Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Opening Date31 Oct 2020
Closing Date7 Nov 2020
Tender Amount₹ 1,38,12,643 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
No open Manhole cover policy;Plain cement concrete PCC M20 Nominal Mix, using 20mm gauge graded hard granite machine crushed metal inclduing cost and conveyance of all materials coarse and fine aggregate ( As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, the Government have directed all the Engineering works Deparments to use Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all mixes of cement concrete and in the items of works to site, centering, machine mixing, lifts and delifts, leads laying in position, compacting, curing all labour charges etc., complete ficers at site, Seignorage charges sales & other taxes on all materials including all operational, incidental and labour charges such as weight, batching, mahcine, mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content (400 kgs per cum) as per IS code centering with steel scaffolding pipes, jack pipr, steel centering plates, shuttering, laying concrete, vibrating, curing etc, complete but excluding the cost of work as etc., complete as directed by the HMWSSB Engineers

257.33

-

1530598.84

... More
No open Manhole cover policy;Platering with cement motor (1:6) Prop 12mm thick using manufactured sand ( rock sand and natural) river sand and the ratio of 50:50 As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, with sponge finishing including cost and conveyance of all materials to site, tools and plants labour charges leads, lifts, curing scaffloding and all other incidental and operational charges etc., complete to the finished item of work as directed by the HMWS&SB Engineers.( External plastering)

3591.91

-

549562.23

... More
No open Manhole cover policy;Platering with cement motor (1:3) Prop 20mm thick using manufactured sand ( rock sand and natural) river sand and the ratio of 50:50 As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, with sponge finishing including cost and conveyance of all materials to site, tools and plants labour charges leads, lifts, curing scaffloding and all other incidental and operational charges etc., complete to the finished item of work as directed by the HMWS&SB Engineers. (Inside plastering)

2212.74

-

516674.79

... More
No open Manhole cover policy;Construction of brick masonry in CMT (1:4) Prop 20mm thick using manufactured sand ( rock sand and natural) river sand and the ratio of 50:50 As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, with sponge finishing including cost and conveyance of all materials to site, tools and plants labour charges leads, lifts, curing scaffloding and all other incidental and operational charges etc., complete to the finished item of work as directed by the HMWS&SB Engineers. (Carbelling portion)

669.28

-

5824596.6

... More
No open Manhole cover policy;Demolishin and disposal of unservicable materials ( un reinforced Brick Masonry) excluding carting the excavated material including all laobur charges, all leads , lifts and other incidental & operational charges etc, complete ( Carting of dismanteled) material separate as per item no.3) for lowering of existing manholes etc., complete to the finished item of work as directed by the HMWS&SB Engineers.

671.02

-

1106914.59

... More
No open Manhole cover policy;3. For Reconstruction of Sewer Manhole Cutting open B.T Road with 75mm thick including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

326.23

-

437702.79

... More
No open Manhole cover policy;Labour charges for fixing of FRC cover and frame and apoxy paint 2 coats over a primary coat to FRC cover and frame and all around the benching paint colour as etc., complete as directed by the H.M.W.S.& S. Board Engineers.

610

-

220868.8

... More
No open Manhole cover policy;Barricading, hoarding, lighting and Watching etc., for water supply pipe (WS pipe) line trenches etc., complete as directed by the HMWS&SB Engineers.

1500

-

193035

... More
No open Manhole cover policy;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

196.65

-

26036.46

... More
No open Manhole cover policy;Plain cement concrete PCC M20 Nominal Mix, using 20mm gauge graded hard granite machine crushed metal inclduing cost and conveyance of all materials coarse and fine aggregate ( As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, the Government have directed all the Engineering works Deparments to use Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all mixes of cement concrete and in the items of works to site, centering, machine mixing, lifts and delifts, leads laying in position, compacting, curing all labour charges etc., complete ficers at site, Seignorage charges sales & other taxes on all materials including all operational, incidental and labour charges such as weight, batching, mahcine, mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content (400 kgs per cum) as per IS code centering with steel scaffolding pipes, jack pipr, steel centering plates, shuttering, laying concrete, vibrating, curing etc, complete but excluding the cost of work as etc., complete as directed by the HMWSSB Engineers

135.71

-

807203.08

... More
No open Manhole cover policy;2. For Lowering of Sewer Manhole Demolishin and disposal of unservicable materials ( un reinforced Brick Masonry) excluding carting the excavated material including all laobur charges, all leads , lifts and other incidental & operational charges etc, complete ( Carting of dismanteled) material separate as per item no.3) for lowering of existing manholes etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

196.65

-

324393.84

... More
No open Manhole cover policy;Labour charges for fixing of FRC cover and frame and apoxy paint 2 coats over a primary coat to FRC cover and frame and all around the benching paint colour as etc., complete as directed by the H.M.W.S.& S. Board Engineers.

884

-

320078.72

... More
No open Manhole cover policy;Barricading, hoarding, lighting and Watching etc., for water supply pipe (WS pipe) line trenches etc., complete as directed by the HMWS&SB Engineers.

2000

-

257380

... More
No open Manhole cover policy;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers

62.66

-

8296.18

... More
No open Manhole cover policy;Plain cement concrete PCC M20 Nominal Mix, using 20mm gauge graded hard granite machine crushed metal inclduing cost and conveyance of all materials coarse and fine aggregate ( As per GO Ms.No.37 Industries and Commerce (Mines-I) Dept, Dt. 29.05.2018, the Government have directed all the Engineering works Deparments to use Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all mixes of cement concrete and in the items of works to site, centering, machine mixing, lifts and delifts, leads laying in position, compacting, curing all labour charges etc., complete ficers at site, Seignorage charges sales & other taxes on all materials including all operational, incidental and labour charges such as weight, batching, mahcine, mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content (400 kgs per cum) as per IS code centering with steel scaffolding pipes, jack pipr, steel centering plates, shuttering, laying concrete, vibrating, curing etc, complete but excluding the cost of work as etc., complete as directed by the HMWSSB Engineers

312.74

-

1860177.52

... More
No open Manhole cover policy;1.For Raising of Sewer Manhole Cutting open B.T Road with 75mm thick including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers.

62.66

-

84070.92



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.