For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Opening Date6 Nov 2020
Closing Date9 Nov 2020
Tender Amount₹ 1,37,53,252 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
No Open Manhole Cover Policy;Plain Cement Concrete PCC M 20 Nominal Mix; using 20 mm guage graded hard granite machine crushed metal including cost and conveyance of all materials coarse and fine agregate(As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018,the Government have directed all the Engineering works Departments to useManufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all the mixes of Cement concrete and in the items of works) to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete ficers at site, Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh, batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum Cement content(400 kg's per Cum) as per IS code centering with steel scaffolding Pipes, Jack Piepe, Steel centering Plates, Shuttering, laying Concrete, Vibrating, Curing etc., complete but excluding the cost steel and its fibrication charges for finished item of work,as directed by the departmental officers.

223.76

-

1330924.48

... More
No Open Manhole Cover Policy;Plastering with cement motor (1:6) proportion 12mm thick using manufactured sand (rock sand and natural river sand and the ratio of 50:50 (As per GO Ms No.37) industrial and commerce (mines-1) Dept, dated: 29.05.2018 with sponge finishing including cost and conveyance of all materials to site tools and plants labour charges lifts curing scapfolding and all other incidental and operational charges etc, complete as directed by the departmental officers.

3123.3

-

477864.9

... More
No Open Manhole Cover Policy;Plastering with cement motor (1:3) proportion 20mm thick using manufactured sand (rock sand and natural river sand and the ratio of 50:50 (As per GO Ms No.37) industrial and commerce (mines-1) Dept, dated: 29.05.2018 with sponge finishing including cost and conveyance of all materials to site, tools and plants labour charges leads lifts, curing, scapfolding and all other incidental and operations charge etc complete.

1924.06

-

449268.01

... More
No Open Manhole Cover Policy;Construction of brick masonry in CMT(1:4) proportion using manufactured sand (Rock sand) and natural river sand and the ratio of 50:50 (As per GO Ms No.7 industries and commerce (mines-1) department dated: 29.05.2018 using solid cement motor, bricks including cost and conveyance of all labour charges during and all other incidental and operations charges etc., complete.

581.96

-

5064669.85

... More
No Open Manhole Cover Policy;Demolishing and disposal of unserviceble materials (un reinforced cement concrete) excluding carting the excavated material, including all labour charges, all leads, lifts and other incidental & Operational charges etc.complete (For Reconstruction of damaged Sewer Manholes under O&M Div.VI)

583.48

-

962508.61

... More
No Open Manhole Cover Policy;Cutting open B.T. Road surface (as well s ashphalt/concrete upto 75mm thick) including water bound macadam and stacking excavated materials including all initial leads and lifts and conveyance of all materials labour charges and other incidential and operational charges, tools 7 plants etc. by manual means using Concrete cutter. (For Reconstruction of damaged Sewer Manholes under O&M Div.VI)

283.67

-

380600.04

... More
No Open Manhole Cover Policy;Labour chrges for fixing of FRC cover and frame and apoxy paint 2 coats over a primary coat to FRC cover and frame and allaround the benching, paint color as directed by the deptl. Officers. (For Lowering of Sewer Manholes under O&M Div.VI)

530

-

191902.4

... More
No Open Manhole Cover Policy;Barricading, hoarding, lighting and watching etc.for water supply and sewerage works trenches including cost of material labour etc. complete as directed by the deptl. Officers. (For Lowering of Sewer Manholes under O&M Div.VI)

1300

-

167297

... More
No Open Manhole Cover Policy;Carting of surplus excavated material from the site by CND (GHMC) (Carting amount deposited to GHMC) upto 10kms complete as directed by the deptl. Officers (For Lowering of Sewer Manholes under O&M Div.VI)

170.86

-

22621.86

... More
No Open Manhole Cover Policy;Plain Cement Concrete PCC M 20 Nominal Mix; using 20 mm guage graded hard granite machine crushed metal including cost and conveyance of all materials coarse and fine agregate(As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018,the Government have directed all the Engineering works Departments to useManufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all the mixes of Cement concrete and in the items of works) to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete ficers at site, Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh, batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum Cement content(400 kg's per Cum) as per IS code centering with steel scaffolding Pipes, Jack Piepe, Steel centering Plates, Shuttering, laying Concrete, Vibrating, Curing etc., complete but excluding the cost steel and its fibrication charges for finished item of work,as directed by the departmental officers.

117.91

-

701328.68

... More
No Open Manhole Cover Policy;Demolishing and disposal of unserviceble materials (un reinforced cement concrete) excluding carting the excavated material, including all labour charges, all leads, lifts and other incidental & Operational charges etc.complete as directed by the deptl. officers (For Lowering of Sewer Manholes under O&M Div.VI)

170.86

-

281850.66

... More
No Open Manhole Cover Policy;Labour chrges for fixing of FRC cover and frame and apoxy paint 2 coats over a primary coat to FRC cover and frame and allaround the benching, paint color as directed by the deptl. Officers. (For raising of sewer Manholes under O&M Div.VI)

769

-

278439.52

... More
No Open Manhole Cover Policy;Barricading, hoarding, lighting and watching etc.for water supply and sewerage works trenches including cost of material labour etc. complete as directed by the deptl. Officers. (For raising of sewer Manholes under O&M Div.VI)

1900

-

244511

... More
No Open Manhole Cover Policy;Carting of surplus excavated material from the site by CND (GHMC) (Carting amount deposited to GHMC) up to 10KMs completed as directed by deptl. Officers (For raising of sewer Manholes under O&M Div.VI)

54.5

-

7215.8

... More
No Open Manhole Cover Policy;Plain Cement Concrete PCC M 20 Nominal Mix; using 20 mm guage graded hard granite machine crushed metal including cost and conveyance of all materials coarse and fine agregate(As per GO Ms No 37 Industries and Commerce(Mines-I) Dept, dated 29.05.2018,the Government have directed all the Engineering works Departments to useManufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 in all the mixes of Cement concrete and in the items of works) to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete ficers at site, Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh, batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work with minimum Cement content(400 kg's per Cum) as per IS code centering with steel scaffolding Pipes, Jack Piepe, Steel centering Plates, Shuttering, laying Concrete, Vibrating, Curing etc., complete but excluding the cost steel and its fibrication charges for finished item of work,as directed by the departmental officers.

272.06

-

1618212.88

... More
No Open Manhole Cover Policy;Cutting open B.T. Road surface (as well s ashphalt/concrete upto 75mm thick) including water bound macadam and stacking excavated materials including all initial leads and lifts and conveyance of all materials labour charges and other incidential and operational charges, tools 7 plants etc. by manual means using Concrete cutter complete. as directed by deptl. officers (For raising of sewer Manholes under O&M Div.VI)

54.5

-

73122.65



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.