Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Eprocure
Opening Date19 Oct 2019
Closing Date31 Oct 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in MR and DMR requiring blasting.

29

-

-

... More
Supply, trasport and fixing of stubs and cleats with template and transporting to site and asembling at the site and shifting the template from loc to loc including cost of lead lift, labour,etc ., stub and cleat supplied asper std IS specification of approved by compentent authority complete.For KCR Tower

3

-

-

... More
Supply, trasport and fixing of stubs and cleats with template and transporting to site and asembling at the site and shifting the template from loc to loc including cost of lead lift, labour,etc ., stub and cleat supplied asper std IS specification of approved by compentent authority complete For HCR. Tower

1

-

-

... More
Supply, trasport and fixing of stubs and cleats with template and transporting to site and asembling at the site and shifting the template from loc to loc including cost of lead lift, labour,etc ., stub and cleat supplied asper std IS specification of approved by compentent authority complete. For GCR Tower

2

-

-

... More
PCC1:3: 6 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift , etc complete .

11.5

-

-

... More
PCC 1:2:4 using 20mm metal for chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .

102.5

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KCR tower

3

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. HCR tower

1

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. GCR tower

2

-

-

... More
supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.

6

-

-

... More
Removal of surplus earth in a low lying area to a average distance of 200m by head load.

114

-

-

... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete

6

-

-

... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.

34

-

-

... More
Supply,transport and erection of GI tower angles including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing and specification

28.4

-

-

... More
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension Disc insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete. (With PA rod for panther)

30

-

-

... More
Labour charges for transporting and hoisting of 8 units of 120 KN single Tension Disc insulators with supply and fixing of ST fittings for panther,S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.

48

-

-

... More
Labour charges for transport of 6 Nos of Panther conductor from department store,supply and fixing of panther conductor hardwares(ie.SB damper, Dshackle, U bolt,MSJ for panther etc ),paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. (continous Span ) with out LC.

1.55

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning,including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete.(Continous Span ). with out LC.

1.55

-

-

... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .

2.5

-

-

... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete

27

-

-

... More
Supply transport,Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete

11

-

-

... More
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete

1

-

-

... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete

6

-

-

... More
Providing temporary guys wherever necessary includingexcavation, buryingout of anchor forstaywire, tightening, dismantling the same after completion of works including cost of allmaterials, lead,lift,labour etc complete.

4

-

-

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete

8

-

-

... More
Labour charges for removal of large trees

12

-

-

... More
Labour charges for removal of Small tree

16

-

-

... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.

3824

-

-

... More
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.

4650

-

-

... More
Providing trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.