Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Eprocure
Opening Date19 Sep 2020
Closing Date30 Sep 2020
Tender Amount₹ 1,67,01,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 0/0 - 1/0

134.61

-

-

... More
Km 1/0 - 2/00

134.61

-

-

... More
Km 2/0 - 2/200

27

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

281.84

-

-

... More
Km 1/0 - 2/00

280.43

-

-

... More
Km 2/0 - 2/200

56.25

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

281.84

-

-

... More
Km 1/0 - 2/00

280.43

-

-

... More
Km 2/0 - 2/200

56.25

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 2/200

8268.75

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 1/0

3768.75

-

-

... More
Km 1/0 - 2/00

3750

-

-

... More
Km 2/0 - 2/200

750

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

29.77

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

4.25

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

4.25

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

43.08

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

115.91

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

11.25

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

0.31

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

3.31

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

3.36

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

4.5

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

15

-

-

... More
Providing weep holes in abutment wingwall and returnwall with 100mm dia AC pipes as per clauses 6147091204

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

8.8

-

-

... More
Provision for Km stone

2

-

-

... More
Provision for Hm stone

9

-

-

... More
Provision for Name board

1

-

-

... More
2.Upgradation of the road from Mathur-Ayanarkovil to Azhagiyamanavalam road Km 0/0 - 1/460 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

1573.67

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

983.54

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 1/0

134.61

-

-

... More
Km 1/0 - 1/460

62.1

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

242.63

-

-

... More
Km 1/0 - 1/460

103.5

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

242.63

-

-

... More
Km 1/0 - 1/460

103.5

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 1/460

4623.75

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 1/0

3243.75

-

-

... More
Km 1/0 - 1/460

1380

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

42.44

-

-

... More
Protectivewall @ Ch 300-310m

13.5

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

5.31

-

-

... More
Protectivewall @ Ch 300-310m

2.25

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

5.31

-

-

... More
Protectivewall @ Ch 300-310m

2.25

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

47.65

-

-

... More
Protectivewall @ Ch 300-310m

22.73

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

133.27

-

-

... More
Protectivewall @ Ch 300-310m

96

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

11.25

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

0.35

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

3.31

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 300m

3.36

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

4.5

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

3.15

-

-

... More
Providing weep holes in abutment wingwall and returnwall with 100mm dia AC pipes as per clauses 6147091204

-

-

-

... More
1.50 M RCC slab Culvert @ Ch1900m

8.8

-

-

... More
Provision for Km stone

1

-

-

... More
Provision for Hm stone

6

-

-

... More
Provision for Name board

1

-

-

... More
3.Strengthening the road from Palinganatham to Muthuvathur road Km 0/0 - 1/200 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

2160

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

360

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0 - 1/0

135

-

-

... More
Km 1/0 - 1/200

27

-

-

... More
Picking the old BT surface and Metal surface including all labour charges etc.,

1500

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

282.66

-

-

... More
Km 1/0 - 1/200

56.25

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 0/0 - 1/0

282.66

-

-

... More
Km 1/0 - 1/200

56.25

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 0/0 - 1/200

4518.75

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 0/0 - 1/0

3768.75

-

-

... More
Km 1/0 - 1/200

750

-

-

... More
Provision for Km stone

1

-

-

... More
Provision for Hm stone

5

-

-

... More
Provision for Name board

1

-

-

... More
4.Strengthening the road from Puthur to Ayansuthamalli road Km 1/550 - 2/100 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers

651.84

-

-

... More
Picking the old BT surface and Metal surface including all labour charges etc.,

679

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

162.96

-

-

... More
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 1/550 - 2/0

59.83

-

-

... More
Km 2/0 - 2/100

13.5

-

-

... More
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 1/550 - 2/0

124.65

-

-

... More
Km 2/0 - 2/100

28.13

-

-

... More
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)

-

-

-

... More
Km 1/550 - 2/0

124.65

-

-

... More
Km 2/0 - 2/100

28.13

-

-

... More
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.

-

-

-

... More
Km 1/550 - 2/100

2062.5

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Km 1/550 - 2/0

1687.5

-

-

... More
Km 2/0 - 2/100

375

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

34.02

-

-

... More
Protectivewall @ Ch 1800m

135.14

-

-

... More
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

4.25

-

-

... More
Protectivewall @ Ch 1800m

30.03

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

4.25

-

-

... More
Protectivewall @ Ch 1800m

30.03

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

43.13

-

-

... More
Protectivewall @ Ch 1800m

77.22

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

115.92

-

-

... More
Protectivewall @ Ch 1800m

514.8

-

-

... More
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab & Bed Block)

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

11.25

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

0.32

-

-

... More
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

3.31

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

3.36

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

4.5

-

-

... More
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

3.15

-

-

... More
Providing weep holes in abutment wingwall and returnwall with 100mm dia AC pipes as per clauses 6147091204

-

-

-

... More
1.50 M RCC slab Culvert @ Ch- 2095m

8.8

-

-

... More
Provision for Km stone

1

-

-

... More
Provision for Hm stone

2

-

-

... More
Provision for Name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.