Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Eprocure
Opening Date6 Jan 2021
Closing Date19 Jan 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Dharmapuri District - Construction Of Pues 2 Class Room School Building At Muthampatti Pues School H/o Elagiri In Package No. Tn04-01/ Rcsids 2020-2021 Nallampalli Block P01

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.

18.82

-

-

... More
Brick work in CM 1:5 mix using country bricks, ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.

37.17

-

-

... More
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying with standard specifications and as directed by the departmental officers.

-

-

-

... More
Ground Level

71.8

-

-

... More
Lintel Level

39.69

-

-

... More
Sunshade

15.64

-

-

... More
Roof Level

164.18

-

-

... More
Reinforced cement concrete 1: 1 1/2 :3 (One of cement one and half of sand and three of hard broken stone jelly) using 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works excluding cost and fabrication of reinforcement grills.

39.48

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

3.9

-

-

... More
Supply and Fabrication of Steel door 1.20 x 2.10m includining Cost and Conveyance of all Cherges etc complete.

2

-

-

... More
Supply of Steel Windlows 1.20 X 2.1m including labour charges for fixing etc.

6

-

-

... More
Supply of Cuddapha Slab 0.75 x 2.10m includining Cost and Conveyance of all Cherges etc complete.

40.45

-

-

... More
Labour Charges for fixing of Doors

5.04

-

-

... More
Labour Charges for fixing Windows

9.36

-

-

... More
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.

391.28

-

-

... More
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.

138.19

-

-

... More
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum

66.81

-

-

... More
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required design & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental officers. Rate for 10m3+

7.08

-

-

... More
Finished the top of roof with one course fo pressed tiles of size 23X23X2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour

99.37

-

-

... More
Paving the Floor with scratch prof ceromic tiles of size 305X305X6 mm including cost and conveyance of all materials to site and all labour charges etc complete

60

-

-

... More
Painting using oil distemper over plaster surface and ceiling etc including all other labour charges etc

316.42

-

-

... More
Painting using Exterior emulsion paint over plaster surface and ceiling etc including all other labour cahrges etc

211.95

-

-

... More
Painting using over new iron works such as door and windows etc including all other labour charges etc.

28.8

-

-

... More
Provision for Rainwater downfall PVC 110mm dia pipe

31

-

-

... More
Electrical Arrangements

-

-

-

... More
Light & Fan Point SD No.26

16

-

-

10

-

-

... More
Supplying and fixing oof Fan SD 110

4

-

-

... More
Plug Point SD 139

4

-

-

... More
Rainwater Harvesting Structures

1

-

-

... More
Key & Lock

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.