Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date12 Nov 2018
Closing Date19 Dec 2018
Tender Amount₹ 2,80,44,000 
Notes
Download

Costs

Summary

Dharmapuri Dt - Upgradation Of The Road 2 No In Package No.tn04-135 Of Harur Block P135

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Km. 0/0-1/0

2.35

-

-

... More
Km. 1/0-2/0

3.23

-

-

... More
Km. 2/0-3/0

134.03

-

-

... More
Km. 3/0-4/0

5.53

-

-

... More
Km. 4/0-4/8

3.69

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
Km. 0/0-1/0

2.35

-

-

... More
Km. 1/0-2/0

3.23

-

-

... More
Km. 2/0-3/0

134.03

-

-

... More
Km. 3/0-4/0

5.53

-

-

... More
Km. 4/0-4/8

3.69

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)

-

-

-

... More
Km. 0/0-1/0

1150.9

-

-

... More
Km. 1/0-2/0

1195.21

-

-

... More
Km. 2/0-3/0

1000.3

-

-

... More
Km. 3/0-4/0

1042.57

-

-

... More
Km. 4/0-4/8

962.36

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km. 0/0-1/0

557.61

-

-

... More
Km. 1/0-2/0

562.5

-

-

... More
Km. 2/0-3/0

555.98

-

-

... More
Km. 3/0-4/0

559.24

-

-

... More
Km. 4/0-4/8

443.48

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)

-

-

-

... More
Km. 0/0-1/0

285.27

-

-

... More
Km. 1/0-2/0

284.3

-

-

... More
Km. 2/0-3/0

280.4

-

-

... More
Km. 3/0-4/0

279.62

-

-

... More
Km. 4/0-4/8

224.14

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)

-

-

-

... More
Km. 0/0-1/0

285.27

-

-

... More
Km. 1/0-2/0

284.3

-

-

... More
Km. 2/0-3/0

280.4

-

-

... More
Km. 3/0-4/0

279.62

-

-

... More
Km. 4/0-4/8

224.14

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km. 0/0-1/0

390.37

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km. 0/0-1/0

401.25

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.

-

-

-

... More
Km. 0/0-1/0

401.25

-

-

... More
Providing and laying Seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Km. 0/0-1/0

401.25

-

-

... More
High porosity Providing and applying primer coat with cationic bitumen emulsion (water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.

-

-

-

... More
Km. 0/0-1/0

3413.37

-

-

... More
Km. 1/0-2/0

3790.72

-

-

... More
Km. 2/0-3/0

3738.89

-

-

... More
Km. 3/0-4/0

3728.25

-

-

... More
Km. 4/0-4/8

2988.69

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with ZycoTherm Providing, laying and rolling of 20mm thick open-graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate of 1 Kg per 1 ton of Binder. Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade or emulsion grade with Nanotechnology based material to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. (ref:Mord pg.no 5-24).

-

-

-

... More
Km. 0/0-1/0

3435.13

-

-

... More
Km. 1/0-2/0

3790.72

-

-

... More
Km. 2/0-3/0

3782.41

-

-

... More
Km. 3/0-4/0

3750

-

-

... More
Km. 4/0-4/8

3032.21

-

-

... More
Providing and laying of Seal coat modified with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate 1 Kg per 1 ton of Binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical specification Clauses 510.

-

-

-

... More
Km. 0/0-1/0

3435.13

-

-

... More
Km. 1/0-2/0

3790.72

-

-

... More
Km. 2/0-3/0

3782.41

-

-

... More
Km. 3/0-4/0

3750

-

-

... More
Km. 4/0-4/8

3032.21

-

-

... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81

-

-

-

... More
Km. 0/0-1/0

5.62

-

-

... More
Km. 1/0-2/0

5.62

-

-

... More
Km. 2/0-3/0

5.62

-

-

... More
Km. 3/0-4/0

5.62

-

-

... More
Km. 4/0-4/8

5.62

-

-

... More
Providing and Fixing 'Logo' of PMGSY project

4

-

-

... More
KM Stone

5

-

-

... More
HM Stone

20

-

-

... More
Cautionary Sign Board

35

-

-

... More
Circular Board

20

-

-

... More
Traffic Sign Board

16

-

-

... More
Reflector

35

-

-

... More
Guard Stone

45

-

-

... More
Citizen Information Board

1

-

-

... More
Maintenance Board

1

-

-

... More
Name Board

1

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.10 Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.10 Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.10 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.720 Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.720 Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.720 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.890 Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.890 Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.890 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.2300 Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.2300 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.2450 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.2450 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.2600 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.2600 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.2900 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.2900 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.3200 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.3200 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.3685 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.3685 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.4165 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.4165 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.4335 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.4335 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.4435 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.4435 m

8.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

17.87

-

-

... More
Removing all types of hume pipes and stacking within a lead of 1000m including earthwork and dismantaling of masonary works as per technical specification clause 202

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

7.5

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

90.3

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

10.32

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

10.32

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m Below Sill

50.64

-

-

... More
1.5m Span Culvert @ Ch.4780 m Above Sill

27.76

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

0.35

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.4780 m

8.8

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Protective works @ Ch.1695 - 1705 m

11.25

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works @ Ch.1695 - 1705 m

2.25

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works @ Ch.1695 - 1705 m

3

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works @ Ch.1695 - 1705 m Below Sill

5.4

-

-

... More
Protective works @ Ch.1695 - 1705 m Above Sill

11.35

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Protective works @ Ch.1695 - 1705 m

20

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year

1

-

-

... More
For 2nd year

1

-

-

... More
For 3rd Year

1

-

-

... More
For 4th Year

1

-

-

... More
For 5th Year

1

-

-

... More
Upgradation of the road from L068 - Harur - Sitheri road Km.0/0-1/200

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.

2880

-

-

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

1476.75

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Km. 0/0-1/2

220.09

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
Km. 0/0-1/2

220.09

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( Carted Earth)

-

-

-

... More
Km. 0/0-1/2

999.55

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
Km. 0/0-1/0

554.51

-

-

... More
Km. 1/0-1/2

110.02

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)

-

-

-

... More
Km. 0/0-1/0

281.94

-

-

... More
Km. 1/0-1/2

55.01

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)

-

-

-

... More
Km. 0/0-1/0

281.94

-

-

... More
Km. 1/0-1/2

55.01

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
Km. 0/0-1/0

3759.24

-

-

... More
Km. 1/0-1/2

733.5

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km. 0/0-1/0

3812.49

-

-

... More
Km. 1/0-1/2

750

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.

-

-

-

... More
Km. 0/0-1/0

3812.49

-

-

... More
Km. 1/0-1/2

750

-

-

... More
Providing and laying Seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Km. 0/0-1/0

3812.49

-

-

... More
Km. 1/0-1/2

750

-

-

... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81

-

-

-

... More
Km. 0/0-1/0

5.62

-

-

... More
Km. 1/0-1/2

5.62

-

-

... More
Providing and Fixing 'Logo' of PMGSY project

2

-

-

... More
KM Stone

1

-

-

... More
HM Stone

5

-

-

... More
Cautionary Sign Board

8

-

-

... More
Circular Board

4

-

-

... More
Traffic Sign Board

4

-

-

... More
Reflector

20

-

-

... More
Guard Stone

20

-

-

... More
Citizen Information Board

1

-

-

... More
Maintenance Board

1

-

-

... More
Name Board

1

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

2.7

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

96.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

11.05

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

11.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.620 Below Sill

54.38

-

-

... More
1.5m Span Culvert @ Ch.620 Above Sill

43.92

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Deck Slab @ Ch.1750 m

4.68

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

0.48

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.620 m

8.81

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

2.7

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

96.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

11.05

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

11.04

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.770 Below Sill

54.38

-

-

... More
1.5m Span Culvert @ Ch.770 Above Sill

44.28

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

8.1

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

0.88

-

-

... More
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Span Culvert @ Ch.770 m

8.81

-

-

... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)

-

-

-

... More
For 1st year

1

-

-

... More
For 2nd year

1

-

-

... More
For 3rd Year

1

-

-

... More
For 4th Year

1

-

-

... More
For 5th Year

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.