Tamil Nadu Generation And Distribution Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Eprocure
Opening Date26 Sep 2019
Closing Date9 Oct 2019
Tender AmountRefer Documents
Costs
EMD
₹ 10,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_EB_139388_1Bid Award Id
ViewTender No
SPN No ACE MI NCTPS I 223 19 20Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NCTPS I ACE MI circle MPM Dn Unit I Dismantling of existing wornout compressor and erection testing and commissioning of new water cooled 140 TR capacity screw chiller assembly at centralized AC Plant including accessories and consumables
NCTPS I ACE MI circle MPM Dn Unit I Dismantling of existing wornout compressor and erection testing and commissioning of new water cooled 140 TR capacity screw chiller assembly at centralized AC Plant including accessories and consumables
BOQ Items
... More
Providing water flow switch assembly with suitable capillary water tubing, pressure gauges and fitting in chilled water and condenser lines for monitoring, including cost of material, consumables and hire charges for T&P’s.
1
-
-
... More
Dismantling the package, lifting and erecting the new chiller assembly on the modified bed frame, alignment, centering, providing anti vibration pads, including the cost of materials, consumables and hire charges for T&P’s.
1
-
-
... More
Leak testing with N2 gas conducting trail run, rectification of all trouble shoots, commissioning of the system and conducting 72 hours performance testing, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Butterfly valve/ Water design 150mm dia.
4
-
-
... More
Dismantling of condenser assembly after releasing all its fixing fasteners and removing out from its bed frame, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Refrigerant gas/ R134a/Dupont/ Refrigent gas R134a manufactured by Dupont
240
-
-
... More
Providing rubber bellows with flanges in chilled water lines, condenser water line to protect the lines from hammering and vibration, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Isolation of pipelines by providing dummy, cutting and removing of the chilled water, compressor lines and condenser water lines, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Flange/ MS/ 150NB, OD 285mm, PCD 240mm, Tk 20mm.
16
-
-
... More
Resuming all power connections with necessary inter cablings, lugs, termination etc., including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Feeding of referigent gas 134a for compressor, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Dismantling the receprocating compressor assembly with its motor after decoupling and releasing all its fasteners and removing out from its bed frame, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Bolt and nut/ HSFG 10.9/ M20 x 65mm half thread.
64
-
-
... More
Renewal of bed frame and its concrete foundation & compressor with motor to suit the new screw chiller with condenser assembly, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Bend/ MS/ Seamless short bend/ 150NB/Sch-40.
8
-
-
... More
Dismantling of all cable connections after disconnecting power supply, removing out all indicators, probes and other instruments, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Pressure testing and vaccumising the referigent line, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Providing digital temperature gauges at inlet and outlet of condenser and chiller unit, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Fabrication of M.S Bed frame to suit new screw chiller and fixing on the newly prepared concrete foundation including anchor bolt & nut, damper pads with horizontal plates jack bolts for alignment, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Reconnecting the condenser water lines with new MS ERW pipes, with necessary, bends, butterfly valves manual balancing valves and flanged joints by fabricating to suit the site and coating with polyrethane paint, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Modification of the existing control power panels to suit the new chiller package by adopting existing panel and providing new operation panel, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Pressure gauge/ 7800005609/ Bourdon 0 to 16KSC dial 150mm bottom entry half inch NPTM.
2
-
-
... More
Filling of ultra coolant YORK oil for lubrication of compressor, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
Reconnecting the chiller water lines with new MS ERW pipes, with necessary, bends, butterfly valves and flanged joints by fabricating to suit the site and providing polyrethane cladding for 50mm thick and coating with water proof compound, including the cost of consumables and hire charges for T&P’s.
1
-
-
... More
York ‘L’ Oil/ York/ P No.011-00592-000. (5 Gal drum).
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements