Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Aug 2024
Closing Date5 Sep 2024
Tender Amount₹ 18,00,000
Costs
EMD
₹ 18,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_478074_1Tender No
Roc. No. AS No 433/2024/A4/AD(P) Dt.18.07.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work Open well excavation complying with relevent clusses of TNDSS well singing and with lead up to 10 Meter in Medium rock not requiring blastering etc compled.,
47.49
-
-
Earth work Open well excavation complying with relevent clusses of TNDSS well singing and with lead up to 10 Meter in Medium rock requiring blastering etc compled.,
-
-
-
6-8 Meter 4th depth
47.54
-
-
8-10 Meter 5th depth
47.54
-
-
Earth work Open well excavation complying with relevent clusses of TNDSS well singing and with lead up to 10 Meter in Hard rock requiring blastering etc compled.,
-
-
-
10-12 Meter 6th depth
47.54
-
-
12-14 Meter 8th depth
33.28
-
-
Cement contrete 1:4:8 mix using 40 mm metal including cost and conveyance all labour charges etc., completed
2.39
-
-
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.95 cm x 60 cm and 10 guage stilfaned welded with mild steel angle
217.61
-
-
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
1.25
-
-
RCC 1:1.5 :4 mix using 20 mm metal including cost and conveyance all labour charges etc., completed
25.97
-
-
Provision for Dewatering charges
1
-
-
Provision for Geoligist survey Inculding all labur charges
1
-
-
Provision for Test Bore
20
-
-
Providing Fencing Arrangements
-
-
-
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete.
2.55
-
-
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
0.42
-
-
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement using MS Sheet, MS angles and Casriano probs etc., complete
12.6
-
-
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
0.71
-
-
Supply and Delivery of Barbed wire using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete.
76.4
-
-
Labour Charges for Barbed wire and Chain Link using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete.
19.1
-
-
Supply and Delivery of Chain Link - 2" x 2" using 10 Gauge Galvanised Iron Wire (of all sizes) including cost and conveyance all labour charges etc complete.(SOR 2022-23 Item No 134)
40.11
-
-
Supply and fixing of RCC Piller Post of size 0.15mx0.15mx2.10m including cost and conveyance all Labour charges etc complete.
15
-
-
Supply and fixing of Grill Door of size 0.90mx2.10 m including cost and conveyance all labour charges etc complete.
105
-
-
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
3.78
-
-
Open Well Top Cover
-
-
-
Supplying and delivering of mild steel grill cover for open well including all labour charges for straightening cutting to length bending to shape in position and forming grills with fixing in position etc complete
826.42
-
-
Supplying and delivering of weld mesh 10x10cm 10 gauge including all labour charges for straightening cutting to length bending to shape in position and forming grills with fixing in position etc complete
36.52
-
-
Towards cost and supply of flat steel rod 25mmx25mmx6mm thick including all labour charges etc.complete
167.38
-
-
Towards cost of Transportion charges for Ms angle and grills with weld mesh
1
-
-
Labour charges for welding and fixing charges for Ms angle and grills with weld mesh
1
-
-
Painting two coats over new iron works using ready mixed enamel paint with one coat of red oxide primer including cost and conveyance of paint and all labour charges etc complete
113.71
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements