Indian Institute Of Chemical Technology Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CSIR_68537_1Bid Award Id
ViewTender No
PUR/2557/2020-21Tender Authority
Indian Institute Of Chemical Technology ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
SITC of Lab Benches with granite top, sink with tap and eye wash ( water inlet to be taken for existing point through a water line and out let to be connectod to the existing drainage line)and peg holder of 32 pegs cabinets below the lab benches with drqwers and locking arrangement with modular eletrical structure for wiring haveng seven plugs of 16A, seven plugs of 5A switches and necessry wiring as per specifications at para no 2 chapeter No four of this tender document. The total benches shall be as per the layout drawing (specifications as per chapter 4)
1
-
-
SITC of chemical storage cabinets 3 feet above the Lab benches. The height of the cabinet shall be 2½ feet width, depth will be 18" inches for the full length. The cabinet should have one shelf and glass door including 180 degreee of locking system. work bench with necessary mounting on the wall connection with hood ducting to removal of fumes (specifications as per chapter 4)
1
-
-
SITC of effluent drain pipe connecting all the fumehood sinks and finally connecting to the main drainage pipe for effluent disposal. (specifications as per chapter 4)
1
-
-
SITC Pipeline of compressed air, vaccumm , chilled water with insulation ( must supply 20 fume hoods and 20 rota vapurs) , raw water, nitrogen gas line with one standby line for gas of appropriate material including connection to the fumehoods an atleast four points on the lab benches for connecting to instruments (specifications as per chapter 4)
1
-
-
SITC of fire alarm system with celing mounted smoke detector , automatic fire extuingishing system Novec 1230 fire protection fluid or equavalent quantity of the fluid must be sufficient to cover the whole area for which calculation sheet from the 3rd party or from website to be enclosed (specifications as per chapter 4)
1
-
-
SITC of False ceiling with fire retardent material, with ceiling mounted LED fixtures and lights, ceiling mounted ceiling fan with remote, the fire alaram hooter shall be kept at a central place connecting all the rooms. (specifications as per chapter 4)
1
-
-
SITC of Flooring with anti skid floor tiles (specifications as per chapter 4)
1
-
-
SITC of height adjustable, 360 degree swieel mehanisam heavy duty stainless steel chair with cushion at seat and backnd a foot rest as per the picture shown in the tender document 8 nos (specifications as per chapter 4)
1
-
-
SITC of Fireproof solvent storage cabinets two nos (specifications as per chapter 4)
1
-
-
SITC of modular chemical storage cabinet inside the laboratory as per the layout (specifications as per chapter 4)
1
-
-
SITC painting of the total area inside the lab including false ceiling (specifications as per chapter 4)
1
-
-
Rennovation of Lab No. 2
-
-
-
Removal of existing pipeline, Old fumehoods, Ducting associated with the hoods, reagent racks, work benches,Demolishion of concrete structure in the room, Removal of flooring Shifing of debris to outside the lab, Shifting of other items to scrap yard, closing or repair of any opening etc in the room (specifications as per chapter 4)
1
-
-
SITC of Four Nos of Fumehoots with Four Nos of spot extracter, modular cabinet below the hood as per specification mentioned in para no 1 of chapter Four of the tender document including appropriate ducting to the roof level with provision to instal a cluster and subsequent provision for installatio of scrubbing system (specifications as per chapter 4)
1
-
-
SITC of Lab Benches with granite top, sink with tap and eye wash ( water inlet to be taken for existing point through a water line and out let to be connectod to the existing drainage line)and peg holder of 32 pegs cabinets below the lab benches with drqwers and locking arrangement with modular eletrical structure for wiring haveng seven plugs of 16A, seven plugs of 5A switches and necessry wiring as per specifications at para no 2 chapeter No four of this tender document. The total benches shall be as per the layout drawing (specifications as per chapter 4)
1
-
-
SITC of chemical storage cabinets 3 feet above the Lab benches. The height of the cabinet shall be 2½ feet width, depth will be 18" inches for the full length. The cabinet should have one shelf and glass door including 180 degreee of locking system. work bench with necessary mounting on the wall connection with hood ducting to removal of fumes (specifications as per chapter 4)
1
-
-
SITC of effluent drain pipe connecting all the fumehood sinks and finally connecting to the main drainage pipe for effluent disposal. (specifications as per chapter 4)
1
-
-
SITC Pipeline of compressed air, vaccumm , chilled water with insulation ( must supply 20 fume hoods and 20 rota vapurs) , raw water, nitrogen gas line with one standby line for gas of appropriate material including connection to the fumehoods an atleast four points on the lab benches for connecting to instruments (specifications as per chapter 4)
1
-
-
SITC of fire alarm system with celing mounted smoke detector , automatic fire extuingishing system Novec 1230 fire protection fluid or equavalent quantity of the fluid must be sufficient to cover the whole area for which calculation sheet from the 3rd party or from website to be enclosed (specifications as per chapter 4)
1
-
-
SITC of False ceiling with fire retardent material, with ceiling mounted LED fixtures and lights, ceiling mounted ceiling fan with remote, the fire alaram hooter shall be kept at a central place connecting all the rooms.(specifications as per chapter 4)
1
-
-
SITC of Flooring with anti skid floor tiles (specifications as per chapter 4)
1
-
-
SITC of height adjustable, 360 degree swieel mehanisam heavy duty stainless steel chair with cushion at seat and backnd a foot rest as per the picture shown in the tender document 8 nos (specifications as per chapter 4)
1
-
-
SITC of Fireprrof solvent storage cabinets two nos (specifications as per chapter 4)
1
-
-
SITC of modular chemical storage cabinet inside the laboratory as per the layout (specifications as per chapter 4)
1
-
-
SITC painting of the total area inside the lab including false ceiling (specifications as per chapter 4)
1
-
-
Rennovation of Lab No. 3
-
-
-
Removal of existing pipeline, Old fumehoods, Ducting associated with the hoods, reagent racks, work benches,Demolishion of concrete structure in the room, Removal of flooring Shifing of debris to outside the lab, Shifting of other items to scrap yard, closing or repair of any opening etc in the room (specifications as per chapter 4)
1
-
-
SITC of Four Nos of Fumehoots with Four Nos of spot extracter, modular cabinet below the hood as per specification mentioned in para no 1 of chapter Four of the tender document including appropriate ducting to the roof level with provision to instal a cluster and subsequent provision for installatio of scrubbing system (specifications as per chapter 4)
1
-
-
SITC of Lab Benches with granite top, sink with tap and eye wash ( water inlet to be taken for existing point through a water line and out let to be connectod to the existing drainage line)and peg holder of 32 pegs cabinets below the lab benches with drqwers and locking arrangement with modular eletrical structure for wiring haveng seven plugs of 16A, seven plugs of 5A switches and necessry wiring as per specifications at para no 2 chapeter No four of this tender document. The total benches shall be as per the layout drawing specifications as per chapter 4
1
-
-
SITC of chemical storage cabinets 3 feet above the Lab benches. The height of the cabinet shall be 2½ feet width, depth will be 18" inches for the full length. The cabinet should have one shelf and glass door including 180 degreee of locking system. work bench with necessary mounting on the wall connection with hood ducting to removal of fumes (specifications as per chapter 4)
1
-
-
SITC of effluent drain pipe connecting all the fumehood sinks and finally connecting to the main drainage pipe for effluent disposal. (specifications as per chapter 4)
1
-
-
SITC Pipeline of compressed air, vaccumm , chilled water with insulation ( must supply 20 fume hoods and 20 rota vapurs) , raw water, nitrogen gas line with one standby line for gas of appropriate material including connection to the fumehoods an atleast four points on the lab benches for connecting to instruments (specifications as per chapter 4)
1
-
-
SITC of fire alarm system with celing mounted smoke detector , automatic fire extuingishing system Novec 1230 fire protection fluid or equavalent quantity of the fluid must be sufficient to cover the whole area for which calculation sheet from the 3rd party or from website to be enclosed (specifications as per chapter 4)
1
-
-
SITC of False ceiling with fire retardent material, with ceiling mounted LED fixtures and lights, ceiling mounted ceiling fan with remote, the fire alaram hooter shall be kept at a central place connecting all the rooms.(specifications as per chapter 4)
1
-
-
SITC of Flooring with anti skid floor tiles (specifications as per chapter 4)
1
-
-
SITC of height adjustable, 360 degree swieel mehanisam heavy duty stainless steel chair with cushion at seat and backnd a foot rest as per the picture shown in the tender document 8 nos (specifications as per chapter 4)
1
-
-
SITC of Fireproof solvent storage cabinets two nos (specifications as per chapter 4)
1
-
-
SITC of modular chemical storage cabinet inside the laboratory as per the layout (specifications as per chapter 4)
1
-
-
SITC painting of the total area inside the lab including false ceiling (specifications as per chapter 4)
1
-
-
Rennovation of Lab No. 4
-
-
-
Removal of existing pipeline, Old fumehoods, Ducting associated with the hoods, reagent racks, work benches,Demolishion of concrete structure in the room, Removal of flooring Shifing of debris to outside the lab, Shifting of other items to scrap yard, closing or repair of any opening etc in the room (specifications as per chapter 4)
1
-
-
SITC of Four Nos of Fumehoots with Four Nos of spot extracter, modular cabinet below the hood as per specification mentioned in para no 1 of chapter Four of the tender document including appropriate ducting to the roof level with provision to instal a cluster and subsequent provision for installatio of scrubbing system (specifications as per chapter 4)
1
-
-
SITC of Lab Benches with granite top, sink with tap and eye wash ( water inlet to be taken for existing point through a water line and out let to be connectod to the existing drainage line)and peg holder of 32 pegs cabinets below the lab benches with drqwers and locking arrangement with modular eletrical structure for wiring haveng seven plugs of 16A, seven plugs of 5A switches and necessry wiring as per specifications at para no 2 chapeter No four of this tender document. The total benches shall be as per the layout drawing (specifications as per chapter 4)
1
-
-
SITC of chemical storage cabinets 3 feet above the Lab benches. The height of the cabinet shall be 2½ feet width, depth will be 18" inches for the full length. The cabinet should have one shelf and glass door including 180 degreee of locking system. work bench with necessary mounting on the wall connection with hood ducting to removal of fumes (specifications as per chapter 4)
1
-
-
SITC of effluent drain pipe connecting all the fumehood sinks and finally connecting to the main drainage pipe for effluent disposal. (specifications as per chapter 4)
1
-
-
SITC Pipeline of compressed air, vaccumm , chilled water with insulation ( must supply 20 fume hoods and 20 rota vapurs) , raw water, nitrogen gas line with one standby line for gas of appropriate material including connection to the fumehoods an atleast four points on the lab benches for connecting to instruments as per specs (specifications as per chapter 4)
1
-
-
SITC of fire alarm system with celing mounted smoke detector , automatic fire extuingishing system Novec 1230 fire protection fluid or equavalent quantity of the fluid must be sufficient to cover the whole area for which calculation sheet from the 3rd party or from website to be enclosed (specifications as per chapter 4)
1
-
-
SITC of False ceiling with fire retardent material, with ceiling mounted LED fixtures and lights, ceiling mounted ceiling fan with remote, the fire alaram hooter shall be kept at a central place connecting all the rooms. (specifications as per chapter 4)
1
-
-
SITC of Flooring with anti skid floor tiles (specifications as per chapter 4)
1
-
-
SITC of height adjustable, 360 degree swieel mehanisam heavy duty stainless steel chair with cushion at seat and backnd a foot rest as per the picture shown in the tender document 8 nos (specifications as per chapter 4)
1
-
-
SITC of Fireproof solvent storage cabinets two nos (specifications as per chapter 4)
1
-
-
SITC of modular chemical storage cabinet inside the laboratory as per the layout (specifications as per chapter 4)
1
-
-
SITC painting of the total area inside the lab including false ceiling (specifications as per chapter 4)
1
-
-
common Facilities
-
-
-
SITC of utility room in the ground floor suitable for housing silent air compresser, vaccum pump, water chiller, gas bank with maniflod with regulator.including pipelines to all the five labs for connecting the fume hoods rotavapurs etc with suitable on off mechanism inside the lab gas leckage dettection system etc as per ASTM standards (specifications as per chapter 4)
1
-
-
SITC provision of fire alram hooter system at a common place in each floor, the gas cylinders containing the gas bank and the pipelines shall be at the utility room which needs to be connected to each lab provision to add a software to check the status of each smoke detector ,, alram system, availability of gas etc at the main gate and safety cell to be quoted as optionals in pdf this will not be calculated for evaluateing the bid, however the iict will reserve the right to place order fo subh a system at alater date (specifications as per chapter 4)
1
-
-
SITC of effluent drainsystem at ground level,. The pipe shall run 2 separate lines for the whole lengh of the building up to the solvent tank, the pipe shall have connection form four labs mentioned above including provision to connect other labs of the building at a laer date, the pipe line may be drwn under ground inside a trench, storage tank of 10000KL capacity cllecting all effluent with a pump to take out the effluents is required (specifications as per chapter 4)
1
-
-
SITC to provide a silent air compresser (specifications as per chapter 4)
1
-
-
SITC of vaccum pump it should be able to cater 20 rota vapurs (specifications as per chapter 4)
1
-
-
SITC to provide chiller (specifications as per chapter 4)
1
-
-
GAS cylinder with regulator 2 to be connecte to the gas line and 2 stand by (specifications as per chapter 4)
1
-
-
Safety shower at a designated place including water inlet and out let (specifications as per chapter 4)
1
-
-
Blower (specifications as per chapter 4)
1
-
-
Construction of 4 chemical storage rooms 10/10 or 8/12 in the ground floor with locking arrangement for each lab with some detector (specifications as per chapter 4)
1
-
-
Stainless Steel solvent safety cans of 2L - 100 Nos. (specifications as per chapter 4)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements