Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Eprocure
Opening Date14 Jul 2018
Closing Date19 Jul 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in MR and DMR not requiring blasting.

231

-

-

... More
Earthwork excavation in MR and DMR requiring blasting.

116

-

-

... More
Earthwork excavtion in hard rock measured in solid including blasting and stacking

58

-

-

... More
Removal of HR by wedging and chiselling

58

-

-

... More
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. (Stub and cleat only supplied by department) For KCR Tower

4

-

-

... More
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. (Stub and cleat only supplied by department) For HCR Tower

1

-

-

... More
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. (Stub and cleat only supplied by department) ForLSR Tower

2

-

-

... More
PCC1:3: 6 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift ,frustum box , etc complete .

21

-

-

... More
PCC 1:2:4 using 20mm metal for chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .

123

-

-

... More
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.

8200

-

-

... More
RCC 1:1.5:3 mix using 20mm graded hard machine broken granite stone, foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement.)

79

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KCR tower

4

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. HCR tower

1

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. LSR tower

2

-

-

... More
supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.

5

-

-

... More
Removal of surplus earth in a low lying area to a average distance of 200m by head load.

223

-

-

... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete

2

-

-

... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.

2

-

-

... More
Transport and erection of GI tower angles including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing and specification

55

-

-

... More
Fabrication, supply of hot dip galvanized Tower parts, as per relevant IS spaecification and erection including Cost of materials, sorting out of tower parts, transport of tower parts rectification of defective member it any including providing correct holes and cutting of angle wherever necessary, patch painting tightening of bolts and nuts punching, lead lift, etc., including T & Ps. Any defect that are pointed out by operation wing of TANTRANSCO before taking over of line should be rectified by free of cost.

0.5

-

-

... More
Supply and fixing of hot dipped glavanised iron Bolt and Nut, packing washers,Spring washers, conforming to IS 2427/1988, and IS 387 part XIII of latest issue including cost of materials, lead,lifts,etc,complete.

20

-

-

... More
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension Disc insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete (With out PA rod for panther)

18

-

-

... More
Labour charges for transporting and hoisting of 8 units of 120 KN single Tension Disc insulators with supply and fixing of ST fittings for panther,S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete

30

-

-

... More
Labour charges for transporting and hoisting of 9 units of 120 KN Double suspension insulators with supply & fixing of DT fittings for panther with supply of SB damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete

6

-

-

... More
Labour charges for transport of 3 Nos of Panther conductor from department store,supply and fixing of panther conductor hardwares(ie.SB damper, Dshackle, U bolt,MSJ for panther etc ),paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete(single span )

6

-

-

... More
Labour charges for transport of 3 Nos of Panther conductor from department store,supply and fixing of panther conductor hardwares(ie.SB damper, Dshackle, U bolt,MSJ for panther etc ),paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete(single span WithRailway LC)

1

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning,including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete. ( single Span )

6

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning,including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete. ( single Span with railway LC )

1

-

-

... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .

5

-

-

... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete

34

-

-

... More
Supply transport,Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete

14

-

-

... More
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete

3

-

-

... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete

7

-

-

... More
Providing temporary guys wherever necessary including excavation,buryingout of anchor forstaywire,tightening,dismantling the same after completion of works including cost of allmaterials,lead,lift,labour etc complete.

6

-

-

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete

5

-

-

... More
Labour charges for removal of large trees

50

-

-

... More
Labour charges for removal of Small tree

50

-

-

... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.

9200

-

-

... More
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.

5300

-

-

... More
Providing trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.

10

-

-

... More
Providing Railway crossing earthing arrangements for tower including necessary excavationby augar borewell for fixing 3m long 75mm dia GI "C" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with salt, charcoal and connect the earthstrip with the leg of the stub and fixing the GI barbed wire for anticlaimbing device to the required height as per instructionof site engineer and approved drawing for earthing including cost all materials,labour,lead,lift etc complete.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.