 m long for hand shower / health faucet with brass nuts including cost and conveyance of all material and labour charges etc complete

1

-

264

... More
Supply & Fixing of 15 mm CP finish brass body health faucet gun including cost and conveyance of all material and labour charges etc complete

1

-

217

... More
Supply & Fixing of 15 mm nominal size CP finish brass stop valve screw type with internal /external threaded conforming to IS 8931 including cost and conveyance of all material and labour charges etc complete

12

-

239

... More
Supply & Fixing of of 15 mm brass body CP finish two way bib tap of not less than 400 grams weight with quarter turn spindle internal/ external threaded connection conforming to IS 8931 including cost and conveyance of all material and labour charges etc complete

1

-

882

... More
Supplying and Fixing of best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 including cost and conveyance of all material and labour charges etc complete

1

-

834

... More
Supplying and Fixing of 110 mm dia - Single Tee - UPVC/SWR Pipe fittingsincluding cost and conveyance of all material and labour charges etc complete

6

-

123

... More
Supplying and Fixing of 110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings including cost and conveyance of all material and labour charges etc complete

6

-

147

... More
Supplying and Fixing of 75 mm dia - Single Tee - UPVC/SWR Pipe fittings including cost and conveyance of all material and labour charges etc complete

6

-

67

... More
Supplying and Fixing of 75 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings including cost and conveyance of all material and labour charges etc complete

6

-

82

... More
Supplying and Fixing of 110 mm dia - Single 'Y' - UPVC/SWR Pipe fittings including cost and conveyance of all material and labour charges etc complete

6

-

153

... More
Supplying and Fixing of 75 mm dia - Single 'Y' - UPVC/SWR Pipe fittings including cost and conveyance of all material and labour charges etc complete

6

-

83

... More
Supply and laying of 20mm dia 2.0mm thick PVC pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in roof slab with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point etc. including all labour charges etc. complete.

300

-

71

... More
Supply and laying of 25mm dia 2.0mm thick PVC pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in roof slab with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point etc. including all labour charges etc. complete.

1500

-

79

... More
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR / EBXL PVC insulated flexible ISI mark copper cable of Finolex / RR kabel / Fortune Art EBXL make in existing surface pipe with Anchor / Gold Medal Olive / Million Zoom. Make ISI mark 6A Flush type switch, Ceiling rose fixing on 8”x10” sunglass deluxe board including all labour charges etc., complete for light and bell points in N.R.B.

175

-

506

... More
Supply and Run of 2 of 36/0.3mm (2.5 Sq.mm) FR / FRLS P.V.C. insulated flexible ISI mark copper cable of Finolex / RR Kable / Fortune Art EBXL. Make in existing pipe for run of mains including all labour charges etc., complete.

1500

-

62

... More
Supply and Run of 2 of 56/0.3mm (4.0 Sq.mm) FR / FRLS P.V.C. insulated flexible ISI mark copper cable of Finolex / RR kabel / Fortune Art EBXL. Make in existing pipe for run of mains including all labour charges etc., complete.

800

-

93

... More
Supply and run 2 of 6.00 sqmm (84/0.3) PVC flexible copper cable of GM/Million/Polycab of any ISI make the existing metallic / non metallic conduit pipe for main distribution board including cost and conveyance of all materials and labour charges and with 1 No. 3/20 copper wire for earth continuity etc complete.

200

-

157

... More
Supply and fixing of Anchor / Gold Medal Olive / Million Zoom. Make ISI mark 6A Flush type switch with 6A 3 pin wall plug socket on a common switch board with earth connections and all labour charges etc., complete.

100

-

137

... More
Supply and fixing of Goldmedal / Million / Vimal / Maru / Millitec / Anchor make ISI mark Mini Modular type 16A 3pin / 6A 3pin plug socket with indicator lamp, 16Amps fuse unit and 16 Amps switch control (5 in one) with cover frame on 6”x8” sunglass deluxe board including earth connection and all labour charges etc., complete on wall.

30

-

450

... More
Supply and fixing of distribution board with 20 A single plug phase and socket in sheet enclosure with 10/16/20 AMPS SPMC including internal connections and labour charges etc. surface flush etc. complete.

5

-

1921

... More
Providing independent earthing by excavating a trench to a depth of 2.1Mtr in all soils as per size specified in the data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes, Earthwork excavation of hard gravel soil with small boulder for trench 1st step of size 1.5 x 0.6 x 0.9m., Excavation of Hard disteggrated rocks and boulders for trench 2nd step of size 1.2 x 0.6 x 1.2m, 25x6mm GI flat duly drilled 12mm holes (4nos.) of 200mm 8" length. Drilling of 16 Nos. through holes of 12mm dia to GI pipe, GI nuts, bolts and washers, 18" dia hume pipe ring, hard coke 40Kgs., salt 20 Kgs. etc complete.

3

-

3133

... More
Supply and run of 2 of 14/0.30 (10.00 Sqm) F.R. PVC insulated flexible copper cable of Goldmedal/Million/Polycab of any ISI make in existing metallic/non-metallic conduit pipe for mains including all labour charges etc. complete except batten holders of.

1200

-

181

... More
Supply and Run of No.8 SWG G.I. wire including cost of all accessories and labour charges etc., complete (0.104Kgs / 1 Mtr)

100

-

20

... More
Supply, Transportation of 1200mm (48”) Sweep Crompton High Speed / Bajaj Ultima / Havells Velocity / Usha Astra / Orient Summer Pride. Make AC Ceiling fan with all standard accessories but without regulator including all labour charges etc., complete.

80

-

2289

... More
Supply, Transportation and fixing of 1x36/40W box type tube light luminaire with powder coated CRCA sheet steel housing with VPIT Ballast and 1No. 4’-40W tube including fixing on wall / ceiling on TW round blocks and all standard accessories of makes Wipro / GE / Phillips.

100

-

860

... More
Labour charges for fixing of ceiling fan and regulator including transportation and giving connections with twein core wire etc complete.

80

-

186

... More
Supply, Transportation and fixing of Integral 150W HPSV street light luminaire comprises of single piece die cast Alluminium body with copper wound ballast and capacitor, Ignitor, with pot optics and IP 65 protection of makes Wipro / GE / Phillips including 250W HPSV lamp and fixing of luminaire on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting arrangements, 2.5 Sq.mm flexible copper cable including masonary work and all labour charges and giving connections etc., complete.

4

-

6566

... More
Supply and fixing of 16 A 3pin and 6A 3 pin plug socket with and 16A switch control duly recessed in wall with MS switch deep box of Modular power socket and switch of Anchor / MK make on modular plates suitable clipping on modular metallic box concealed wall to complier including necessary connections complete etc.,

10

-

450

... More
Supply and fixing of 6 A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc complete Makes: Anchor / Gold Medal

10

-

137

... More
Supply and Fixing of TPN Distribution Board with IP-43 protection (rectal door) suitable for 3 phase ELCB/RCCB/FP insulation in commer and 10 KA Sp MCB's as outgoing including internal connection and labour charges for floor mounting etc complete make MDS/6E/L&T/Seimens/Scherinder (4 Way)

4

-

8136

... More
Supply and Fixing of TPN Distribution Board with IP-43 protection with 125A 4 pole 25 KA MCB as in commer with 4 Nos. 63A TP MCB's and 12m 10KVA SP Mcb as outgoing including internal connection and labour charges for floor mounting etc complete make MDS/6E/L&T/Seimens/Scherinder (8 Way)

4

-

36141

... More
Supply and run 2 of 84/0.3mm (6.0 Sq.mm.) FR PVC insulated flexible copper cable in existing pipe for mains including all labour charges etc Makes: Finolex / L&T

200

-

126

... More
Supply and Errecting MS Galvanized hooks with in RCC Roof Slab including all labour charges etc complete.

100

-

88

... More
Supply and Errecting MS Fan down take rods from fan hook with a length of 0.45mt. And 12.50 dia including all labour charges etc complete.

100

-

40



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.