Tamil Nadu Transmission Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Eprocure
Opening Date14 Dec 2020
Closing Date30 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 1,12,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_EB_187712_1Bid Award Id
ViewTender No
CE/TP II/TRY/C-14/20-21Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork excavation
-
-
-
... More
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
1008
-
-
... More
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
706
-
-
... More
Earthwork excavation in MR and DMR requiring blasting.
101
-
-
... More
Earthwork excavtion in hard rock measured in solid including blasting and stacking
101
-
-
... More
Removing hard rock by wedging, chissellingand trimming to proper shape where blasting is prohibited
101
-
-
... More
Transporting and fixing of stub and cleat using levelling instrument with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for template ,labour, fabrication charges etc complete. (Stub and cleat only supplied by department)
-
-
-
... More
For KCR Tower
9
-
-
... More
For HCR Tower
3
-
-
... More
For GCR Tower
11
-
-
... More
Supply, Fabrication and erection of D.P. Structure with RS joint with size of 250X125 and MS Channel, Angles including staightering of RSJ pole and MS channel and and cutting the required length drilling holes and D,P bolts and nuts as per the Std design and drawing etc., including loading, unloading and transport and incl.Galvanising as per the direction of the Engineer incharge of the work including cost of all T&P transport, labour, lead lift etc., comple.
10
-
-
... More
PCC 1:3:6 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
37
-
-
... More
PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
86
-
-
... More
PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .For GCR,HCR & KCR Tower.
339
-
-
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
1569
-
-
... More
Supply,Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.(as per std specification)
27
-
-
... More
Removal of surplus earth in a low lying area As per the direction of Engineer-incharge at site.
449
-
-
... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
55
-
-
... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
980
-
-
... More
Transport and erection of GI tower angles ,square cross arm including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing and specification
105
-
-
... More
Supply,Transport and erection of GI tower angles , square cross arm including cost of materials, T &P, labour, lead, lift etc complete.as per approved drawing and specification
3
-
-
... More
Transport and Labour charges for Hoisting of 7 units of 90kN suspension insulators with all allied hardwares and necessary fittings , including cost of Hardware fittings, etc,complete. Without PA Rod for Panther
39
-
-
... More
Transport and Labour charges for Hoisting of 7 units of 90kN suspension insulators with all allied hardwares and necessary fittings , including cost of Hardware fittings, etc,complete. With PA Rod for Panther
66
-
-
... More
Transport and Labour charges for Hoisting of 8 units of 120kN suspension insulators with all allied hardwares and necessary fittings , including cost of Hardware fittings, etc,complete.
180
-
-
... More
Transport of 6 Nos of Panther conductor ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers for tension locations,MSJ,U bolt,D Shackle and repair sleeve wherever necessary including giving jumper connection for power conductor including transport charges, providing trussels wherever necessary loading unloading major and minor t&Ps lead lift etc complete.
-
-
-
... More
Single Span without L.C
9
-
-
... More
Contious Span without L.C
4.14
-
-
... More
Transport of 7/3.55mm earthwire , paying out, jointing, rough sagging, tensioning, including giving jumber connection including Supply of all Hardware Fittings ,transport charges, loading unloading,major and minor t&Ps, lead lift etc complete.
-
-
-
... More
Single Span without L.C
9
-
-
... More
Continous Span without L.C
4.14
-
-
... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
13
-
-
... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour,lead,lift etc complete.
167
-
-
... More
supply and Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift, etc complete.
82
-
-
... More
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
10
-
-
... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
27
-
-
... More
Providing temporary guys wherever necessary including excavation,buryingout ofanchor for stay wire, tightening,dismantling the same after completion of works including cost of all materials, lead,lift,labour etc complete.
12
-
-
... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete
7
-
-
... More
Labour charges for removal of trees
-
-
-
... More
Large trees
75
-
-
... More
Small trees
175
-
-
... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
14382
-
-
... More
Providing trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.
14
-
-
... More
SGST & CGST (If applicable quote the value, if not enter '0')
1
-
-
... More
IGST (If applicable quote the value, if not enter '0')
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements