Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Eprocure
Opening Date11 Feb 2019
Closing Date21 Feb 2019
Tender Amount₹ 1,66,97,215 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Thanjavur District - Upgradation And Strengthening Of 12 Roads In Package No.02 Thanjavur Block In Thanjavur District Under Scpar - 2018-2019 Tranche.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KM 1/0-1/240

86.4

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-1/0

1000

-

-

... More
KM 1/0-1/240

240

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-1/0

225

-

-

... More
KM 1/0-1/240

54

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/240

720

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/240

720

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-1/0

120

-

-

... More
KM 1/0-1/240

21.6

-

-

... More
Supply and fixing of Kilometre stone (Three faces two lines dressed) of size (1.65m X 0.45m X 0.15m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

5

-

-

... More
Provision for Name board

1

-

-

... More
Part.2. Strengthening of Philomina nagar 2nd street in Nanjikottai panchayat Km 0/0-1/250.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-1/0

360

-

-

... More
KM 1/0-1/250

90

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-1/0

1000

-

-

... More
KM 1/0-1/250

250

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-1/0

225

-

-

... More
KM 1/0-1/250

56.25

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/250

750

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/240

750

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-1/0

120

-

-

... More
KM 1/0-1/250

22.5

-

-

... More
Supply and fixing of Kilometre stone (Three faces two lines dressed) of size (1.65m X 0.45m X 0.15m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

5

-

-

... More
Provision for Name board

1

-

-

... More
Part.3. Strengthening of Adaikalamadha nagar road in Nanjikottai panchayat Km 0/0-1/050.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-1/0

360

-

-

... More
KM 1/0-1/050

18

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/580

580

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).

-

-

-

... More
KM 0/580-1/0

126

-

-

... More
KM 1/0-1/050

15

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.II using 1 cum of 75 mm to 22.4 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete.

-

-

-

... More
KM 0/580-1/0

94.5

-

-

... More
KM 1/0-1/050

11.25

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-1/0

225

-

-

... More
KM 1/0-1/050

11.25

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/050

150

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-1/0

3000

-

-

... More
KM 1/0-1/050

150

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-1/0

107.4

-

-

... More
KM 1/0-1/050

9

-

-

... More
Supply and fixing of Kilometre stone (Three faces two lines dressed) of size (1.65m X 0.45m X 0.15m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

4

-

-

... More
Provision for Name board

1

-

-

... More
Part.4. Strengthening of EB colony 1st street in Nanjikottai panchayat Km 0/0 - 0/600.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/600

216

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/600

600

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/600

135

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/600

1800

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/600

1800

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/600

72

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

3

-

-

... More
Provision for Name board

1

-

-

... More
Part.5. Strengthening of Periyar Nagar road in Nanjikottai panchayat Km 0/0 - 0/700.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/700

252

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/700

700

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/700

157.5

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/700

2100

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/700

2100

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/700

80.28

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

3

-

-

... More
Provision for Name board

1

-

-

... More
Part.6. Strengthening of EB colony 3rd street in Nanjikottai panchayat Km 0/0 - 0/800.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/800

288

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/800

1000

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/800

225

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/800

3000

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/800

3000

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/800

96

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

4

-

-

... More
Provision for Name board

1

-

-

... More
Part.7. Strengthening of Palaniyappa nagar road in Nanjikottai panchayat Km 0/0 - 0/610.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/610

219.6

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/610

690.25

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/610

155.31

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/610

2070.75

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/610

2070.75

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/610

73.2

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

3

-

-

... More
Provision for Name board

1

-

-

... More
Part.8. Upgradation of Balaji nagar road in Pudhupattinam panchayat Km 0/0 - 0/800.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/800

144

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).

-

-

-

... More
KM 0/0-0/800

240

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.II using 1 cum of 75 mm to 22.4 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete.

-

-

-

... More
KM 0/0-0/800

180

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/800

180

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/800

108

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

4

-

-

... More
Provision for Name board

1

-

-

... More
Part.9. Strengthening of Korikulam road in Pudhupattinam panchayat Km 0/0 - 0/800.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/800

288

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/800

800

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/800

180

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/800

85.5

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

4

-

-

... More
Provision for Name board

1

-

-

... More
Part.10.Strengthening of Korikulam puthu theru in Pudhupattinam panchayat Km 0/0 - 0/800

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/800

288

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/800

800

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/800

180

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/800

2400

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/800

90

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

4

-

-

... More
Provision for Name board

1

-

-

... More
Part.11. Strengthening of Lenin anna indira periyar theru in Pudhupattinam panchayat Km 0/0 - 0/620.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/620

223.2

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/620

620

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/620

139.5

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/620

1860

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/620

1860

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/620

70.8

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

3

-

-

... More
Provision for Name board

1

-

-

... More
Part.12. Strengthening of Cheran pillaiyar kovil theru in Pudhupattinam panchayat Km 0/0 - 0/650.

-

-

-

... More
Earthwork excavation and depositing on bank with an initial lead of 10m and lift 2 m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth etc., as per SS 20 A to including laying and spreading in layers of 250 mm loose thick each, sectioning, watering and compacting by power roller to achieve the required Proctor density at 100& compaction at optimum moisture content as determined in occurrence with IS 2720 (Part VII) including finishing the surface to the required camber and longitudinal profile including all leads for water and hire & fuel charges roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per MOST 301 -305.

-

-

-

... More
KM 0/0-0/650

234

-

-

... More
Picking the existing B.T surface upto 50 mm - 100 mm thick including all labour charges for picking hand packing leveling and consolidation by power rolling including all labour charges etc,. Complete.

-

-

-

... More
KM 0/0-0/650

650

-

-

... More
Providing and laying 75 mm compacting thick WBM Gr.III using 1 cum of 63 mm to 11.20 mm IRC metal and 0.24 cum of Gravel for blindage 10 sqm. Of 75 mm compacted thick (the blindage material shall have PI value less than 6%) Including cost and conveyance of all material from approved quarry to worksite and stacking to departmental metric gauge for pre – measurement as directed by the departmental officers including labour charges for spreading metal and gravel hand packing to proper camber and grade line blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing as per MORT & H 404 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed there for and all other incidental charges etc., complete for top layer.

-

-

-

... More
KM 0/0-0/650

146.25

-

-

... More
Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification.

-

-

-

... More
KM 0/0-0/650

1950

-

-

... More
Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete.(Mini hot mix Plant)

-

-

-

... More
KM 0/0-0/650

1950

-

-

... More
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
KM 0/0-0/650

29.25

-

-

... More
Supply and fixing of Hectometre stone of size (0.75m X 0.23m X 0.10m) from approved sources including cost and conveyance to work site and fixing in position as directed by the departmental officers and all other incidental charges etc., complete.

3

-

-

... More
Provision for Name board

1

-

-

... More
Construction of 2.00m RCC slab curvert @ chainage 0m.

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch 0m

94.56

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch 0m

10.51

-

-

... More
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

-

-

-

... More
Culvert @ Ch 0m

10.51

-

-

... More
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. ( Below Basement)

-

-

-

... More
Culvert @ Ch 0m

151.04

-

-

... More
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. ( Above Basement)

-

-

-

... More
Culvert @ Ch 0m

29.08

-

-

... More
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

-

-

-

... More
Culvert @ Ch 0m

86.39

-

-

... More
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.

-

-

-

... More
Culvert @ Ch 0m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch 0m

4.1

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch 0m

0.466

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.