For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,04,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IITH_831426_1Tender No
IITH/CMD/CIV/2024-25/NIT-27Tender Authority
Indian Institute Of Technology ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.
175
-
-
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
-
-
-
Channels, angles, tees and flats
1030
-
-
Rebate for taking away MS 'Y" Angles with Barbed wire beyond IIT Hyderabad Permises
5210
-
-
Rebate for taking away Rubble Stones beyond IIT Hyderabad Permises
161
-
-
CARRIAGE OF MATERIALS.
1.1 By Mechanical Transport including loading,unloading and stacking
-
-
-
Lime, moorum, building rubbish up to 3Km
111
-
-
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-
-
-
All kinds of soil
1594
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
1549
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
Foundations, footings, bases for columns
122
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
1:4:8 ( 1 cement : 4 coarse : 8 Grade stone aggregate 40 mm nominal size )
14
-
-
Providing and laying solid concrete blocks masonry with block of M7.5 grade cement concrete of required thickness as per drawing in sub & superstructure plinth level up to V level with RCC band and mullion as per structural detail in cement mortar 1:4 (1 cement : 4 coarse sand) all complete as per direction of Engineer in Charge.
139
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for all heights:
-
-
-
Columns, Pillars, Piers, Abutments, Posts and Struts
432
-
-
Lintels, beams, plinth beams, girders, bressumers and cantilevers
168
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand ( Zone-III) : 3 graded stone aggregate 20 mm nominal size)
48
-
-
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand ( Zone-III) : 3 graded stone aggregate 20 mm nominal size)
Columns above Plinth
16
-
-
reinforcement for R.C.C. work including sraighttening, cutting, bending, placing in position and binding all complete.
-
-
-
Thermo-Mechanically Treated bars of grade Fe 500D or more.
4900
-
-
Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required centering complete.
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20 mm nominal size)
4
-
-
Cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement.
-
-
-
12mm cement plaster.
113
-
-
12 mm cement plaster of mix :
-
-
-
1:4 (1 cement: 4 coarse sand)
467
-
-
15 mm cement plaster 1:3 (1cement : 3 coarse sand) finished with a floating coat of neat cement on rough the rough side of single or half brick wall.
113
-
-
15 mm cement plaster on rough side of single or half brick wall of mix :
-
-
-
1:4 (1 cement: 4 coarse sand)
467
-
-
Applying priming coat :
-
-
-
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
222
-
-
Finishing walls with water proofing cement paint of required shade :
-
-
-
New work (Two or more coats applied @ 3.84 kg/10 sqm)
1160
-
-
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
674
-
-
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid forseparately). Payment to be made per metre cost of total length of barbed wire used.
-
-
-
With G.I. barbed wire.
1884
-
-
Providing and fixing in position pre-moulded joint filler in expansion Joints
3024
-
-
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
-
-
-
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
811
-
-
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade
-
-
-
Two or more coats on new work
26
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%