Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date2 Feb 2024
Closing DateCancelled
Tender Amount₹ 15,39,000
Costs
EMD
₹ 15,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_417081_1Tender No
6525/2023/A13-1dated29.12.2023Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
9.77
-
-
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.Foundation and Basement
6.27
-
-
Ground Floor
34.82
-
-
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Foundation and Basement
7.57
-
-
Ground Floor
12.84
-
-
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.Below GL
38.84
-
-
Above GL
129.38
-
-
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
1.6
-
-
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications .
3.43
-
-
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
50.36
-
-
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
308.3
-
-
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc.
67.09
-
-
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and including cost and conveyance and all labour charges etc,.
0.7
-
-
Paving the Floor with scratch proof vertified tiles of size 600x600x8mm laid in CM 1;2,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to siut the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc complete
25.81
-
-
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
7.93
-
-
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification.
13.25
-
-
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes 150mmX 150mmX 6mm set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc.,
13.17
-
-
Towards the cost of steel door of size .9 mx2.4m including all charges etc.
2.16
-
-
Towards the cost of steel door of size 0.75mx1.5 m including all charges etc.
1.13
-
-
Towards the cost of steel door of size 1.10mx2.4 m including all charges etc.
7.92
-
-
Towards the cost of steel ventilator of size 0.9x0.45 m including all charges etc.
0.41
-
-
Towards the cost of steel window of size 1.8m*1.6m including all charges
11.52
-
-
Towards the cost of steel Window of size 1.5mx1.6 m including all charges etc.
6
-
-
Painting two coat with approved quality of distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
167.62
-
-
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
141.48
-
-
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
51.06
-
-
LIGHT POINT SD 20
8
-
-
FAN POINT SD 20
2
-
-
FAN point SD110
2
-
-
Plug point (SD36)
2
-
-
CFL lamp (SD80)
4
-
-
TUBE Light Fittings ( SD 88 )
3
-
-
DPI swtich of 500 V (SD142)
1
-
-
G I Pipe (SD69)
3
-
-
Service Wire (SD64)
10
-
-
Bulk head fitting (SD83)
1
-
-
500 lit tank
1
-
-
25mm UPVC pipe
3
-
-
25mm UPVC elbow
10
-
-
25mm UPVC Bend
4
-
-
25 mm UPVC Tee
4
-
-
110 mm PVC PIPE 6Ksc
6
-
-
110mm pvc tee
1
-
-
110mm pvc elbow
3
-
-
15 mm diacp down tap
7
-
-
Cost & Supply For Baby W.C including cost and conveyance of all materials to work site and labor charges etc complete.
1
-
-
Cost & Supply For E W.C including cost and conveyance of all materials to work site and labor charges etc complete.
1
-
-
Cost & Supply For Flat Black Urinal Trap including cost and conveyance of all materials to work site and labor charges etc complete.
2
-
-
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall iirected by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
2
-
-
Cost & Supply of Cudappah Slab including cost and conveyance of all materials to work site and labor charges etc complete.
4.32
-
-
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
6
-
-
Provision for Hand Rail for SS Works
3
-
-
Provision for name board charges
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements